Transitional Exit Capacity Proposals -Update Offtake Agreement Workstream, 30 Nov 05 Dave Adlam.

Slides:



Advertisements
Similar presentations
Mod 0508 Revised Distributed Gas Charging Arrangements  Proposed change to take into account that flows from DN Entry points to DN Supply Points should.
Advertisements

NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
Congestion Management by distribution FEBEG POSITION Meeting FEBEG-VREG ( )
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Exit Reform Review Transmission Workstream 07 January 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
MIPI / RG140 Update Chris Shanley. Agenda  Review Group Background  MIPI Project - Background  RG140 Principles to be delivered via MIPI  Functionality.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
1 Review Group 166 Review of necessary reform of NTS Offtake Arrangements Exit reform from an interconnector perspective Avian Egan 20 th September 2007.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Long Term Entry Capacity & User Commitment Review Group th September 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Incremental Entry Capacity Release Methodology Statement Review 2005 Transmission Workstream - 15th June 2005.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
DNPC06 LDZ NEC Charges Denis Aitchison 25 th January 2010.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
LTSEC summer auction Transmission Workstream 6 th April 2006 Dave Adlam, National Grid NTS.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Operating Margins UNC Sub Group Tuesday 2nd December 2008.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Managing the Costs of New Developments Initial Proposals on Transmission System Operator Internal Costs from 1 st April 2007 Update from National Grid.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Proposal to adjust investment lead times Transmission Workstream 4 th May 2006.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
Transitional offtake arrangements – Ofgem Initial Proposals on transitional incentives 6 October 2005.
Transitional Exit Capacity Proposals -Update
Exit Capacity Release Methodology Statement
Modification Proposal 0283 Update
Transmission Workgroup 4th October 2012
Transmission Workstream 4th July 2007
Transmission Workstream, 6 August
Removal of a Users ability to allow Quarterly NTS Entry Capacity to lapse Chris Shanley.
UNC Modification Proposal 0373
Capacity Methodology Statements: Impact of Mod 452
Capacity Methodology Statements
PARCA Security and Termination Amounts
Exit Capacity Substitution and Revision
Update on Exit Capacity Substitution and Revision
Development of Entry Capacity Substitution
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
UNC Transmission Workstream 7th December 2006
Proposed Transitional Gas Exit Arrangements
Entry Overrun Calculation
Information Provision for Transitional Exit Capacity
Incremental Entry Capacity Release Methodology Statement
Presentation transcript:

Transitional Exit Capacity Proposals -Update Offtake Agreement Workstream, 30 Nov 05 Dave Adlam

Update on NG transitional proposals  UNC Mod 0046  With Ofgem for decision  IExCR, ARCA, SC4B  25 th AugustConsultation on IExCR, SC4B Statement and DN and DC ARCAs  22 nd SeptConsultation closes out  25 th NovFinal proposals issued on SC4B Re-consultation on IExCR  Early DecRe-consultation on DN and DC ARCA anticipated

IExCR  Requirement to amend the existing IExCR to accommodate the release of incremental exit capacity in the transitional period  Proposed key principles  Simple, transparent and non-discriminatory processes  Clear obligation as to when it is appropriate to release incremental exit capacity  Any costs reasonably incurred by NG in system investments to deliver incremental exit capacity are appropriately renumerated

IExCR re-consultation  In light of representations, consider that re- consultation on IExCR appropriate on the following areas:  Definition of incremental exit capacity  ARCA governance  ARCA commitment  ARCA dispute resolution

Definition of incremental exit capacity  Respondents considered there was uncertainty as to exactly what constituted incremental exit capacity  Ofgem have therefore proposed changes to Special Condition C18 of our licence to clarify the definition of ‘initial volume allocation’ (IVA) and ‘incremental exit capacity’  these proposed Licence amendments have been reflected in the revised proposed IExCR  IVAs for NTS/LDZ offtakes for transitional period to be included in IExCR with values consistent with Ofgem proposed incentive targets for each exit zone  2008/09 IVA values taken from the 1 May Offtake Capacity Statement  2009/10 IVA values derived by applying forecast growth rate to previous years IVA for each offtake

ARCA governance  Respondents expressed concern over lack of governance associated with ARCAs, and inability of Authority to approve form of ARCAs  As incremental exit capacity release linked to signature of ARCA, we have proposed set of high level principles on which NG will base any required ARCAs within IExCR  allows Authority to consider appropriateness of principles  provides improved transparency of the ARCA requirements

ARCA commitment  Ofgem have informed us that a financial commitment consistent with the Langage determination is not necessarily sufficient to ensure renumeration of investment costs  We will therefore need to offer ARCAs that would provide a financial underpinning of 100% of investment costs specific to a connection  Costs would exclude any reinforcement work that is likely to benefit other Users, either immediately or in the future  Commitment would be reduced in the future if unused reserved capacity is used by any other party

ARCA commitment  ARCA commitment becomes due in the event that the booked NTS Exit Capacity / NTS Offtake Capacity is lower than the level of reserved capacity in the ARCA and the revenue generated is less than the ARCA commitment  Amount due will be the difference between the booked level of capacity and the reserved level of capacity multiplied by the prevailing exit capacity rate

ARCA commitment - Example  Defining the period over which the commitment applies  Specific Reinforcement costs  £18m  Annual NTS Exit Capacity revenue (reserved incremental capacity x expected NTS exit charge rate)  £3m  Period over which the ARCA commitment would apply  £18m / £3m = 6 years

ARCA Commitment - Example GAS YEARS YY+1Y+2Y+3Y+4Y+5 User reserves 100 incremental capacity units from year Y Actual Incremental Capacity Booked User underbooks by 10 units Accrued liability 10 * Prevailing price User underbooks by 20 units Accrued liability 20 * prevailing price E.g. £18m financial commitment over 6 years Annual assessment to establish whether £3m generated

ARCA Commitment - Example If revenue generated < £18m then liability accrued in Y+5 would become due.

ARCA Dispute Resolution  In the event that the connectee or National Grid are unhappy with the terms and conditions of the ARCA offered by NG then it can be referred to the Authority for their determination under Gas Act

Way forward  IExCR re-consultation will close out on Friday 23 rd December 2005  Responses should be sent to: Dave Adlam NGT House Warwick Technology Park Gallows Hill Warwick CV34 6DA