Clean Power Plan & Reliability – An Update TEPPC Winter 2016 Meeting February 3 rd – 4 th 2016 Vijay Satyal PhD, Sr. Policy Analyst W ESTERN E LECTRICITY.

Slides:



Advertisements
Similar presentations
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Advertisements

Strategic Planning Update For Board Meeting December 5, 2007.
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
Gas-Electric Coordination Update JGC Meeting August 23-24, 2012.
Intelligence Step 5 - Capacity Analysis Capacity Analysis Without capacity, the most innovative and brilliant interventions will not be implemented, wont.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Auditing, Assurance and Governance in Local Government
Reliability Challenges White Paper Victoria L. Ravenscroft Senior Policy Analyst W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
Planning challenges for RE Deployment North African perspective Addressing Variable Renewables in Long-Term Energy Planning (AVRIL) : 2-3 March 2015 Rim.
Western Planning Regions Interregional (IR) Coordination Activities
RPCG – CCTA Process Vijay Satyal & Colby Johnson Reliability Planning & System Adequacy April 28, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Western States Energy & Environment Symposium October 27, 2009.
Compliance Monitoring Strategy/Schedule Kim Israelsson Manager, Compliance Program Coordination and Process Integration.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
Internal Auditing and Outsourcing
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
Electric Reliability and the Clean Power Plan Branden Sudduth Director, Reliability Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
Variable Generation Subcommittee Michelle Mizumori WECC January 6, 2010.
United States Department of Agriculture Food Safety and Inspection Service 1 National Advisory Committee on Meat and Poultry Inspection August 8-9, 2007.
Update on System Adequacy Planning (SAP) Activities May 5 th -6 th 2015 SPSG Meeting Ben Brownlee, P.E.., Dan Beckstead, Stan Holland, Vijay Satyal PhD.
Thoughts on Order 1000 and Western Clean Energy Needs Doug Larson September 10, 2015.
Update: 4.9 Work Team on Committee Role, Scope and Structure Melanie Frye Vice President, Reliability Planning and Performance Analysis W ESTERN E LECTRICITY.
Federal Energy Regulatory Commission Role Of The Market Monitor: ISO New England Dr. Hung-po Chao Director, Market Monitoring FERC Open Meeting Washington,
Reliability Assurance Initiative (RAI) 101 Ben Christensen Senior Compliance Risk Analyst, Cyber Security.
Northwest Power and Conservation Council Action Plan Summary.
Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph.
Environmental and Cultural Data Use in Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
What do we mean by “Energy?
Reliability Planning Priorities for 2015 Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
FERC Staff’s Report on Demand Response and Advanced Metering.
TEPPC Meeting May 6-7, 2015 Salt Lake City, UT Thomas Carr Western Interstate Energy Board State-Provincial Steering Committee Update.
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
Clean Air Act Section 111 WESTAR Meeting Presented by Lisa Conner U.S. Environmental Protection Agency Office of Air and Radiation November 6, 2013.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Document Categorization Policy Chris Albrecht, Legal Counsel W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PJM©2014www.pjm.com A System Operator’s Resilience Wish List Tom Bowe Executive Director Reliability and Compliance PJM Interconnection
TEPPC 2015 Work Plan Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
JJ Jamieson MIC Chair MIC 2015 GOALS March 24, 2015 SLC.
Regional System Operator Issues Analysis Ron Lehr Western Clean Energy Advocates January 7, 2016.
WECC Reliability Study Requests Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
TAS & TEPPC Update CCTA Assumptions Vijay Satyal - RPCG Liaison, Sr. Policy Analyst & Colby Johnson - Associate Engineer, SAP W ESTERN E LECTRICITY.
MWG Meeting March 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Reliability Subcommittee Report Vishal C. Patel (RS Chair) PCC Meeting La Jolla, CA- March 22, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
North America Energy Standards Board Craig L. Williams, Specialist Ld./Sr. ISAS Meeting April 20, 2016 Salt Lake City, UT W ESTERN E LECTRICITY C OORDINATING.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
North America Energy Standards Board Craig L. Williams, Specialist Ld./Sr. MIC Meeting March 23, 2016 La Jolla, CA W ESTERN E LECTRICITY C OORDINATING.
Path Operator Implementation Task Force Vic Howell, Vice Chair Report to OC March 22, 2016.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Regional Implications of the Clean Power Plan Lanny Nickell Midwest Energy Policy Conference October 6 th,
Market Operations Engagement Group EVSE Working Group – Principles
Reliability Assessment Committee Proposal TSS Meeting
Natural Gas Infrastructure Assessment
MAC Board Effectiveness Survey
Reliability Assessment Committee Reliability Workshop Priorities
April 2011.
WECC Staff Risk Prioritization
Byron Woertz, Manager—System Adequacy Planning
Reliability Assessment Committee Reliability Workshop Priorities
Byron Woertz, Manager—System Adequacy Planning
TEPPC Meeting May 6-7, 2015 Salt Lake City, UT
WECC Staff Risk Prioritization
MAC Board Effectiveness Survey
Energy Storage System Drivers and Use Cases for Energy Storage Systems
Presentation transcript:

Clean Power Plan & Reliability – An Update TEPPC Winter 2016 Meeting February 3 rd – 4 th 2016 Vijay Satyal PhD, Sr. Policy Analyst W ESTERN E LECTRICITY C OORDINATING C OUNCIL

WECC’s Strengths Wide-area perspective with an independent focus on electric reliability Interconnection-wide studies and assessments – Transmission and resource adequacy – Historical performance analysis and data trending – Contingency analysis Information collection and model development Coordination with and amongst various power sector stakeholders Subject matter expertise – In-house and access to external entities/resources 2 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Legal Update U.S. Court of Appeals – DC Circuit denied a request to halt implementation “until” the legality of the issue is addressed. Court fast-tracked consideration of the legality to June 2 nd – Legality of CPP. Irrespective of this outcome, expectations are high for U.S. Supreme Court to hear the case. 3 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

FERC Staff Paper (# AD ) FERC Staff issued “white paper” to support the EPA-DOE-FERC Coordination effort.white papereffort Recommends 4 principles to assist with Reliability focused planning for CPP analyses – Transparency and stakeholder engagement* – Study methodology and interactions between studies – Study inputs, sensitivities and probabilistic analysis – Tools and techniques Cites typical reliability studies to be considered in conjunction with integrated gas-electric simulations* 4 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

CNEE – Compliance Design & Evaluation 5- state model –MT, WY, UT, CO and NM Evaluate CPP compliance and design Focus to bring in other 7 western states 5 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

NERC Effort: Clean Power Plan & Reliability 6 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

NERC Reliability Considerations Report Focus: Inform state regulators (environmental and rate-payer), stakeholders and executive branches of reliability aspects of BES. Findings are neither “prescriptive” nor “an all- inclusive” review. Underscore the elements of reliability that states need to consider as they develop their CPP- Implementation Plans. 7 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

NERC Report- 1 Core advisory team representative of different NERC regions (WECC was a member) CPP NERC taskforce reviewed report produced by core advisory team. Extra efforts taken to ensure focus on Reliability: – Costs of compliance / market design not a driver – ISO/RTO and non-ISO/RTO frameworks were given due recognition. – Sensitive to future “multi-state” compliance plans. 8 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Broader Intent- NERC Report Facilitate a dialogue as issues/need arise Engage NERC or regional entities as reliability studies are being undertaken/requested – WECC is available to assist and learn from any local/regional reliability studies – Continue to enhance internal capabilities WECC is committed to an Interconnection-wide perspective of Reliability assessment of CPP. 9 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Essential Reliability Services (ERS) Driver: Changing resource mix – Needs voltage control, frequency support and ramping flexibility ERS report offers a suite of recommendations: ERS report – Observe trends, reliability measures and recommend use of industry practices. – Options for Sys-Operators to modify real-time operations – Further examination of the forecasting, visibility, controllability and participation of DER as an active part of the electric grid. 10 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

WECC Cross-functional team Monitor CPP stakeholder processes Leverage data and analytical capabilities Provide objective regional perspective Open to feedback for future interconnection- wide impacts 11 W ESTERN E LECTRICITY C OORDINATING C OUNCIL Resource Mix & Transmission Use System Stability Analysis Resource Adequacy & Natural Gas Sector Policy and General Oversight

Current efforts Start tracking state-level stakeholder efforts Identify issues/questions WECC may have Welcome ideas/questions about reliability studies entities especially may undertake Other options on better coordination 12 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

13 Vijay Satyal – Sr. Policy Analyst

Potential Reliability Implications of CPP Resource mix and adequacy challenges – – Are the renewable resources available on peak? – Is transmission availability adequate? System Stability – – Will path flows change across the interconnection? – Will system remain stable and within ideal “frequency” and “voltage” limits? – What unknown issues will arise? Operational effects – – Will the system have the flexibility needed to meet ramp? – Will natural gas be available when and where needed? 14 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Future Data needs Detailed information on retirements and new resources (turbine types, location, capacity factor) Specificity on attribution of multi-state compliance, if retiring units are jointly-owned or jointly-operated Renewable energy growth criteria Treatment of energy efficiency in plans Better data on intra-state and inter-state gas pipeline flows (contingency events) 15 W ESTERN E LECTRICITY C OORDINATING C OUNCIL