Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting, 9 th November 2015 1 Phil Allport, Matt Baca, Daniel Briglin, James.

Slides:



Advertisements
Similar presentations
LHCb VELO Production Visit November 9 th 2005 Introduction to staff Status Schedule.
Advertisements

Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
News from B180: DC-DC Stavelet with HV MUX One hybrid shows ~20ENC extra noise, others much the same. Not yet understood - investigations continue Carlos.
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS Module building at Glasgow
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
MOM Summary 11/01/10 Due to the Inclement Weather it has perhaps been quieter than usual Water - Tank has been holding water fine. Some ice has been forming.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
1 UCSB Module Assembly Week of 4/11 – 4/15. 2 UCSB Parts Inventory 4/4/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 1 ATLAS Tracker Upgrade: Hybrid Wire-Bonding and Test Setup at Birmingham.
Openergo A self-build rowing machine
Received new "130nm" jigs from Liverpool and after the "module workshop" 25/3/15 at Liverpool and ready to make dummy modules New jigs need to be slotted.
1 ACTIONS: Ashley French TASK STATUSCOMMENTS 1. Contact Berthet-SergeFuture 12/11/10 2. Contact Serge Mothot & Said Atieh (CERN Workshop) Future 12/11/10.
WP3 Meeting 21/05/ Liverpool Status: Thermo-Mechanical Hybrids Have now received a full complement of 240 Thermo-Mechanical Hybrids from Stevenage.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
SLHC Strip Tracker Module Envelopes (Tim) WP4 Meeting Glasgow, 13 th June 2011.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
1 WP3 Bi-Weekly Meeting Activities at Liverpool 1.Evaluation of Compact DCDC converter Designed to match up to an ABC130 module 2.Status of FIB’d hybrid/module.
Stave Module Status Tony Affolder The University of Liverpool On behalf of cast of thousands… ATLAS Upgrade Week November 10,
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
What is Preflighting? Preflighting 101. What is pre-flighting? Preflight Preflight To discover and identify predictable problems with your files and job.
12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 1 - Small vacuum pump holding hybrid flat on panel (which it is ‘strong enough’ to do) - Since picture.
Preparations for Irradiation of ABCN250-Hybrid (1) 10 th August 2015, Petal/Stave Meeting Following-up on Craig’s plans for irradiation at the B’ham cyclotron:
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
B508 and 275 Magdalena Kowalska. b275 2 AEGIS laser lab ASACUSA test setup g-BAR? Storage of big parts, test stands? Test setups SSP, detector labs Electronics.
Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.
Status of Glasgow module production Richard Bates The University of Glasgow K.Smith, R. Bates, A. Cheplakov, V. O’Shea W. Bell, J. Melone, F. Doherty,
Petalet-Stavelet; 13 July Birmingham Update Gluing to mechanical sensor with Epolite (as reported earlier). 1 st hybrid – too much glue on stencil.
Birmingham Update Module bonding (Sam and Simon) Great difficulty bonding on to patterned glass ASICs. (OK on sensor). After 1 st two rows of bonds, abandon.
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
Birmingham update: making modules? ASICS to hybrid Gluing: many trials i) heated plate with silver loaded (8 hybrids i.e. 1 panel per day) ii) UV cured.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
ATLAS UK Tracker Upgrade AIDA-2020 Transnational Access Facility
Update from Birmingham Phil Allport, Daniel Briglin, James Broughton, Andy Chisholm, Laura Gonella, Kostas Nikolopoulos, Simon Pyatt, Juergen Thomas, John.
Transferring the design to CAD – 2D Design Cutting out the design using CAM Folding using a strip heater….. ….. and jig Applying graphics to the final.
Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October Phil Allport, Matt Baca, Daniel Briglin, James.
Hybrid Activities for ABC Aim to freeze thermo-mechanical layout next week in readiness for submission Will make use of a resistive serpentine.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Gluing trials continuing: Loctite is favourite (for Dispensemaster) Bonding: exercising the machine; practising in laying down patterns (Simon and.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
WP3; 15 Jan 2015; John Wilson.1 Birmingham Update All back and operational after Christmas! Simon in contact with Dario Ariza at DESY re gluing (Boron.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
TM Module Measurements (1) 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October Phil Allport, Matt Baca, Daniel Briglin, James.
Andy Blue WP3 - Glasgow Update Andy Blue. WP3 Meeting Update Module Building –2 nd Module (FZ1) wire bonded last week –Tested on Mon –Re-works yesterday/today.
Berkeley status Aug 10th, 2012.
ATLAS pixel module assembly flow
→ need to guide UV light into gap; also beware temp effects
Glue curing studies (contd)
+ Steve Worm (since Monday)
Test Stand Status and Plans
ITK Strip Module Meeting; 12st October 2015
Database requirements from ITk-Strips for DAQ loads
Equipment for Assembly – UK Experiences
Next steps – with notes from during the meeting 17 March 2016
Next steps - with notes from during the meeting 24 March 2016
HIC Assembly - Liverpool
ATLAS ITK WP3 WP3 Bi-weekly meeting
Group meeting, 2nd Sept, 2013; JAW
Preparations for test of
Work packages status in Torino and perspectives
Update from Birmingham
UCSB Testing Status Anthony Affolder
Wirebonding UCSB FNAL Machines
Now Buy Best External Door Hardware from Doorhardware
Presentation transcript:

Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting, 9 th November Phil Allport, Matt Baca, Daniel Briglin, James Broughton, Andy Chisholm, Laura Gonella, Kostas Nikolopoulos, Simon Pyatt, Juergen Thomas, John Wilson Thermo-mechanical modules: All remaining edge wire-bonds now attached. Four TM now ready for shipment ! Metrology: Have performed quite some TM measurements with CMM, but many inconsistencies. In discussion with OGP ( for order of SmartScope CNC Multi-Sensor Measuring Machine with DRS Laser Package including DRS Laser Adapter and sensor (check specs with others before order). Currently looking at: CNC 500.

ABC130 Single-Chip Board: Test system setup 10 th August 2015, Petal/Stave Meeting Powered-up ABC130Driver (3.3V), adjusted ITSDAQ config, s/w version r3315 (Twiki: 'StripsUpgradeABC130Experience') Now powered-up ABC130 single-chip board too (fitted with mini-sensor). Some initial lifesigns, we're in contact with experts (Kyle, Matt, Peter) to understand setup properly. In preparation for new batch of single- chip boards. For irradiation of single-chip boards: Prepare long data cable (as in Toronto's SEU setup). Phil and new postgrad Daniel Briglin visiting RichardT at CERN today. Laura joining this program. DAQload: Juergen to visit RAL visit for pick-up next Wed to learn how to run them, wiring details etc. Strip Module Meeting, 9 th November

Preparations for Irradiation of ABCN250 hybrids at Birmingham 10 th August 2015, Petal/Stave Meeting B'ham workshop has cut one empty V4 panel (from L'pool) into one-hybrid slices using a 'waterjet cutter' machine Simon cleaning slices in preparation for wire-bonding. Removing one 'dead' hybrid (no data output, but holds power) from B1 panel to test wire-bonding (last ABCN250 hybrid bonded a very long time ago). When wired-up, do power-tests. Move into coldbox at cyclotron as a first real test (cool-down to -25C). Can we run without vacuum. 3D-printed frame to safely hold hybrid on aluminium plate inside irradiation coldbox. Thanks to Luise for sending 3D frame design files from petal module irradiation setup. → Modify for our hybrid size and print in-house. ABCN250 irradiation mostly to prepare for ABC130 single-chip irradiation (DAQ, powering etc). Strip Module Meeting, 9 th November