14471 Vibration Test Apparatus: Systems Design Review Team Lead: Brett Billings Lead Engineer: Nicholas G Scribe: Ashley W EDGE: Claire Kobal Team Members:

Slides:



Advertisements
Similar presentations
AAT Injector Nozzle Test Chamber P15681 Calibration Fluid Exhaust System Zach Huston, Hayden Cummings, Adam Farnung, Tim Nichols, Robert Moshier, Andrew.
Advertisements

P11511 Project Review. Project Team, Faculty, and Customer Project Team: – Project Lead: Kevin Argabright (ME) – Team Members: John Fitch Dean (ME) Mike.
The Role of Software Engineering Brief overview of relationship of SE to managing DSD risks 1.
Development of Laser Fuser Test Bed Project Number: P07501 Justin McMillan.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter 2005 Engineering H193 Project Notebook & Brainstorming Sketches.
Compressor ReVamp and Fabrication PO9452. Update Revised Concept Generation Selected some concepts Scheduled Conference call with Dresser Rand Schedules.
Senior Design: Tachometer Calibration Device Team 4: Jennifer Egolf, Matthew Hagon, Michael Lee, Christopher Pawson Sponsor: DuPont Advisor: Dr. Glancey.
Fundamentals of Engineering for Honors - Team Project P. 1 Spring Quarter 2003 Engineering H193 Project Notebook & Brainstorming Sketches Week 1 Day 2.
Background Cooper Crouse-Hinds Industries is a leader in the manufacturing of luminaires, an encased lighting system, for hazardous locations. These luminaires.
1 P14471 Vibration Testing Apparatus II Final Review 5/13/2014 Brett Billings Jacob Gardner Nick Greco Ron “Sparky” Jimbo Claire Kobal Ryan Selig Ashley.
Dan Damon Kevin Hampton Christine Lee Shane Siwinski ADVISOR: Professer Lin SPONSER: General Motors.
Expansion Joint Active Monitoring. Team Members Joe Savino Mechanical Engineer Adam Remick Electrical Engineer Andrew Hintermeier Mechanical Engineer.
P /30/14 System Level Design Review Reciprocating Friction Tester Tuesday, September 30th, 2014.
 Rob Fish (Industrial Designer)  Zachary Kirsch (Mechanical Engineer, PM)  Martin Savage (Mechanical Engineer)  Olivia Scheibel (Mechanical Engineer)
Critical Design Review Wind Turbine with Gearbox
Effective Methods for Software and Systems Integration
Power System for the Better Water Maker P ● Background ○ Problem Statement and Project Plan ○ Customer Needs and Engineering Requirements ○ Constraints.
INFO 637Lecture #31 Software Engineering Process II Launching & Strategy INFO 637 Glenn Booker.
Nerf Football Launcher
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Concerned with activities involved in ensuring that software is delivered: on.
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
Transmission Oil Pump Audit Test Stand Project Overview.
Systems Level Design Review P15010: Arc Wheelchair Swing Maggie Bates, Sean Kennelly, Owen Breese, Elizabeth Cutolo.
Software Engineering Management Lecture 1 The Software Process.
Automatic Shift Controls for ATV Sponsored by: Joel Notaro Polaris Industries Advised by : Professor George Slack Project Family: Modular, Scalable, Open.
P14471 Vibration Testing Apparatus II Detailed Design Review 12/10/2013 Brett Billings Jacob Gardner Nick Greco Ron Jimbo Claire Kobal Ryan Selig Ashley.
P14471 Vibration Testing Application. Team Introductions NameRoleMajor Brett BillingsTeam LeaderIndustrial Engineer Nick GrecoLead EngineerMechanical.
KAITLIN PERANSKI: IE, PROJECT MANAGER JEREMY BERKE: EE, SCRIBE/LEAD SOFTWARE CHRIS CAPORALE: EE, LEAD HARDWARE SPENCER WASILEWSKI: ME, MODELING/MACHINIST.
Wegmans Bread Tray Lift Assist By Brendan Moran,Greg Feather Alex Phillips and Andrew Beasten.
Slide 1V&V 10/2002 Software Quality Assurance Dr. Linda H. Rosenberg Assistant Director For Information Sciences Goddard Space Flight Center, NASA
Heather Beam Thomas Bean Megan Chapman Steven Geiger Kimberly Keating.
Motor Assisted Wheelchair Design Review 09/10/15.
P16221 – FSAE Shock Dynamometer System Level Design Review September 29, 2015.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
Project Active Vibration Cancellation. The Team NameDisciplineRole Kaitlin PeranskiIndustrial and SystemsProject Leader/ Edge Updating Jeremy BerkeElectricalScribe.
P15741: Air Table Mover Photo: Newport.com. Team Members Cameron Young – Team Leader Daniel Miller – Lead Mechanical Engineer Nicholas LeBerth – Edge.
MSD Total Supplier Performance and Inventory Control Keleigh Bicknell, William Darlington, Alex Resnick, Brian Woodard.
Dog Grooming tool Team 17 Justin Proctor, Roy Mason, Jordan Chupp, Dennis Pugh Sponsor: Engineering To Go.
Project & Risk Management
Chapter 1: Fundamental of Testing Systems Testing & Evaluation (MNN1063)
GCS400 Lift & Tilt Dozer Control System
P16081: SYSTEMIC CIRCULATION MODEL Jacob Zaremski – Lead Engineer Mallory Lennon – Project Manager John Ray – Communications Manager Fabian Perez – Purchasing.
MSD P15280 RIT HOT WHEELZ TEST BENCH. AGENDA ❖ Review Problem Definition Material ❖ System Level Design Review ▪Functional Decomposition ▪Morphological.
MSD Total Supplier Performance and Inventory Control
P16680: AATech Universal Oil and Bag System Subsystem Design Review 10/20/15.
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
Luminaire Vibration Test Apparatus: P14471 Team MemberMajor Brett Billings, Team LeadIndustrial and Systems Engineering Nicholas Greco, Lead Mechanical.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
MSD II System Demonstration P15044 – Intelligent Mobility Cane4/16/2015.
P14471 Vibration Testing Apparatus II Subsystems Design Review 10/29/2013 Brett Billings Jacob Gardner Nick Greco Ron Jimbo Claire Kobal Ryan Selig Ashley.
Motor Assisted Wheelchair Design Review 10/01/15.
P14471 Vibration Testing Apparatus II Integration Demo 4/15/2014 Brett Billings Jacob Gardner Nick Greco Ron Jimbo Claire Kobal Ryan Selig Ashley Waldron.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Lab Day – Controller Lab 1 Brief Follow-up from Wednesday Grading.
P14471 Vibration Testing Application. Team Introductions NameRoleMajor Brett BillingsTeam LeaderIndustrial Engineer Nick GrecoLead EngineerMechanical.
Wegmans Swirl Cake Process Improvement Multidisciplinary Senior Design RIT Fall / Winter
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
R16601: Glass Fab Wire Saw Integration/Roadmap. “Glass Fab, Inc. is currently looking to replace their wire glass cutting saw with a smaller, more efficient.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Engineering H193 Project Notebook & Brainstorming Sketches Week.
Turbomachinery Flow Visualization P08453
Baja Hybrid Drivetrain Design P14224
Baja Hybrid Drivetrain Design P14224
Systems Level Design Review P15010: Arc Wheelchair Swing
Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio
P15661 Reciprocating Friction Tester Base Subsystem
P17452 Dresser-Rand System Health Monitor System Level Design Review
Systems Level Design Review P15010: Arc Wheelchair Swing
P15611: Digital Microfluidics Packaging
MSD I Review February 22, 2008 (9:00 AM) Room
Presentation transcript:

14471 Vibration Test Apparatus: Systems Design Review Team Lead: Brett Billings Lead Engineer: Nicholas G Scribe: Ashley W EDGE: Claire Kobal Team Members: Jacob Ryan Ronald

Problem Statement

Engineering Requirements: The Design Drivers

Benchmarking

Functional Decomposition

Risk Assessment IDRiskEffectCauseSevereLikelyScoreAction Items 1 Displacement is not equal to 1/32" Apparatus doesn't meet UL844Mechanical Failure326Make it adjustable 2 Vibration is not 2000 cycles per min apparatus doesn't meet UL844crankshaft slipping326Evaluate previous teams design 7Pinch points existOperator injury could occur Existance of pinch points 236 Design guarding, enclosure, and/or warning labels 14 Project deadline is not met Customer is dissatisfied, students receive poor course grade, RIT's reputation is negatively impacted Correction of mistakes326 Participatein milestone design reviews 2 Vibration is not 200 cycles per min Apparatus doesn't meet UL844Speed reducer slipping224Splash guard / maintenance 8 Apparatus is not ergonomically safe to set up Operator injury could occur Set up requires awkward positioning 224 Evaluate setup with ergonomic lifting equations 9 Can't mount all configuration types Customer is not going to be able to test some configurations Project scope224Use current fixtures 12Over budget Customer is dissatisfied, engineering requirements must be sacrificed Unforeseeable expenses 224 Proper budgeting/compare prices/buy standard sizes 14 Project deadline is not met Customer is dissatisfied, students receive poor course grade, RIT's reputation is negatively impacted Materials are delivered late 224Order before Winter break Delay in Tool Shop224 Schedule machine time 1 week in advance with Tool Shop

Morph Chart Overview

Alternatives Considered: Pugh Chart individual components Need individual pugh charts for – Vibration displacement – Vibration frequency – Connect to motor – Time – Display Feedback – Connect to machine

Morph Chart (Datum)

Morph Chart (Option 2) Morph Chart

Morph Chart (Option 3) Morph Chart

Pugh Chart Overall Systems

Selected Concept NEED SKETCH OF THIS!

Architecture Central System Power supplyMotor system Sensors Display/user interface Luminaire connection Crankshaft connection Safety features

Risk Assessment of Selected Concept

Display & Control System Cycles per minute directly proportional to RPM Three core components required for control: – RPM Sensor – RPM Adjustor – RPM Display Laser tachometer used as a sensor Variable-Frequency Drive (VFD) to adjust speed Digital display for reading back speed

Engineering Analysis: Motor

Engineering Analysis: Frame Analysis

Engineering Analysis: Control Systems

Engineering Analysis: Costs

Engineering Analysis: Sound

Test Plan (First Revision) Test Displacement – Validate the 1/32” total displacement Test Vibration Cycles – Validate 2000 cycles/min Test life – Accelerated life test on belt and motor Test fittings – Do they fit the frame? MORE??????

Schedule for Next Phase

Questions?

Appendix /Reference Information Space for reference info for potential questions If not used please remove this slide