Frankfurt (Germany), 6-9 June 2011 Minimum short circuit power in the LV distribution network to meet EN 50160 standard requirements David MEZERA

Slides:



Advertisements
Similar presentations
Frankfurt (Germany), 6-9 June 2011 Paper-ID: 0273 Power quality aspects of rural grids with high penetration of microgeneration, mainly PV installations.
Advertisements

Wind Farm Structures Impact on Harmonic Emission and Grid Interaction Harmonics in Large Offshore Wind Farms Łukasz Kocewiak (DONG Energy) Jesper Hjerrild.
Frankfurt (Germany), 6-9 June 2011  Panellists: Olivier Huet, EDF R&D, France André Postma, Enexis, Netherlands Dominique Serve, Schneider Electric, France.
Trend of Distribution Network in Shanghai SMEPC 6-9 June 2011 May 23.
ADVANCED MANAGEMENT OF A CLOSED RING OPERATED MV NETWORK: ENEL DISTRIBUZIONE’S P4 PROJECT. Simone Botton, Roberto Calone, Luigi D’Orazio, Alessandro Fatica,
Frankfurt am Main (Germany), June 6-9, 2011 Design and Implementation of an Innovative Telecontrol System in the Vattenfall Medium- Voltage Distribution.
 UK Power Networks. All rights reserved Distribution Network Visibility Low Carbon Networks Fund Tier 1 project UK Power Networks & PPA Energy Omer.
Frankfurt (Germany), 6-9 June 2011  In France, LV customers are mostly < 18 kVA and single-phase.  Some LV networks are unbalanced and it generates important.
Network Management on the Isles of Scilly Ben Godfrey Western Power Distribution Innovation and Low Carbon Networks Engineer /
Frankfurt (Germany), 6-9 June 2011 EN voltage dips and swells classification as an instrument for responsibility sharing Maurizio Delfanti Department.
Definition Reliability is a general quality of an object – an ability to perform a desired function, sustaining the values of rated operational indicators.
THE VERIFICATION OF SHUNTING METHOD FOR LIMITATION OF EARTH FAULT CURRENT IN MV COMPENSATED NETWORKS Petr TOMAN Jaroslava ORSÁGOVÁ David TOPOLÁNEK Vladimír.
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
F. Ferrandis_SP_ALPHA 2_BLOCK 2_Paper 35_Presentation Barcelona May POWER FACTOR CORRECTION WITHIN INDUSTRIAL SITES EXPERIENCES REGARDING.
Frankfurt (Germany), 6-9 June 2011 Economic assessment of PQ solutions Helge SELJESETH – Norway – RT 2b – Economic assessment of PQ solutions.
BPL Regulations for Access Networks  CURRENT’s Experience.
ON DIMENSIONING LVDC NETWORK CAPACITANCIES AND IMPACT ON POWER LOSSES
Turkish Power System Overview March 2012
ABB Switzerland Ltd. Christoph Haederli
Frankfurt (Germany), 6-9 June 2011 M.Sc. Terje Pynten, Dr. Jan Andor Foosnæs, M.Sc. Johan G Hernes, M.Sc. Erling Tønne NTE Nett AS Paper 0696 Finding maintenance.
Presenter: Peter Busch
Frankfurt (Germany), 6-9 June 2011 ROSA – PT – S3 – 0249 EDP DISTRIBUTION AUTOMATION (r)EVOLUTION.
Exposure of the French population to 50 Hz magnetic field: general results and impact of electric networks Isabelle Magne 1, Martine Souques 1, Mfoihaya.
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
Frankfurt (Germany), 6-9 June 2011 Hans-Erik Olovsson – Sweden – Session 1 Network Components – Paper 0453 Innovative Compact 145/12 kV Indoor Air Insulated.
Costs of PQ Networks José María Romero Gordon Frankfurt (Germany), 6-9 June 2011.
Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper PROBABILISTIC PLANNING FOR A HIGHER INTEGRATION OF WIND TURBINES.
CIRED 2011RT 5b TSO-DSO co-ordination of planning for wind connections Tony Hearne Manager, Renewable Planning ESB Networks.
Frankfurt (Germany), 6-9 June 2011  Authors: Reinhard BREHMERWIEN ENERGIE Stromnetz GmbH - Austria Thomas SCHUSTERWIEN ENERGIE Stromnetz GmbH – Austria.
Frankfurt (Germany), 6-9 June 2011 Fabio Cazzato, Simone Botton, Marco Di Clerico – Enel Distribuzione SpA Simone Botton – Italy – Session 4 – Paper ID.
Frankfurt (Germany), 6-9 June 2011 Analysis of Protection Malfunctioning in Meshed Distribution Grids Evita PARABIRSING Dr. Edward COSTER Dr. Marjan POPOV.
A low - cost high performance MV RMU with circuit breakers for use in remote controlled MV / LV substations Fabio GIAMMANCO Luca GIANSANTE 1 1.
Author name Country ID Session X – Block Y – Question Z Barcelona May Geographic information system (GIS) and their role in power utility.
Frankfurt (Germany), 6-9 June 2011  In the future, traditional fuse based over- current protection of LV networks will not be applicable for LV microgrids.
Substation Inspection Program. Mission Substation Incident The event occurred on December 20, 2003 during the peak Christmas shopping season A fire occurred.
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
On-line Condition Monitoring of Distribution Network Assets – Making the Network Smarter Neil Davies Neil Davies – UK – Session 1: Network Components –
Frankfurt (Germany), 6-9 June 2011 Mark Davies Trevor Charlton Denis Baudin Mark Davies – UK – Session 2 – Paper 0376 New Design Methods to Achieve Greater.
Frankfurt (Germany), 6-9 June 2011 Round Table 2a Voltage Quality Monitoring, Dip Classification and Responsibility Sharing Kevin Niall, ESB Networks on.
Advanced Sensors for the Smartgrid
Frankfurt (Germany), 6-9 June 2011 Improving the data quality of the LV-connectivity Intro Problem statement  What  Why Proposed solution Case Conclusion.
ZAVODA CA ALPHA2 Block 4 – Question 7, 8, 13 Barcelona May Question 7 (7.1) Instrument X V = 1 p.u. Instrument YV = 1.043p.u. Error = 4.3%
Frankfurt (Germany), 6-9 June 2011 Irina Melnik – the Netherlands – Session S2 – 0665 Intelligent Distribution Substation improves power quality.
Frankfurt (Germany), 6-9 June 2011 John MILLAR – Finland – RT.1a/5a Distribution Network Planning and Underground Cables Keeping overview while attending.
S. MELQUIOND France Session 1 – Block 1 – Question 1- 5 Barcelona May Question 1-5 Is the transformer protection by mean of protection switch.
Frankfurt (Germany), 6-9 June 2011 HOW THE CUSTOMERS PERCEIVE THE PROBLEM OF VOLTAGE QUALITY Martin KAŠPÍREK David MEZERA
A PRESENTATION On 400KV GSS SURPURA JODHPUR
Prepared by: Basem Al Mestadi ID#  What is flow Chart  Real work Example  Flow Chart  Conclusion.
Connecting Low Carbon Generation Clive Goodman Primary System Design Engineer.
Per-Unit System.
FUNDAMENTAL OF ELECTRICAL POWER SYSTEMS (EE 270)
SMJE 2103 Electrical Power System
SMJE 2103 Electrical Power System 3- Ph Power Apparatus.
URBAN DESIGN Non-standard (Alternative) and Aesthetic Liafis A Ogboye, P.E.
Getting a Grid Connection to Export Power Energy in Agriculture rd August 2016.
Electricity is produced at the power station.
Intelligent grid expansion – RheinEnergie AG, Germany
ELIMINATION OF ELECTROMAGNETIC INTERFERENCE IN TRANSFORMER STATION
Electric Machine Transformers
Per-Unit System.
PRACTICAL METHOD FOR ANALYSIS OF GROUNDING SYSTEM OF HV/MV SUBSTATIONS LOCATED IN URBAN AND SUBURBAN AREAS.
Paper 2.59 COMPREHENSIVE DEVELOPMENT OF POWER QUALITY MANAGEMENT AND EVALUATION OF VOLTAGE DIP PROBLEMS A. Mäkinen, P. Järventausta, P. Verho, Tampere.
Regulators Indices on Power Quality
CIM exchanges for maintenance at ERDF
Incompatibility between MV Switchgear conforming TO the international standards and their use in DNO’s substations M. Arens – Y Tits – Belgium – Session.
Cost-optimised Maintenance Strategy for 110 kV-Networks Dr
DISCRETE ASCENT OPTIMAL PROGRAMMING APPLIED TO NETWORK CONFIGURATION IN ELECTRICAL DISTRIBUTION SYSTEMS B. A. Souza H. A. Ferreira H. N. Alves.
Done In Class – Wed April 6
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Presentation transcript:

Frankfurt (Germany), 6-9 June 2011 Minimum short circuit power in the LV distribution network to meet EN standard requirements David MEZERA Martin KAŠPÍREK E.ON Czech Republic – Czech Republic

Frankfurt (Germany), 6-9 June 2011 This investigation was done on the basis of:  8 years experience of PQ measurement  Evaluated over 3000 measurements PQ in the LV network  The LV network contains of MV/LV distribution substation [piece] LV cable underground line [km] LV overhead line [km]  Real LV network was monitored for a long time on different PCC The sources of this survey

Frankfurt (Germany), 6-9 June 2011 The final result of measurements PQ

Frankfurt (Germany), 6-9 June 2011 Who is responsible?  DNO Pure network=low short circuit power (Sk)? Badly connected customers?  Customers Using of nonstandard apparatus? Electric apparatus?

Frankfurt (Germany), 6-9 June 2011 Minimum short circuit power LV  Thanks to IEC 725 we can set the reference impedance value, or more precisely, a relative short circuit power value for the LV distribution network and electric equipment of nominal current less than 16/75 A Electric equipment with nominal current Reference short circuit impedance [Ω] Reference short circuit power [kVA] up to 16A0,28570 up to 75A0,21760

Frankfurt (Germany), 6-9 June 2011 Relation: short circuit power X PQ

Frankfurt (Germany), 6-9 June 2011 Relation: short circuit power X PQ

Frankfurt (Germany), 6-9 June 2011 Relation: short circuit power X PQ

Frankfurt (Germany), 6-9 June 2011 Relation: short circuit power X PQ

Frankfurt (Germany), 6-9 June 2011 Conclusions for DNO  To connect the new appliances according to Sk in the LV network  To increase Sk above minimum Sk 760 kVA, (900 kVA is recommended for today real used electric appliances) To increase the cross-section of existing LV overhead lines To build new MV/LV substations

Frankfurt (Germany), 6-9 June 2011 To increase the cross-section of the existing LV overhead lines  To increase the cross-section of the existing LV overhead lines not realizable

Frankfurt (Germany), 6-9 June 2011 To build new MV/LV substations The final calculation is:  54% new substations. This accounts for a construction of 9723 new substations, including transformers and MV connection with approximate total investment cost of: EUR 280 million.

Frankfurt (Germany), 6-9 June 2011 Conclusion  The pure PQ in LV network is caused by poor conditions on both sides, DNO and customer. Solution on the side of DNO is calculated on 280 million EUR. Solution on the side of customers ??