Chapter 9 Facility Layout. Objectives of Facility Layout Minimize material handling costs Utilize space efficiently Utilize labor efficiently Eliminate.

Slides:



Advertisements
Similar presentations
Agenda of Week X. Layout Capacity planning Process selection Linebalancing Review of week 9 13 Approaches Purposes : Finishing the capacity planning Understanding.
Advertisements

Capacity and Facilities
Capacity and Facilities Design
Process Selection and Facility Layout
9 Layout Strategies PowerPoint presentation to accompany
Process Selection and Facility Layout
Process Layout Chapter 8 L L M M D D D D L L M M L L M M G G L L G G A
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
Facility Layout Facility Layout Facility Layout decisions translate the broader decisions about a firm’s strategy such as competitive priorities, process,
1 Facility Layout. 2 What Is Layout Planning Layout planning is determining the best physical arrangement of resources within a facility Two broad categories.
Roberta Russell & Bernard W. Taylor, III
Beni Asllani University of Tennessee at Chattanooga
Beni Asllani University of Tennessee at Chattanooga
Facility Layout 1. General Observations Facility Planning includes planning for: (1) the number of facilities and general facility type, (2) facility.
Chapter 10 – Facility Layout
Operations Management
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Session Pooja patnaik.
Operations Management Layout Strategy
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
7-1 Copyright 2009, John Wiley & Sons, Inc. Chapter 7: Capacity and Facilities   Capacity Planning   Basic Layouts   Designing Process Layouts 
Traditional Approaches to Facility Layout
Facility Layout Part a.
MBA 8452 Systems and Operations Management
Process (Job Shop) Layouts
Beni Asllani University of Tennessee at Chattanooga
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 5 Facilities To Accompany.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 5 Facilities To Accompany.
April 16 SP CHAPTER 8 Process Selection affects the outcome – in production or sports:
Chapter 10 and 11 Facilities.
Dr Pavlos Panayi - MBA650. Facilities Operations Management Chapter 7.
MGT Operations Management
McGraw-Hill/Irwin.
© Wiley 2007 Chapter 10 Facility Layout. © Wiley 2007 OUTLINE What Is Layout Planning? Types of Layouts Designing Process Layouts Special Cases of Process.
Facilities. Objectives of Facility Layout Minimize material handling costs Minimize material handling costs Utilize space efficiently Utilize space efficiently.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Objectives of Facility Layout Minimize.
1 Slides used in class may be different from slides in student pack Technical Note 6 Facility Layout  Facility Layout and Basic Formats  Process Layout.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Facilities Operations Management - 5 th Edition Chapter 7 Roberta.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Facilities Operations Management - 6 th Edition Chapter 7 Roberta.
Traditional Approaches to Facility Layout
Process Layout Chapter 7 July 20, 2005.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Capacity & Facilities Operations Management Chapter 7 Roberta.
Chapter 10, 11, 17 Class 3 Webster SP Facilities.
Assembly Line Balancing
© 2006 Prentice Hall, Inc.9 – 1 Operations Management Chapter 9 – Layout Strategy © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
Facilities Location, Layout and Planning. FACILITY PLANNING The placement of facility – customers, suppliers, other links in the supply chain Resources.
Technical Note 6 Facility Layout
Slide 0 of 96 Manufacturing Facility Layout. Slide 1 of 96 Basic Layout Forms Process Product Cellular Fixed position Hybrid.
Chapter 6 Facilities Layout.
Chap 4 - Facility Layout: Manufacturing and Services.
Chapter 10, 11, 17 Class 3 Webster Summer Facilities.
Chapter 9 : Layout Strategies
PRODUCTION & OPERATIONS MANAGEMENT Module II Location & Facility Prof. A.Das, MIMTS Prof. A.Das, MIMTS.
Chapter 10, 11, 17 Class 3 Webster Fall Facilities.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Facility Layout Objectives of Facility Layout Basic Types
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
Part 3.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
OPERATIONS MANAGEMENT: Creating Value Along the Supply Chain,
Capacity and Facilities Planning
Beni Asllani University of Tennessee at Chattanooga
FACILITY LAYOUT Facility layout means:
1 Operations Management Layout Strategy. 2 What is Facility Layout Location or arrangement of everything within & around buildings Determines long-run.
Process Selection and Facility Layout Lecture 5. Forecasting Product and Service Design Technological Change Capacity Planning Process Selection Facilities.
Chapter 10, 11, 17 Class 3 Webster SP
Process Selection and Facility Layout
Presentation transcript:

Chapter 9 Facility Layout

Objectives of Facility Layout Minimize material handling costs Utilize space efficiently Utilize labor efficiently Eliminate bottlenecks Facilitate communication and interaction between workers, between workers and their supervisors, or between workers and customers Reduce manufacturing cycle time or customer service time

Objectives of Facility Layout Eliminate waste or redundant movement Facilitate the entry, exit, and placement of material, products, or people Incorporate safety and security measures Promote product and service quality Encourage proper maintenance activities Provide a visual control of operations or activities Provide flexibility to adapt to changing conditions Increase capacity

Process Layout Machines grouped by process they perform Product Layout Linear arrangement of workstations to produce a specific product Fixed Position Layout Used in projects where the product cannot be moved Basic Types of Layouts

Manufacturing Process Layout L L L L L L L L L L M M M M D D D D D D D D G G G G G G A AA Receiving and Shipping Assembly Painting Department Lathe Department Milling Department Drilling Department Grinding Department P P

A Product Layout In Out

Comparison Of Product And Process Layouts 1.DescriptionSequential arrangementFunctional grouping of machines of machines of machines of machines 2.Type of ProcessContinuous, mass Intermittent, job shop production, mainly batch production, production, mainly batch production, assembly mainly fabrication assembly mainly fabrication 3.ProductStandardizedVaried, made to stock made to order made to stock made to order 4.DemandStableFluctuating 5.VolumeHighLow 6.EquipmentSpecial purposeGeneral purpose 7.WorkersLimited skillsVaried skills PRODUCT LAYOUTPROCESS LAYOUT

Comparison Of Product And Process Layouts 8. InventoryLow in-process,High in-process, 8. InventoryLow in-process,High in-process, high finished goods low finished goods high finished goods low finished goods 9. Storage spaceSmallLarge 9. Storage spaceSmallLarge 10. MaterialFixed pathVariable path handling (conveyor) (forklift) handling (conveyor) (forklift) 11. AislesNarrowWide 12. SchedulingPart of balancingDynamic 13. Layout decisionLine balancingMachine location 14. GoalEqualize work atMinimize material each station handling cost each station handling cost 15. AdvantageEfficiencyFlexibility PRODUCT LAYOUTPROCESS LAYOUT

Fixed-Position Layouts Typical of projects Equipment, workers, materials, other resources brought to the site Highly skilled labor Often low fixed costs Typically high variable costs

Line Balancing Precedence diagram Precedence diagram Network showing order of tasks and restrictions on their performance Network showing order of tasks and restrictions on their performance Cycle time Cycle time Maximum time product spends at any one workstation Maximum time product spends at any one workstation

Line Balancing Precedence diagram Precedence diagram Network showing order of tasks and restrictions on their performance Network showing order of tasks and restrictions on their performance Cycle time Cycle time Maximum time product spends at any one workstation Maximum time product spends at any one workstation C d = production time available desired units of output Cycle time example C d = (8 hours x 60 minutes / hour) (120 units) C d = = 4 minutes

Flow Time vs Cycle Time Cycle time = max time spent at any station Flow time = time to complete all stations

Flow Time vs Cycle Time Cycle time = max time spent at any station Flow time = time to complete all stations minutes 3 minutes 4 minutes Flow time = = 12 minutes Cycle time = max (4, 3, 4) = 4 minutes

Line Balancing WORK ELEMENTPRECEDENCETIME (MIN) APress out sheet of fruit—0.1 BCut into stripsA0.2 COutline fun shapesA0.4 DRoll up and packageB, C0.3

Line Balancing WORK ELEMENTPRECEDENCETIME (MIN) APress out sheet of fruit—0.1 BCut into stripsA0.2 COutline fun shapesA0.4 DRoll up and packageB, C D B C A Example 5.2

Line Balancing WORK ELEMENTPRECEDENCETIME (MIN) APress out sheet of fruit—0.1 BCut into stripsA0.2 COutline fun shapesA0.4 DRoll up and packageB, C D B C A Example 5.2 C d = = = 0.4 minute 40 hours x 60 minutes / hour 6,000 units N = = = 2.5 workstations

Line Balancing WORK ELEMENTPRECEDENCETIME (MIN) APress out sheet of fruit—0.1 BCut into stripsA0.2 COutline fun shapesA0.4 DRoll up and packageB, C D B C A Example 5.2 C d = = = 0.4 minute 40 hours x 60 minutes / hour 6,000 units N = = = 2.5 workstations workstations

Line Balancing WORK ELEMENTPRECEDENCETIME (MIN) APress out sheet of fruit—0.1 BCut into stripsA0.2 COutline fun shapesA0.4 DRoll up and packageB, C D B C A C d = 0.4 N = 2.5

Line Balancing D B C A C d = 0.4 N = 2.5

Line Balancing D B C A C d = 0.4 N = 2.5

Line Balancing D B C A C d = 0.4 N = 2.5

Line Balancing D B C A C d = 0.4 N = 2.5 A, B C D Work station 1 Work station 2 Work station minute 0.4 minute 0.3 minute

Efficiency of Line  i i = 1 titititi nC a E =E =E =E =  i i = 1 titititi CdCdCdCd N =N =N =N = Efficiency Minimum number of workstations where t i = completion time for element i j = number of work elements n = actual number of workstations C a = actual cycle time C d = desired cycle time

Line Balancing D B C A C d = 0.4 N = 2.5 A, B C D Work station 1 Work station 2 Work station minute 0.4 minute 0.3 minute E = = = = 83.3% (0.4)

Line Balancing Process 1. Draw and label a precedence diagram. 2. Calculate the desired cycle time required for the line. 3. Calculate the theoretical minimum number of workstations. 4. Group elements into workstations, recognizing cycle time and precedence constraints. 5. Calculate the efficiency of the line. 6. Stop if theoretical minimum number of workstations or an acceptable efficiency level reached. If not, go back to step 4.

1.Construct a “from-to matrix” 2.Determine the space requirements 3.Develop an initial schematic diagram 4.Determine the cost of this layout 5.Try to improve the layout 6.Prepare a detailed plan Arrange six departments in a factory to minimize the material handling costs. Each department is 20 x 20 feet and the building is 60 feet long and 40 feet wide. Process Layout Example

DepartmentAssemblyPaintingMachineReceivingShippingTesting (1)(2)Shop (3)(4)(5)(6) Assembly (1) Painting (2) Machine Shop (3) Receiving (4) Shipping (5) Testing (6) Number of loads per week Figure 9.4 Process Layout Example

Room 1Room 2Room 3 Room 4Room 5Room 6 60’ 40’ ReceivingShippingTesting DepartmentDepartmentDepartment (4)(5)(6) Figure 9.5 AssemblyPaintingMachine Shop DepartmentDepartmentDepartment (1)(2)(3) Process Layout Example

Cost =$50+$200+$40 (1 and 2)(1 and 3)(1 and 6) +$30+$50+$10 (2 and 3)(2 and 4)(2 and 5) +$40+$100+$50 (3 and 4)(3 and 6)(4 and 5) = $570 Cost = ∑ ∑ X ij C ij n i = 1 n j = 1 Process Layout Example

Interdepartmental Flow Graph Figure 9.6 Process Layout Example

Cost =$50+$100+$20 (1 and 2)(1 and 3)(1 and 6) +$60+$50+$10 (2 and 3)(2 and 4)(2 and 5) +$40+$100+$50 (3 and 4)(3 and 6)(4 and 5) = $480 Cost = ∑ ∑ X ij C ij n i = 1 n j = 1 Process Layout Example

Interdepartmental Flow Graph Figure 9.7 Process Layout Example

Room 1Room 2Room 3 Room 4Room 5Room 6 60’ 40’ ReceivingShippingTesting DepartmentDepartmentDepartment (4)(5)(6) Figure 9.8 Painting Assembly Machine Shop DepartmentDepartmentDepartment (2)(1)(3) Process Layout Example

Using Excel OM Use Operations Layout MacroUse Operations Layout Macro # of departments should be # of rooms# of departments should be # of rooms Input flows as givenInput flows as given Make sure distance table is symmetricMake sure distance table is symmetric To model adjacency, put a distance of 1 for non-adjacent departments, 0 for adjacent departmentsTo model adjacency, put a distance of 1 for non-adjacent departments, 0 for adjacent departments Or use regular distanceOr use regular distance

Relationship Diagramming Used when quantitative data is not available Muther’s grid displays preferences Denote location preferences with weighted lines

Relationship Diagramming Example Production Offices Stockroom Shipping and receiving Locker room Toolroom

Relationship Diagramming Example A A A O O O O O U U U U E X I Production Offices Stockroom Shipping and receiving Locker room Toolroom AAbsolutely necessary EEspecially important IImportant OOkay UUnimportant XUndesirable

Relationship Diagrams Offices Stockroom Locker room Toolroom Shipping and receiving Production (a) Relationship diagram of original layout Figure 5.6 Key:A EIOUX

Relationship Diagrams Figure 5.6 (b) Relationship diagram of revised layout Offices Stockroom Locker room Toolroom Shipping and receiving Production Key:A EIOUX

Using Excel OM Operations Layout Macro can be used for Relationship Diagrams tooOperations Layout Macro can be used for Relationship Diagrams too Make distance table like beforeMake distance table like before For flows table, use dummy flows:For flows table, use dummy flows: –A = 100,000O = 100 –E = 10,000U = 10 –I = 1,000X = 0