Assembly and Test of the Spectrometer (H.P. Apr. 16,1998) Status Module Assembly and Tests 1.) Status of completed hybrids and module 2.) Summary of the.

Slides:



Advertisements
Similar presentations
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
Advertisements

Marco Bregant Vertex05 - Nikko, November 2005 Dipartimento di Fisica Universit à di Trieste & Istituto Nazionale di Fisica Nucleare (INFN) - Trieste ALICE.
Test Setup for PHOBOS Hybrid/Module Testing at MIT Pradeep Sarin 31 July 98.
Specific requirements for analog electronics of a high counting rate TRD Vasile Catanescu NIHAM - Bucharest CBM 10th Collaboration Meeting Sept 25 – 28,
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
1 Hybrid & Module Testing Status Week of 6/6-6/10.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
Test Pulse Analysis Carl Goodrich 7/31/07. Test Pulse The Test Pulse was injected into channels 4 and 23 –We expect channels 3, 4, 5, and 22, 23, 24 to.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Ladder QA Status. Ladder QA Summary Ladder Remarks 1XXXXXXXXOOOOOXOO left : short (via-GND) right chip3 : cannot mask 2OOOOOOOOOOOOOOO.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
1 November 18, 2014 DOE SC-OPA Review of 12 GeV ENC vs. preamp load FSSR2 by FNAL Single chip on a PCB Load from capacitors SVT module testing.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
PHOBOS Silicon Sensors Production W.T. Lin Dept. of Physics, National Central University Chung-Li, Taiwan Introduction Design and Production of Si-Sensors.
Sergey Korjenevski KSU DØ Run2b Silicon meeting, Oct 10, Preliminary testing results of Elma and HPK sensors Sergey Korjenevski Kansas State University.
Quality Test of L1 sensors HPK 10 sensors –Tested all, 6 sent to Fermilab – Test structures, HPK 133 L00 CDF ELMA 9 sensors –Tested 6 of 9.
1 CPC2-CPR2 Assemblies Testing Status Tim Woolliscroft.
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
Preparation of Module Assembly and Stringtest Haridas, Heinz, Marge One possibility for an assembly and test line? Preparation of a full string test –aim.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
Status of Glasgow module production Richard Bates The University of Glasgow K.Smith, R. Bates, A. Cheplakov, V. O’Shea W. Bell, J. Melone, F. Doherty,
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 1/19 Outer Tracker Module Production at NIKHEF Produced 60 modules  Production Progress.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
L0 Module Testing and Analog Cable What we built so far: –No.3 First prototype with SVX4 (L1 hybrid) –No.4 with irradiated sensor –No.5 Installed on the.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
ALICE SSD 20 May Yalta G-J Nooren ALICE SSD status.
SCT WeekDecember 3, Block of Low Gain Analysis and Solutions A. Ciocio - LBNL.
The CMS Silicon Strip Tracker Carlo Civinini INFN-Firenze On behalf of the CMS Tracker Collaboration Sixth International "Hiroshima" Symposium on the Development.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
Layout and test of silicon pad detectors for the PHOBOS experiment at RHIC Heinz Pernegger for the Phobos collaboration Massachusetts Institute of Technology.
Module mounting possibilities (FDR and module task force proposals) & Module mounting status at Dortmund Daniel Dobos, University of Dortmund
GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005.
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
Beam abort in KEKB and Background measurement by SVD 8 Feb T. Tsuboyama (KEK)
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Success is when preparation meets opportunity
Radiation Laboratory Meeting
Tracker Outer Barrel Silicon
APV Lectures APV FE Basic Building Blocks How Our Testing Works
APV Lectures APV FE Basic Building Blocks How Our Testing Works
A. Kaminskiy, CMS Tracker week , Apr 2004
TEC Module Production Overview
BESIII EMC electronics
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
UCSB Qualification Module Grading
Sensor probing (Summary)
CORRELATION BETWEEN LEAKAGE CURRENT AND NOISE
Module Testing in Florence Carlo Civinini INFN-Florence
US Module Testing Progress Report
Production Status 39 modules produced
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
Presentation transcript:

Assembly and Test of the Spectrometer (H.P. Apr. 16,1998) Status Module Assembly and Tests 1.) Status of completed hybrids and module 2.) Summary of the modules we have now 3.) Next steps towards the installation 4.) Detailed systematic measurements tomorrow in Markus’s talk

Overview of Assembly and Test Test of - VA chips - flex cables - hybrids SMD/conn to hybrid Chip to hybrid Hybrid bonding Test of MS MS rework Sensor pool Module gluing Module bonding (fast) Module function test Module SOURCE test Module calibration SURVEY measurement Module rework backpl. contact Mounting on frames

Status of components Hybrids –all hybrids assembled (a total of 1400 chips on 80 hybrids) –all hybrids tested and mounted to modules –lost only 3 of 80 hybrids -> extreme high yield of =96% –our “component drawers” are empty now sensors: –all sensors for the first arm received (big congratulation to Willis & Gerrit) –all necessary sensors for the first arm are tested and mounted (few more T3’ for a spare module now at MIT) Modules: –baseline: We are done with the module assembly and testing!!!

Assembly Time Schedule

Status of components Hybrids –all hybrids assembled (a total of 1400 chips on 80 hybrids) –all hybrids tested and mounted to modules –lost only 3 of 80 hybrids -> extreme high yield of =96% –our “component drawers” are empty now sensors: –all sensors for the first arm received (big congratulation to Willis & Gerrit) –all necessary sensors for the first arm are tested and mounted (few more T3’ for a spare module now at MIT) Modules: –baseline: We are done with the module assembly and testing!!!

A summary of Module Tests Calibration test –verify basic functionality –determine the gain of the module –find dead or substandard channels Acceptance criteria = less than 5% dead channels –dead = gain less than 80% of normal gain –noisy = noise larger than 3 times average noise Test with 90Sr source: –verify sensor function –verify signal –measure signal/noise distribution Acceptance criteria = peak signal/noise > 10

Our Modules MOD2 (2 installed) Substandard ch. percentage/module peak S/N

Our Modules M7T2 (2 installed) Substandard ch. percentage/module peak S/N

Our Modules MOD1 (4 installed)

Our Modules MOD6 (4 installed) Substandard ch. percentage/module peak S/N

Our Modules M4T4 (4 installed) Substandard ch. percentage/module peak S/N

Our Modules M5T4 (3 installed) Substandard ch. percentage/module peak S/N

Our Modules M7T3 (4 installed) Substandard ch. percentage/module peak S/N

Our Modules M5T5 (14 installed) Substandard ch. percentage/module peak S/N

Our Modules M4T5 (6 installed) Substandard ch. percentage/module peak S/N

A summary: The module peak signal-to-noise All modules S/N better than 10 Average S/N = 16:1

A summary: The number of defect channels (mainly pinholes, hardly broken lines or bonding shorts) All modules S/N better than 5% Average number of substandard channels = 1% %

A summary: The mounted sensors Vfd Iactive Rpoly - operation voltage below 90V (except 2 spare Mod1) - polysilicon resistor between 1-10MOhm - active area leakage current below 8uA typically 4-5uA

Conclusion The module assembly and testing is FINISHED –The hybrids had an exceptional high yield –all modules significantly better than the specifications –Signal/Noise=16:1 –about 1% dead channels The next fun- part: –survey and covers (in May/June) –mounting on frames (in July/August) –installation (in September) What’s left to be said: A big thanks to the whole assembly group