Utility Exceptions “Keys to Success”. 2 Utility Exceptions “Keys to Success” “Where compliance with a Policy, roadway design criteria or standard is impractical,

Slides:



Advertisements
Similar presentations
Metro Muncipal Agreement Program
Advertisements

Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
LPA Projects LPA projects Alum Creek Bike Trail $3,200,000 Parsons/Livingston $14,500,000 Riversouth Phase $9,900,000 Lane Avenue $1,700,000 Arcadia.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
TurnKey Project Management Services Capabilities Briefing.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Purpose Scope Debriefing is a concept of providing a “Feedback point” to the program manager of the project scope and those who were involved in preparing.
Agency Drafts Statement of Scope Governor Approves (2) No Agency Drafts: Special Report for rules impacting housing Fiscal Estimate.
Education Campus What a Difference a Year Makes! Takoma.
1 C E T A S Range of Alternatives Presentation Date Project Name Project location (city, county) ODOT Key Number:
Alternative Project Delivery
Single Point of Contact (SPOC) MTC Workshop PRESENTED BY: Sylvia Fung District 4 Local Assistance September 2014.
Greenfield District Utility/RR Engineer, INDOT
PIONEER HIGH SCHOOL WEST STADIUM PHASE 1. EXECUTIVE SUMMARY Erickson Hall (EHCC) was the awarded the Pioneer High School Phase 1 Construction Contract.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Platting Update Orange County BCC January 27, 2015.
Design Exceptions 101 Ed Fischer, State Traffic-Roadway Engineer Mike Morrow, FHWA Field Operations Engineer Kent R. Belleque, Senior Interchange Engineer.
WETLANDS and LOCAL PROGRAMS Environmental Services Oregon Department of Transportation.
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes.
I Larry Heil, FHWA October 15, 2003 Environmental Streamlining.
Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Water Supply Planning Initiative State Water Commission November 22, 2004.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING March 18-3:00PM | ROOM 1E-113.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
Utility & Rail Coordination in Project Development Jennifer McCleve Utilities & Rail Branch Manager.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Permit Process.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Understanding Right of Way Process Dawn Haecker, Training & Technical Support Supervisor, INDOT Trent Newport, VP, CrossRoad Engineers.
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING Jan. 21-3:00PM | ROOM 1E-113.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
“Connecting People and Places” REGIONAL MOBILITY PLAN CRTPA Board September 20, 2010.
The PDP and Decision-Making
Planning schemes Statutory documents under s.20(2) of LUPAA –outline policies and objectives –regulate or prohibit use or development of land –reserve.
Mass Highway Department (MHD) Design Process Anticipate possible use of MHD funds Anticipate possible use of MHD funds New Design Guide for Project Development.
April 2006 Middle Fork Project Relicensing Process April 25, 2006
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
STAGE #5: CLOSING 5 Process Stages of Project Management.
Local Agency Programs An Overview Gonzalo Puente, PE Shaun Bates, PE Development Engineer Project Manager.
Contractor Alternate Design Serving the Public’s Best Interest.
Project Development Process. ODOT’ PDP A project management and transportation decision-making tool. Developing the detail to the level necessary to make.
Commercial Project Reviews Information to assist with your project.
Presented to: 34 th Annual Airports Conference By: Ed Gabsewics, CEP Date: March 3, 2011 Federal Aviation Administration Planning and Environmental Guidance.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
Border Master Plan Laredo, Texas July 28, 2010  Laredo District  Coahuila  Nuevo León  Tamaulipas.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
1 1 The Project Description: Framing the CEQA Analysis Terry Rivasplata.
Dave Adamson Design Network launched 2 years ago Had many good ideas Discipline tracks Activity ownership Milestone meetings Promised “Not Static”
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
Engineering Major Projects: Raleigh Office Minor Projects: Division Office -This is a NCDOT policy, not a FHWA policy; it’s meant to avoid conflicts of.
Canyons Golf Hole 12 Comfort Station Special Exception
Consultation (C) After approval of the EIS, FONSI, or CE designation, the applicant shall consult with the Administration prior to requesting any major.
Delta Long-Term Management Strategy
How we got to where we are today.
Construction Considerations
Presentation transcript:

Utility Exceptions “Keys to Success”

2 Utility Exceptions “Keys to Success” “Where compliance with a Policy, roadway design criteria or standard is impractical, an “Exception” must be obtained”

3 Utility Exceptions “Keys to Success” “The Exception process is not solely to be applied to FDOT roadway projects. Any time a Utility can not comply with FDOT policy, criteria or standards contained within the UAM, an exception is required…”

4 Utility Exceptions “Keys to Success” Types Vertical ClearanceVertical Clearance Horizontal ClearanceHorizontal Clearance Limited Access R/W UseLimited Access R/W Use (L/A R/W, Rails, Trails, Bikeways) (L/A R/W, Rails, Trails, Bikeways) Control ZoneControl Zone Clear ZoneClear Zone MSE WallsMSE Walls

5 Utility Exceptions “Keys to Success” Coordination and Review Conceptual DevelopmentConceptual Development Preliminary Submittal (2 weeks)Preliminary Submittal (2 weeks) Final Submittal (2 weeks)Final Submittal (2 weeks) District Design Engineer Approval (2 weeks)District Design Engineer Approval (2 weeks) State Roadway Design Engineer ConcurrenceState Roadway Design Engineer Concurrence (2 weeks)

6 Utility Exceptions “Keys to Success” Concurrence and Approval Recommended by the UtilityRecommended by the Utility Approved by the District Design EngineerApproved by the District Design Engineer Concurrence from the State Roadway Design EngineerConcurrence from the State Roadway Design Engineer

7 Utility Exceptions “Keys to Success” Who Who When When What What

8 Utility Exceptions “Keys to Success” Who Who UAM; “It is the responsibility of the Utility to initiate a request for an exception …” D 5; In order to ensure that potential exceptions are handled in a timely manner, a cooperative effort between the FDOT PM, Consultant PM, EOR, Utility Liaison and UAO is essential

9 Utility Exceptions “Keys to Success” WhenWhen UAM; “ … it is critical that exceptions be identified as early in the process as practical.” D 5; The process of identifying potential utilityexceptions starts during scope development. For projects with a study phase exceptions are to be identified during the study.

10 Utility Exceptions “Keys to Success” What WhatUAM; –Description –Safety Impacts –Benefit/Cost Assessment –Conclusion and Recommendation

11 Utility Exceptions “Keys to Success” What What D 5; –Blanket Exceptions not permitted –Matrix/Table listing each pole –Layout/plan sheets with dimensions –Photos –Alternative analysis

12 Utility Exceptions “Keys to Success” Format Format –Form ( ) –Narrative and all supporting documentation –Header/footer on each page with pages numbered

13 Utility Exceptions “Keys to Success”

14 Utility Exceptions “Keys to Success” Comments ? Questions ?

15 Utility Exceptions “Keys to Success”