2012 MEGA eCIP PPT PART 2. Part IV Part V: Federal Requirements.

Slides:



Advertisements
Similar presentations
CovConnect v2.0 Enhancements Overview. Referral History Referral History for candidates and positions For candidates, the history reflects all positions.
Advertisements

Intern Management System Resource Teachers. Modules Resource Teacher Timesheet –Create timesheet –Enter & Save timesheet activities –Sign-off on & Submit.
This Power Point Presentation is designed to: To learn/review how to create/complete and submit an eGrants VISTA Grants Continuation Application based.
This Power Point Presentation is Designed to: Learn/Review To learn how to create/complete and submit an eGrants VISTA Grants Application based on the.
GALVESTON COUNTY, TX P-CARD TRAINING GALVESTON COUNTY.
Refresher Instruction Guide Strategic Planning and Assessment Module
EvalS Application User Guide version September 17, 2011.
WASTE MANAGEMENT ©2010 SciQuest USA Confidential 1 Powered by RFx User Guide.
Manager Video Your inside look at how to use People First.
Page 1 of 16 The Work in Progress screen is accessed from the ETS main menu. The screen will be displayed when a user clicks on the ‘Work in Progress’
Page 1 of 27 Accessing the Work in Progress folder allows you to review, edit or withdraw and track bid request(s). Welcome To the ETS – Change Bid Request.
SPA Hiring Proposals
Page 1 of 23 The FMT system utilizes Roles to determine ownership and levels of responsibility within the FMT system. The Well Licensee/Unit Operator is.
What is the Educator Development Suite? Provides teachers with the results of classroom observations and student perception surveys Suggests contextualized.
EPA Hiring Proposals
Compliance Assist Refresher Instruction Guide Adding or Editing Unit/College Strategic Goals.
C-TPAT Security Link Portal Online Application. Online C-TPAT Application - Part 1. Part 1 of the Online C-TPAT Application process: Complete the Company.
Mentor ePolls Polling for Groups. 2 What is ePolls? ePolls is the newest feature of Mentor, the IEEE tool for Working Group collaboration. ePolls allows.
Comprehensive Continuous Improvement Plan(CCIP) Training Module 5 Funding Application Workflow, Communication, and Tracking.
MEGS+ Michigan Electronic Grants System Plus Office of Special Education May 2012.
Obtaining a User Account Example Logging Into the CIP Website.
1 ThinkLink Learning Online User Manual for Predictive Assessment Series Go to www2.thinklinklearning.com/pas4mlwk. Click Educator Login. Your username.
Getting Started with Moodle Getting Started Logging In Entering Your Address Viewing a Course Navigating Your Course’s Homepage Personalizing Your.
April 1, Welcome! The 2015 B-13 Data Collection webinar will begin in a few moments. –Event number: –Event password: 2015B13 To hear.
Richard Woods, Georgia’s School Superintendent “Educating Georgia’s Future” gadoe.org GKIDS Pre-Administration Workshop Georgia Kindergarten Inventory.
Family Resource Centers in ePlan August 2015 Adding a Budget in ePlan.
Facility Reporting v. 1.0 Managing Clinical Staffing Reports on the Illinois Outcomes Website May 20, 2009.
Go to your school’s web locker site school name.schoolweblockers.com) Your user name is the first letter of your first name, the first 4.
1 92G Credentialing Program & American Culinary Federation Apprenticeship Portal.
Mentor ePolls Polling for Entity Working Groups. 2 What is ePolls? ePolls is the newest feature of Mentor, the IEEE tool for Working Group collaboration.
A Blog can be administered and accessed from any location where there is internet access. Provides for communication between home and school. Easily.
Henrico County Public Schools School-Home Communication Tool
Explorer Renewal 1/2010 Explorer Renewal Updated 9/29/14.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
Compliance Assist Refresher Instruction Guide Adding or Editing Student Learning Outcomes.
Human Resources 1 G-Top Global Workflow Employee View September 2014.
21 st Century eGAP Application. Logging into eGAP.
Steps for posting a training (single event or series) to the regional calendar R&C Regional Calendar.
ESP Tutorial for P-Card Coordinators How to approve a transaction.
Staff Module and Summary of Changes 1. Icon Changes: Page 3 Signing In and Password/Pin Changes: Page 4 Logging Out: Page 8 Staff Module Changes: Page.
A user guide to accessing, reviewing and contributing to the Online Registry System.
Contract Invoice Guide
PaymentNet: Approvers Procurement Services Laurie Krauel.
NEW GRANTS MANAGEMENT ENTERPRISE (GME) Completion Reports and User Access.
NEW GRANTS MANAGEMENT ENTERPRISE (GME) Completion Reports and User Access.
NEW GRANTS MANAGEMENT ENTERPRISE (GME) Common Issues and Processes.
School Foundation Payment System Nonpublic Modules SF 240 Training Course.
How to Create an On-Line Certificate of Veterinary Inspection (CVI) in VSPS for Accredited Veterinarians.
GMAP Grant Management, Application, and Planning Consolidate Application Training.
SDA Formulas Online webinar Tomika Moore Senior Chemist, Nonbeverage Products Laboratory September 13, 2012.
Child Care Subsidy Program Online Billing Provider Training Spring 2016.
NEW GRANTS MANAGEMENT ENTERPRISE (GME) Completion Reports and Applications.
American Diploma Project Administrative Site Training.
American Diploma Project Administrative Site Training.
Michigan Electronic Grants System Plus
An authorized user can make payments on your account by logging on with their own username and password. Click on the Authorized Users tab to add an authorized.
ePlan Tips & Strategies for Maximizing FY17 Enhancement
The Voluntary Pre-K Application in ePlan
Comprehensive Continuous Improvement Plan (CCIP)
HOW TO CREATE YOUR LISTING
21st Century eGAP Application Training FY 2017 Due May 13, 2016
MyGaDOE Portal Provisioning for Security Officers
TRIP Trip is the new online process for UK travel.
ECIP AAFEPA November 2011.
Qualtrics Survey Kenyon
How to Create and Start a Test Session
Arizona House Calls CareLink
Continuous Improvement
ESP Tutorial for Cardholder Managers
CFR Enhancement Session
Presentation transcript:

2012 MEGA eCIP PPT PART 2

Part IV

Part V: Federal Requirements

Part VI: Parental Involvement Plan

Part VII: Professional Development

Part VIII: Budget

Monitoring formerly Part IX

Monitoring Link will always be active for school users regardless of the approval level of the plan.

Monitoring

The new monitoring page will work the same way as the create comment functionality. Schools will be able to add as many monitoring items as needed. Principals and data entry users can create and save entries. Any user in the Address Book at the school level can view the Monitoring link. Monitoring comments can be added regardless of workflow status.

eCIP Evaluation

Upon completion of the monitoring entries, the team should evaluate the results of the plan. Monitoring findings should be combined in an evaluation that indicates the impact of the plan. There is not a required template. The evaluation can be in narrative or chart format.

Workflow

Workflow Steps Summary Not Started- The specific plan has not been started. The only role who can move the plan into Draft Started is a School Data Entry user. Draft Started- A draft plan is in progress. Once all sections are complete, it can be moved to Draft Completed by a Data Entry user. Draft Completed- A draft of the plan is complete. The principal of the school is notified that they can now approve or not approve the plan. Principal Not Approved- Principal did not approve the plan and it now goes back to Data Entry stage, where the plan is edited as needed and marked complete for principal approval. Principal Approved-Principal has approved the plan. The Federal Programs Coordinator or the Specialist for the district is now notified that the school’s principal has approved it and they can now either approve or not approve it.

Workflow Steps Summary cont. Specialist Not Approved- The Specialist has not approved the plan and it now goes back to the Data Entry Stage where the plan is edited as needed and marked completed for the approval process to proceed. **Role not required, but can be added to the approval process if the LEA chooses. Specialist Approved- The Specialist has approved the plan and it now moves on for Federal Programs Coordinator approval. **Role not required, but can be added to the approval process if the LEA chooses. Federal Programs Coordinator Not Approved- The Federal Programs Coordinator has not approved the plan and it now goes back to Data Entry User edited as needed and marked complete for approval according to the roles put in place by the LEA. Federal Programs Coordinator Approved-The Federal Programs Coordinator has approved the plan. The Superintendent for the district is now notified that they can now either approve or not approve it. Superintendent Not Approved-The Superintendent has not approved the plan and it now goes back to a Data Entry Stage where the plan is edited as needed and marked complete to start the approval process over. Superintendent Approved-The Superintendent has approved the plan. The plan is now considered public and is available for any person (logged in or not) to view on the website. The form will remain public until a Data Entry User moves the plan to Revision Started. Revision Started- A revision has been started on the plan. Once the revision is complete it can be moved to Draft Completed to start a new approval process beginning, again, with the Principal. The ONLY role that can move to Revision Started is School Data Entry.

Workflow Status Change

Open Plan Dates

When outside of this time frame, the only plan that can be edited or moved is the plan that is assigned to the school based on the service type through eGAP. The other plans will be available, but are read- only. Example: Message shown when in open plans date range

Example: Message shown when outside open plan date range and tied to your service type Open Plan Dates

Open Plan Dates August 3- October 5 Allows schools changing service type to work in new plan When open plan dates end, schools cannot work in the new plan type until eGap is approved. IMPORTANT for ALL data users of eCIP to be notified of their service type Data entered in the wrong plan type will not be saved when service type rolls over with eGap approval

Document Library

Document Library-Add New Folder

Document Library-Add New Document

Document Library-Upload New Document

Address Book

Address Book Access 1.“Search Schools” 2.Select the school’s name in dropdown box 3.Select “Address Book” 4.Listing of all personnel in the selected school that have accounts and roles in the eCIP

Address Book

Profiles and Passwords

Forgot your Password?

Enhancements Assurances check boxes Part III – EL Page check box Document Library feature Monitoring Page – new Part IX Optional SIS role

Reminders

Superintendent role can be added by the District Administrator Temporary password provided in the “noreply” expires Roles can be deleted not accounts

Reminder

Announcement Postings

Contact Information Fran Stewart