Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.

Slides:



Advertisements
Similar presentations
TOTAL QUALITY MANAGEMENT (TQM) Increasing Productivity.
Advertisements

CP Chapter 4 Schedule Planning.
Management Information Systems [MOIS470]
Chapter 7 Schedule Control
Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 1 Reasons to Reduce Project Durations: 1.To realize incentive pay 2.To fit.
 Chapter 6: Activity Planning – Part 1 NET481: Project Management Afnan Albahli.
SW Project Management Project Schedule and Budget
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
1 TenStep Project Management Process ™ PM00.3 PM00.3 Project Management Preparation for Success * Manage the Workplan *
University of Sunderland ENGM91 Unit 6 ENGM91 Project Execution Unit 6.
PROJECT TIME CONTROL. PROJECT SCHEDULING REFERENCES PRIMARY REFERENCE IN THIS PRESENTATION IS Operations Management, Ed 6, Heizer & Render, Prentice Hall,
Project Management. Maintenance and Reliability 14 Aug 2001.
Construction Operations Ch 15. Opening a Project Before Contractor is allowed on site it must –Make sure contractor has all required insurance –Obtain.
Chapter 22 Cost Control Using Standard Costing and Variance Analysis
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
Projmgmt-1/23 DePaul University Tracking the Progress of Your Project In MicroSoft Project Instructor: David A. Lash.
Time-Cost Trade-Off (Time Reduction = Time Compression = Time Shortening) 4/17/ :55 AM.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Conceptual Cost Estimating
Process Engineer’s Role in Project Management Dr Abdullah Malik.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Concerned with activities involved in ensuring that software is delivered: on.
Project Management Tools A Loose Guideline on how to use shovels and rakes at AIAA A presentation for New Hires October 6, 1999.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Chapter 4 INFORMATION SYSTEM PROJECT MANAGEMENT PREPARED BY : DIYANA BINTI KAMARRUDIN FARAH IZZATI BINTI MOHAMMAD NOR RAIHAN BINTI MD JOHARI.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Module 7 Session 7.2 Visual 1 Module 7 Planning and Scheduling with the Critical Path Method Session 7.2 Scheduling and allocating resources with CPM.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
School Finances for Finance Subcommittees School Councils.
1 Chapter 5 Project management. 2 Project management : Is Organizing, planning and scheduling software projects.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
King Fahd University of Petroleum & Minerals
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
Project Life Cycle.
Time-Cost Trade-Off (Time Reduction = Time Compression) (Time Shortening) Time-Cost Trade-Off (Time Reduction = Time Compression) (Time Shortening)
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
Reports. Report Summary Warehouse Reports Returned Material Serial Numbers Not Found This report list the serial numbers of material returned which were.
Agency Construction Management :CM NOT AT-RISK
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Project Monitoring Section A 1.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
Day 3 in the pmProject Management Project Management (PM) ADJUST.
 Delay in project implementation invariably results in cost- overrun.  Delayed project implementation means delay in getting return on investments made.
Midterm Exam Review On exam format and rules On theory and concept questions On Computational problems On chapter 8 On chapter 9 On chapter 13 2–1.
Copyright © by Houghton Miffin Company. All rights reserved.1 Financial & Managerial Accounting 2002e Belverd E. Needles, Jr. Marian Powers Susan Crosson.
Chapter 7 Schedule Control. 22 Learning Objectives  Perform the steps in the project control process  Determine the effects of actual schedule performance.
CLAIMS MANAGEMENT. PRESENTATION OUTLINE INTRODUCTION TYPICAL CLAIMS AGAINST OWNER TYPICAL CLAIMS AGAINST CONTRACTOR CRITICAL PATH METHODS UTILIZATION.
Project Management Processes for a Project
Microsoft Project 2010 ® Tutorial 1: Planning a Project.
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
 TATA CONSULTANCY SERVICES MM - INVOICE VERIFICATION.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
CHAPTER 2 SYSTEM PLANNING DFC4013 System Analysis & Design.
Project Cost Management
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
TOPIC-8B- PROJECT COST CONTROL
Project Management MGT 30725
Systems Analysis and Design in a Changing World, 4th Edition
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Project Planning and Scheduling
An-Najah National University
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Project Theory and Application
Reviewing your final digital product
Engineering Project Project Management Project Management.
Use of External Consultants
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Presentation transcript:

Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out

Introduction The purpose of the project control process is to guarantee that design requirements, budget and schedule are met by project team. Project control begins with a plan composed of design documents, an estimate, and schedule The plan involves checkpoints throughout the project cycle. As the project advances, the actual work is compared to the original plan. Actions maybe taken based on this comparison. The expected cost and duration to complete the work must be continually updated and reported. Why?

Project Control Objectives Check progress against acceptable standards at key dates –standards of quality are defined by the specs. –Standards of quantity are defined by the drawings – standards of budget are defined by the estimate. –Standards of time are defined by the schedule. Measurements of actual performance on the project –actual performance is monitored, documented, and compared to the planned performance. –A project control report is then produced. The report is based on data from time sheets, daily reports, purchase orders, etc.

–Based on this comparison, an evaluation of the performance can be done and actions can be suggested to meet the goals of the project. –Data in the report are then analyzed, variances are examined, and actions may be taken. –Example of a site clearing report: BudgetActualVariance Quantity(acres) 5 acres 5 acres - Equipment (hrs) 40 hrs 48 hrs 8 Labor (hrs) 40 hrs 48 hrs 8 Why variance? Weather, site conditions, approach, estimate, or worker performance? What should we do for the next similar activity?

Project Control Cycle Examine Figure 11-3

cost schedule engineers coordinate the data from the field and compare the performance with the original plan. They also prepare recommend adjustments to the plan based on the field data. data are then stored as historical records for future use. In the mean time, status reports are delivered to the managers to decide the best course of action. The project management may seek outside support, such as consultants. Final instructions are given to field personnel. Control cycle is repeated as often as necessary.

Optimum Project Duration Node notation used in the book: float of i-j = LET j - (EET i + duration i-j ) ij LETEETLETEET Activity duration float

It might be more economic to pay the extra cost to finish the project earlier if other returns are higher. Finishing the project earlier saves indirect expenses and may result in a bonus. The extra cost comes from the increase in direct costs of material, labor, and equipment because of working extra hours

Crash –the process of accelerating an activity or multiple activities to shorten the overall duration of the project. –crashing is effective when activities on the critical path are crashed. –As the project finish earlier, the direct cost increases and the indirect costs decreases. –crashing is a good idea when the total costs are reduced as the project is shortened. In other words, when savings in the indirect costs are more than the extra cost of the direct costs.

The relationship between the direct, the indirect, and the total cost can be displayed graphically. Figure 12-3 is the relationship between the cost (Y) and finish time (X) In that curve, point A is the normal finish time. As the project finish earlier, the direct cost increases and the indirect costs decreases. This is true down to day 30. The direct cost will be more than the indirect cost if the project finishes in day 29. The optimal duration is day 30, which is the lowest point in the total cost curve.

Example