GLAST LAT ProjectMarch 24, 2003 5A Tracker Peer Review, WBS 4.1.4 1 GLAST Large Area Telescope: Tracker Subsystem WBS 4.1.4 5A: Parts and Materials Procurement.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
Advertisements

GLAST LAT ProjectPeer Review, March 24-25, D 1 Gamma-ray Large Area Space Telescope 7D: Tray test plans GLAST Large Area Telescope: GLAST Large Area.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 R.P. Johnson, UCSC 1 Silicon-Strip Tracker Converter Robert P. Johnson Santa.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
GLAST LAT ProjectMay 20, 2003 LAT Engineering Meeting Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Revisions to Tray Design.
Tracker Subsystem1 GLAST LAT Project FM16 PSR, Nov. 4, 2005 GLAST LAT Tracker Tower16 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
July GLAST Project Installation Review LATLAT 1 Tracker Tower Installation Review Peter Amnuaypayoat
GLAST LAT ProjectDOE/NASA Delta Baseline/Preliminary Design Review, July 30, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS.
1 GEOMETRY FOR TRACKER Eduardo do Couto e Silva - 2/11/00 (drawings are NOT to scale) 1 - List of Figures 2 - Top view of tray with 5 x 5 detectors 3 -
GLAST LAT Project – Cost and Schedule ReviewNovember 3, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review November 3, 2004.
GLAST LAT ProjectEngineering Meeting, December 3, GLAST Large Area Telescope: Engineering Meeting December 10, 2002 Lowell A. Klaisner Stanford.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 1 TMCM connector stay clear problem Alessandro Brez INFN - Pisa
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
GLAST LAT ProjectFeb. 17, 2004 Hartmut Sadrozinski: TKR Flex Cables 1 TKR Flex Cable Issues addressed TKR Flex Cable Issues addressed Mechanical 1.Grid.
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT Silicon Tracker Marcus ZieglerAPS April Meeting The GLAST Silicon Tracker Marcus Ziegler Santa Cruz Institute for Particle Physics University.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, BNick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Robert P. Johnson 1 GLAST Large Area Telescope: Silicon-Strip Tracker/Converter.
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS D: Composite Panel Fabrication.
Tracker Production Overview Readout Cables UCSC, SLAC (Parlex) SSD Procurement, Testing SLAC,Japan, Italy (HPK) Electronics Fabrication, burn-in, & Test.
GLAST LAT ProjectMonthly Review, November 3, 2004 Tracker SubsystemP. S. Drell 1 GLAST Large Area Telescope: Tracker Subsystem WBS Persis S. Drell.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: Mechanical Parts and Materials.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 2.2 Budgets & Metrics 1 GLAST Large Area Telescope:
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
GLAST LAT Project CAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
GLAST LAT ProjectQuarterly Review, November 12, 2002 LAT-PR GLAST Large Area Telescope: Tracker Subsystem Robert Johnson Santa Cruz Institute for.
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Introduction Robert Johnson.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectPMT Procurement Review May 24, 2002 AntiCoincidence Detector Design Overview 1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD)
Preproduction Status & Results
GLAST Large Area Telescope:
7E: Tower test plans GLAST Large Area Telescope: Tracker Subsystem
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: Tracker Subsystem WBS 4.1.4
Presentation transcript:

GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement Overview Thomas Borden Stanford Linear Accelerator Center Tracker Subsystem Engineer Gamma-ray Large Area Space Telescope

GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS Agenda Requirements Detailed Presentations Procurement Status

GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS Requirements Two levels of controlling documentation: –LAT Level LAT-DS LAT Mechanical Materials and Parts list LAT-SS LAT EEE Parts Identification List LAT-SS LAT EEE Parts Program Control Plan –Tracker Level LAT-SS Tracker Mechanical Parts and Materials list LAT-SS Tracker Electronics Parts list LAT-TD LAT Tracker Parts and Components Spares Plan

GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS Detailed Presentations Electronics Parts and MaterialsN. Virmani SSD ProcurementH. Sadrozinski ASIC ProcurementR. Johnson Mechanical Parts and MaterialsT. Borden

GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS Procurement Status PartSourceVendorOrder Date Del DateNeed QT 18 Towers Ordered Quantity Fab or Assembly Drawing SSD’sSLAC INFN Japan HPK10/1/01Ongoing10,36811,400LAT-DS-26 Bias CircuitsSLACTycho 648 LAT-DS-192 Thin ConvertersINFN LAT-DS-791 Thick ConvertersSLACSchwarzk opf 2/24/034/19/ LAT-DS Ply Face SheetsINFNPlyform5/1/03AR468LAT-DS-49, LAT-DS Ply Face SheetsINFNPlyform5/1/03AR144 LAT-DS-617, LAT-DS-618 Light CoreSLACPlascore1/31/032/27/ Light/Thin CoreSLACPlascore1/31/032/27/ Heavy CoreSLACPlascore1/31/032/27/ Heavy Core ThinSLACPlascore1/31/032/27/ Std CloseoutsSLACAllcomp to 2/28/ LAT-DS-92, LAT-DS-93 Top CloseoutsSLACAllcomp to 2/28/ LAT-DS-196, LAT-DS-197

GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS Procurement Status Bottom CloseoutsSLACAllcomp to 2/28/ LAT-DS-800, LAT-DS-801 Closeout InsertsINFNPlyform LAT-DS-94 3mm InsertsINFNPlyform 2736 LAT-DS-718 4M InsertsINFNPlyform 432 LAT-DS-592 TMCM ScrewsINFN 7128 TMCM screw cups SLAC 5000 TMCM connector mount screws SLACMorris 1/10/ Tall TMCM’sSLACYoung Electronic s 72 LAT-DS-368 Short TMCM’sSLACYoung Electronic s 576 LAT-DS-77 Tall TMCM’s- Assembled SLACTeledyne 6/30/0372 LAT-DS-899 Short TMCM’s- Assembled SLACTeledyne 6/30/03576 LAT-DS-898 Converter Adhesive INFNPlyform Plyform stock AR

GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS Procurement Status SSD AdhesiveINFNNusil Plyform stock AR SSD Encapsulation SLACNusil G&A stockAR TMCM AdhesiveINFNEC2216 INFN Stock AR TMCM Handling Box SLACAzimuth 8/1/ Side WallsINFNPlyform 7280 Side Walls ScrewsSLACTextron 4/30/0212,56415,000 FlexuresSLAC 8/810/8 Flexure Mount Screws SLAC 32 Thermal StrapSLAC AR Conductive Tape- corners SLAC3M 12/18/02AR Flex Cables (8 types) SLACParlex LAT-DS-584 LAT-DS-723 to LAT-DS-729

GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS Procurement Status ThermistorsSLAC 288 Flex cable SMT resistors SLAC 576 Burn-in cablesUCSCParlex 32 Burn-in holdersUCSC 16 Burn-in PWBUCSC 32 Burn-in twist-pairUCSC 32 Lifting FixtureSLAC 11 Vibration FixtureSLACHand Precision 18 Tray handling box INFN Tower Shipping Box - outer SLAC 1810 Environmental tracking devices SLAC 186 Tower Assembly Fixture INFN 11 Connector SaversSLACOmnetics3/17/035/16/

GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS Procurement Status Nano Connector Sockets SLACOmnetics3/17/035/16/ Nano Connector Plugs SLACOmnetics3/17/035/16/ Micro-D Connectors SLACCristek 144 Pitch Adapter Flex SLACTycho HV CapsSLACNovacap2/13/035/15/ TMCM SMT resistors SLACVarious TMCM SMT capsSLACVarious Poly SwitchesSLACRaechem GTFE ASIC (G3)SLACMOSIS /31/0315,55221,600LAT-DS-812 GTRC ASIC (V6)SLACMOSIS /31/ LAT-DS-814 Elec. GSE (full)SLAC 88