Sept. 2, 2010 Technical Advisory Committee RTWG Report Mark Bruce.

Slides:



Advertisements
Similar presentations
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
Advertisements

ERCOT: A Work In Progress Board of Directors Austin, TX July 16, 2002.
ODOT’s New PI Manual Kevin E. Davis Environmental Supervisor Office of Environmental Services.
Nadine Drew Lynn Goldman Merrie Meyers Charles Webster.
How an idea becomes an IEC standard Gary Johnson Chairman IEC SC45A
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Challenges Faced in Developing Audit Plans and Programs 21 st March, 2013.
TAC July 2, 2003 Market Design Implementation Process Recommendation.
1 RTWG Report to TAC October 1, 2009 Henry Durrwachter.
Market Meeting Support Susan Munson ERCOT Retail Market Liaison Commercial Operations Subcommittee (COPS) June 10, 2008.
Retail Market Subcommittee Update to TAC Kathy Scott April 24,
Prepared by Opinion Dynamics Corporation May 2004.
Individual Education Plan Overview Presented By: Pamela Cameron Fall 2014.
RTWG Report to TAC August 5, 2010 Howard Daniels.
1 Going From Good to Great: Cooperation, Collaboration, and Continual Learning Mark A. Satorius, Director Office of Federal and State Materials and Environmental.
Atlanta Board of Education AdvancED/SACS “Required Actions” February 14, 2011.
MP Online Data Entry Project Update WMS / ROS September 2013 Troy Anderson / Scott Middleton.
MP Online Data Entry Project Update WMS / ROS August 2013 Troy Anderson.
August 7, Market Participant Survey Action Plan Dale Goodman Director, Market Services.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2006.
GAC-GNSO Consultation Group On GAC Early Engagement in GNSO PDP London Progress Report 22/06/2014.
TEXAS NODAL Board Review and Approval August 19, 2003.
Planning and Community Development Department Housing Element City Council February 03, 2014.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
Emerging Technologies Working Group Update to WMS March 05, Contents I.Update on NPRR 588 II.Solar Forecasting: Protocol Revisions Needed III.Solar.
TEXAS NODAL Board of Directors Austin, Texas July 15, 2003.
2.2 Acquisition Methodology. “Acquisition methodology” – the processes employed and the means used to solicit, request, or invite offers that will normally.
Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph.
A Strawman for Discussion by Dottie Stockstill & Greg Ramon Special ERCOT Board Meeting June 24, 2003.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
Prepared by Opinion Dynamics Corporation May 2004.
ERCOT Strategic Plan H.B. “Trip” Doggett President and Chief Executive Officer Technical Advisory Committee ERCOT Public December 3, 2013.
Cross Community Working Group (CCWG) Accountability Update 8 October 2015.
Emerging Technologies Working Group Update to WMS October 07, Contents I.Energy Storage, as discussed at ETWG II.Emerging Technology Tracking System,
TEXAS NODAL: THE BASICS Presentation to ERCOT Technical Advisory Committee Workgroup June 25, 2003.
Generation Adequacy Task Force Update to WMS November 18, 2009.
1 RMS TAC Update April 3, Test Plan Flight Dates It is the practice of RMS to approved the dates for future testing flights. This enables new.
Reconfiguring Nodal Stakeholder Participation Presentation to the ERCOT Technical Advisory Committee Texas Nodal Transition Planning Task Force February.
Reliability Planning Priorities for 2015 Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Environmental Assessment in British Columbia Forum of Federations Conference September 14, 2009.
Impact Analysis and Feasibility Study Review – NPRR164, NPRR169 and SCR752 Troy Anderson ERCOT Program Management Office January 15, 2009.
1 Business Integration Update to PRS Troy Anderson ERCOT Enterprise Project Portfolio Management May 19, 2011.
September 25 and October 23, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott October 28, 2014 TAC Update to RMS 1.
Technical Advisory Committee Presentation to the ERCOT Board of Directors March 21, 2007.
Long Term Move-In Move-Out Development Strategy August 19, 2002 DRAFT.
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
Handling Appeals of PRRs and other Contested Issues ERCOT Board Retreat February 21, 2007.
TEXAS NODAL Market Design Structure and Process August 19, 2003.
ROS July 10, 2008 Meeting WOTF Update on ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008) Mark Garrott WOTF Chair.
Key Functions & Responsibilities (from the old governance document) – Coordinates the program-level adaptive management system and assists the GITs in.
TASOR TF Report to TAC Nov. 6, Overview MCWG recommendation (possible vote) CIPWG recommendation RMS and COPS recommendation PRS and COPS voting.
RMS Update to TAC November 1, RMS Activity Summary RMGRR057, Competitive Metering Working Group Name Change (VOTE) Update on RMS Working Group and.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Market Credit Risk Standard Key components Cheryl Yager August 20, 2008.
October 2, 2008 TAC Texas Nodal Market Implementation: Program Update Ron Hinsley.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
Commercial Operations Subcommittee (COPS) 4/15/2015 Update to RMS 5/5/2015.
RMS Update to TAC June 7, RMS Activity Summary RMGRR052 File Naming Convention for Customer Billing Contact Information URGENT (Vote) RMS Procedures:
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
TEXAS NODAL (ERCOT REVISIONS)
CBP Biennial Strategy Review System
2011 Prioritization Update to Market Subcommittees
Commercial Operations Sub-Committee Update to TAC
Guideline Development
CBP Biennial Strategy Review System ~Meetings Detail~ DRAFT August 29, /6/2018 DRAFT.
CBP Biennial Strategy Review System
Presentation transcript:

Sept. 2, 2010 Technical Advisory Committee RTWG Report Mark Bruce

2 Overview Update on Texas Renewables Integration Plan (TRIP) development Discussion of modified TRIP scope –Transition from “renewable” to “emerging” technologies –Narrowed scope of recommendations –Key focus areas Preview draft goals and recommendations of the Emerging Technologies Integration Plan (ETIP) Next steps RTWG Report 09/02/10

3 Update Work on identifying and framing issues is nearly complete. –Written comments by: QMWG DWG OWG PDCWG –Oral comments by: ROS WMS Draft goals and recommendations are complete. Document is in the final editing stage. Final document should be ready for TAC consideration in Oct. RTWG Report 09/02/10 Calpine Centerpoint Luminant Oncor PSEG Texas STEC

4 Scope Scope is broadened from “renewable” to “emerging” technologies. Proposed name change from Texas Renewables Integration Plan to Emerging Technologies Integration Plan. Scope of the plan moves away from issue-specific solutions to process improvements. Leaves issue-specific solutions to the standing stakeholder process and traditional ERCOT activities. Five broad areas of focus: 1.Process 2.Awareness 3.Education 4.Preparedness 5.Communication RTWG Report 09/02/10

5 Preview: Goals Improve the stakeholder processes for identifying, organizing, deliberating, resolving, and tracking issues of importance regarding the integration of emerging technologies into the ERCOT system. Increase ERCOT and stakeholder awareness of emerging technologies which may impact ERCOT functions or ERCOT market functionality. Increase ERCOT and stakeholder education on those technical issues related to emerging technologies which are anticipated to have meaningful impact on ERCOT functions or ERCOT market functionality. RTWG Report 09/02/10 Process: Awareness: Education:

6 Preview: Goals (cont.) Ensure ERCOT is sufficiently prepared to resolve integration challenges associated with emerging technologies. Provide timely and effective communication to policy makers, decision makers, and stakeholders regarding the issues arising from the integration of emerging technologies and the progress and effectiveness of strategies to resolve such issues. RTWG Report 09/02/10 Preparedness: Communication:

7 Preview: Recommendations Repurpose the RTWG –Broad consensus in RTWG to expand focus from “renewable” to “emerging” technologies. –ERCOT impacts are similar: forecasting issues, energy/demand uncertainty, market entry issues, reliability issues, etc. –RTWG should transition into ETWG Place the new ETWG under WMS –Majority view of RTWG is that housing the working group directly under TAC hampers effective management of issues. Reporting to sub-TAC voting committee would improve ability to address key issues. –ET issues still expected to be addressed by multiple standing TAC subgroups and ERCOT-led efforts. –Minority view of RTWG is that moving the working group “down” the TAC structure de-emphasizes the issues and may reduce stakeholder participation or “bury” issues. RTWG Report 09/02/10

8 Preview: Recommendations (cont.) Improve the Emerging Technology issues tracking process –Develop issues submission and comment process which mirrors familiar Revision Request process –Designed to allow transparent vetting and tracking of issues which do not fit or are not ripe for Revision Request process –Considered to be a “pre-” Revision Request process –See attached draft ET Issue forms Provide ERCOT Staff support for certain ETWG activities –Market Rules Staff support for ET Issues document management is an important element of ensuring timeliness, accuracy, transparency, fairness. RTWG Report 09/02/10

9 Next Steps RTWG WebEx / conference call on Sept. 20 for final edits October 7 presentation to TAC RTWG Report 09/02/10