Understanding Earned Value Management & Analysis Abba Consulting Federal Acquisition Conference & Exposition Washington, DC June 19-20, 2007 Wayne Abba.

Slides:



Advertisements
Similar presentations
Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
Advertisements

Project Management 6e..
1 NDIA Earned Value Management Application Guide Status Report May 3, 2005.
ANSI/EIA A EIA STANDARD Earned Value Management Systems Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed.
Blues Chapter CSEP 1 Earned Value Management System (EVMS) Ron Fradenburg Blues Chapter President 19 March 2013 For more information visit:
Contract Types. Forms of Contracts Completion – A product is delivered –Cost or Fixed Price –Product must be delivered –Contract completed on delivery.
2 Patricia Olsen Vice President, Contracts, Pricing & Estimating The Boeing Company – Integrated Defense Systems August 4, :00 PM Incentive Fee.
23 Flexible Budgets and Performance Analysis Principles of Accounting
Chapter 7: Project Cost Management
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
Monitoring and Control Earned Value Management (EVM)
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Chapter 10: Monitoring and Controlling Change
Time and Cost Estimation
Chapter 41 Chapter 13 ٠ Contract Types ٠ Supplier Management.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Project Cost Management J.-S. Chou, P.E., Ph.D.. 2 Learning Objectives  Explain basic project cost management principles, concepts, and terms.  Discuss.
Project Cost Management J.-S. Chou, P.E., Ph.D.. 2 Learning Objectives  Explain basic project cost management principles, concepts, and terms.  Discuss.
Earned Value Management
Earned Value Management Guidelines Tony Finefield Finefield Consulting CPM Webinar 5 September
Cost Management Week 6-7 Learning Objectives
“Reading the Abba Charts” Wayne Abba PMI WDC Tool Time, July 18, 2006
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
Project ManagementDay 3 in the am Project Management (PM) CHECK.
Chapter 4: Schedule, cost, and situation analysis (pt. 2) ISE 443 / ETM 543 Fall 2013.
1 Cost Benefit EVM at DOT Presented to: Joint Industry – Government NDIA PMSC session Presented by: H. Giovanni Carnaroli Associate CIO, IT Policy Oversight.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
© MCR, LLC MCR Proprietary - Distribution Limited Earned Value Management Application, Guidance, and Education Neil F. Albert President/CEO MCR, LLC
Department of the Interior CPIC Forum Department of the Interior CPIC Forum Better Control of Cost and Schedule Variance through Earned Value Management.
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 4 – Computing Factory Overhead Variances.
Management & Development of Complex Projects Course Code - 706
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
EARNED VALUE MANAGEMENT (EVM)
EVM Home Page = = “One Book” DAU POC: (703) (DSN 655) Address: Revised.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
1 Alternative EVM Applications Not a One-Size-Fits-All.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
Project Cost Management
1 NDIA Earned Value Management Application Guide Status Report August 16-17, 2005 Wayne Abba Walt Berkey David Muzio David Treacy NDIA EVM Application.
Mohawk Vehicle - MEGA HERZ ELEC & VEN - MOH-2 F C-0050 J:\CS40\Data Analysis\- Standard Analysis Package/Sample Standard Analysis Package.
APPLICATION GUIDE January 27, 2006 Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed Martin Telephone ;
©2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publically accessible website, in whole or in part.
Understanding & controlling the project Production Process.
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Strength through Industry & Technology How is the Government Managing for Value? Program Management Systems Committee March 11, 2007 The Voice of the Industrial.
Presented by Niyi Ladipo September 14,  Results of the Survey  What is Earned Value Management (EVM)?  EVM vs. Traditional Cost Management 
EARNED VALUE MANAGEMENT & ORACLE PRIMAVERA P6 TREY MILLER, MBA, PMP ORACLE PRIMAVERA P6 EPPM CERTIFIED IMPLEMENTATION SPECIALIST GLOBAL PROJECT MANAGEMENT,
1 The Voice of the Industrial Base 1 IBR Guide NDIA PMSC Working Group NDIA PMSC Meeting April 24, 2007 Prepared by; NDIA IBR Working Group April 15, 2007.
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
Phone ACN Feb PAYMENT BY EARNED VALUE Presented by Stuart Wilson.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
EVM Home Page = Address: DAU POC: (703) (DSN 655) Revised December 2006 TERMINOLOGY.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
What Is It ? Why Do I Need It ? How Do I Do It? Earned Value Analysis.
Successfully Managing Customer Expectations Change is expected to occur during the life of any project, but this change must be controlled and managed.
October 11, EARNED VALUE AND PERFORMANCE MANAGEMENT.
Project Management 1 Project Control. Project Management 2 Topics Project Control Status Reporting Earned Value Analysis.
Chapter 7: Project Cost Management
7.3 Determine Budget The process of aggregating the estimated costs of individual activities or work packages in order to establish an authorised cost.
An introduction to Earned Value Management Simplex project management Education|Training|Mentoring|Coaching|Consulting.
September 2016 EVM 202—Lesson 4 Integrated Baseline Review Process (Part 4: Baseline Maintenance)
September 2016 EVM 202—Lesson 8 Integrated Product Team (IPT) Analysis and Performance Case.
Progress and Performance Measurement and Evaluation
Earned Value Management
A Stitch in Time Saves Nine
Chapter 7: Project Cost Management
Presentation transcript:

Understanding Earned Value Management & Analysis Abba Consulting Federal Acquisition Conference & Exposition Washington, DC June 19-20, 2007 Wayne Abba (703)

2 Understanding Earned Value Management EVM = Resource Management Resources are labor, material and other direct and indirect costs required to execute the program FAA applies EVM at Program level to include prime and sub contractors, government FTEs and support contractors Managed in dollars, hours, or any measurable unit Government accounting systems may not support EVM-based program/project management

Ensuring Planned Resources are Adequate Using an Integrated Baseline Review (IBR) JFMA Time Resources MJJ A Program Budget Front Loaded End Loaded Normal Program/Contract IBR is critical planning process

4 EVM and Baseline Discipline Effective performance management requires disciplined baseline management Initial baseline reflects go-ahead decision Scope, schedule, resources, risk Approve program/contract baseline changes to Revise work scope (increase or decrease) Restore meaningful performance management Manage funding reductions (“salami slices” or prioritized cuts?) Balance scope, schedule, cost, risk assumptions Do not approve baseline changes to “Get to Green” Eliminate cost and schedule variances

5 Understanding Earned Value Analysis Earned Value Analysis = Understanding the relationships among the EVM data elements EVM discipline provides confidence that: Contractor and PM management systems are adequate to provide effective monitoring and control Data are summarized from the Control Account level, where technical/schedule/cost integration occurs When data are used for management and oversight Data quality becomes “self-policing” Allows Management to ask questions and be informed, critical consumers EVM data should inform decisions – but cannot make decisions

6 Cost Variance Approx. Time Variance J F MA Time Resources Time Now ACWP (Actual Cost) BCWS (Planned Value) BCWP (Earned Value) Cumulative Trend Analysis M JJA Schedule Slip Schedule Variance Risk Management Reserve At Complete Variance Prog Budget ▲ Standard graphics for all programs

7 Cost/Schedule Variance Trend Analysis Time Cost Variance at Completion Schedule Variance at Completion 0 Cost Variance --- Schedule Variance Management Reserve Unfavorable Favorable Management Reserve Consumption Schedule Slip

8 Evaluating Future Performance Time 0 Cost Variance Management Reserve Unfavorable Favorable PM Variance at Completion When/how will performance improve? Review at appropriate time Tie PM evaluation to predictability Time Now

9 D M JS Time Resources Time Now EVA and Funds Management D MJS Prog Budget Approved/Planned Funding BCWP (Earned Value) BCWS (Planned Value) ACWP (Actual Cost)

10 EVA and Profitability Analysis on Flexibly Priced Contracts Time 0 Cost Variance --- Schedule Variance Management Reserve Unfavorable Favorable Min/Max Fee Contractor Loss Time Now Cost Sharing Cost Variance levels cf:

11 EVA and Profitability Analysis on Flexibly Priced Contracts Time 0 Cost Variance --- Schedule Variance Management Reserve Unfavorable Favorable Min/Max Fee Contractor Loss Time Now Cost Variance levels cf: Cost Sharing

12 EVM/A and Effective Contracting Program and Contract WBS Essential to get it right – this is Job #1 Contract type “Do I have to do EVM on FFP?” is the wrong question Evaluate risk and complexity – EVM is scalable Purpose of EVM/A Excellent management Objective, timely reporting – “Early Warning” to inform decisions  Linking incentives to reported Cost/Schedule Performance Indices (CPI/SPI) can cause undesirable behavior  If used – link to observable outcomes such as Preliminary/ Critical Design Review and Contract completion

13 Summary Understand EVM/A and Resource Management From a single database, use EVM to Manage the program Measure program performance Take appropriate management actions Report to senior management and to customers Fix the problem, not the blame Encourage timely problem identification and objective reporting Incentivize desirable behavior, not undesirable behavior Don’t necessarily equate program and PM performance Develop organizational history and “IQ” Resources FAA – Bob Rovinsky/Keith Kratzert Project Management Institute’s College of Performance Management – EVM Community of Interest (CoEye) National Defense Industrial Association’s Program Management Systems Committee