Project Identification & Selection Project Initiation & Planning © Abdou Illia MIS 4200 - Spring 2015 1/26/2015.

Slides:



Advertisements
Similar presentations
Identifying and Selecting Projects
Advertisements

Chapter 4 Identifying and Selecting Systems Development Projects
Managing Project Scope
CHAPTER 5: Identifying and Selecting Systems Development Projects
Initiating and Planning Systems Development Projects
Systems Planning & Selection Project identification & selection Project initiation & planning.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright 2002 Prentice-Hall, Inc. Chapter 5 Identifying and Selecting Systems Development Projects 5.1 Modern Systems Analysis and Design Third Edition.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
© 2008 by Prentice Hall 1 Chapter 2. © 2008 by Prentice Hall 2 Project – a planned undertaking of related activities to reach an objective that has a.
Identifying and Selecting Systems Development Projects.
SDLC and alternative methodologies 1/14/2015 © Abdou Illia MIS Spring 2015.
Project Scope Management J. S. Chou, P.E., PhD.
Chapter 5 Initiating and Planning Systems Development Projects
Copyright 2002 Prentice-Hall, Inc. Chapter 5 Identifying and Selecting Systems Development Projects 5.1 Modern Systems Analysis and Design Third Edition.
Project Management Phases Class 6. Initiation & Planning – Agenda Overview of the project management phases Midterm paper details.
Initiating and Planning Systems Development projects
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 6 Slide 1 Chapter 5 Initiating and Planning Systems Development.
BIS310: Structured Analysis and Design Introduction and Systems Planning Week 1.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 4.1.
System design technique  System Development Life Cycle  Prototyping  Rapid Application Development.
Chapter 4 Identifying and Selecting Systems Development Projects
Copyright 2002 Prentice-Hall, Inc. Lecture 5 Identifying and Selecting Systems Development Projects 5.1 COSC4406: Software Engineering.
1 Identifying and selecting system Development project Chapter-4.
MBI 630: Class 3 9/12/2009 OUTLINE OF CLASS Discussion –Identifying and Selecting IS Development Projects –Initiating and Planning System Development Projects.
System Planning- Preliminary investigation
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 4.1.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Chapter 5 : Initiating and Planning Systems Development Projects.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 3 Systems Planning and Selection 3.1.
© 2005 by Prentice Hall Chapter 5 Initiating and Planning Systems Development Projects Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer.
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 3 Identification and Selection of Development Projects.
Chapter 4 Identifying and Selecting Systems Development Projects Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph.
4-1 © Prentice Hall, 2007 Chapter 4: Selecting and Planning Projects Object-Oriented Systems Analysis and Design Joey F. George, Dinesh Batra, Joseph S.
Managing the Information Systems Project © Abdou Illia MIS Spring /26/2015.
Lecture 5. Review of Lecture 4 - Communication – definition - Communication processes: - Communication Planning -Information Distribution -Performance.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 5 Project Integration Management.
SDLC 1: Systems Planning and Selection Dania Bilal IS 582 Spring 2008.
Chapter 5 Initiating and Planning Systems Development Projects Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph.
BIS 360 – Lecture Four Ch. 5: Identifying and Selecting Projects
Cis339 Chapter 4 Identifying and Selecting Systems Development Projects 4.1 Modern Systems Analysis and Design Fifth Edition.
4-1 © Prentice Hall, 2004 Chapter 4: Project Management and Planning Object-Oriented Systems Analysis and Design Joey F. George, Dinesh Batra, Joseph S.
9.351 Systems Analysis & DesignPlanning1 Chapter 4: Business and Systems Planning.
Chapter 4 Identifying and Selecting Systems Development Projects Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph.
© 2008 Prentice Hall5-1 Introduction to Project Management Chapter 5 Managing Project Scope Information Systems Project Management: A Process and Team.
Information Systems System Analysis 421 Class Two.
Chapter 4 Identifying and Selecting Systems Development Projects Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
Chapter 4: Project Management and Planning Object-Oriented Systems Analysis and Design Joey F. George, Dinesh Batra, Joseph S. Valacich, Jeffrey A. Hoffer.
IFS310: Module 2 1/18/2007 Systems Planning and SDLC.
Managing Multiple Projects Steve Westerman California Department of Motor Vehicles Steve Young Mathtech, Inc.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 4.1.
Chapter 11 Project Management.
Chapter 5 Initiating and Planning Systems Development Projects
Modern Systems Analysis and Design Third Edition
Modern Systems Analysis and Design Third Edition
WORK BREAKDOWN STRUCTURE
CIS 210 Systems Analysis and Development
Business System Development
Chapter 4 Systems Planning and Selection
Chapter 4 Systems Planning and Selection
Chapter 4 Systems Planning and Selection
IS Development Managing IS Development projects
Chapter 5 Initiating and Planning Systems Development Projects
Chapter 5 Identifying and Selecting Systems Development Projects
Modern Systems Analysis and Design Third Edition
Chapter 5 Initiating and Planning Systems Development Projects
Modern Systems Analysis and Design Third Edition
Presentation transcript:

Project Identification & Selection Project Initiation & Planning © Abdou Illia MIS Spring /26/2015

Learning Objectives  Describe the steps involved when identifying and selecting projects and initiating and planning projects.  Discuss the content of and need for a Baseline Project Plan. 2

Projects Identification and Selection  A three-step process 1.Identify potential IS projects 2.Classify & rank projects 3.Select project for development 3 Ch4:82-113

1. Identify potential IS projects  Projects are identified by  Top management ▪ User departments  Steering committee ▪ Functional mngrs or IS staff  Top-Down identification  Senior management or steering committee  Focus on global needs of organization (top mgt)  Cross-functional focus (steering committee)  Bottom-up identification  User departments or functional managers  Don’t reflect overall goals of the organization  Narrow an tactical focus 4 Note: Projects identified by IS Development group based on ease of integration with existing systems. Ch4:82-113

2. Classify & rank development projects  Assessing the merit of potential projects  Can be performed by  Top management▪ User departments  Steering committee▪ Functional mngrs or IS staff  Criteria vary based on project, organization’s size, etc.  Relative ranking guides project selection 5

3. Select IS development projects  Ongoing activity b/c business condition changes over time  Incremental commitment  Continuous reassessment of project after each phase  Primary deliverable: schedule of IS projects 6

Project Initiation and Planning - PIP  Many activities of PIP could also be completed during Systems Analysis  Main actor: experienced system analyst (or team of system analysts)  Objective is transforming vague system request into tangible project description 7 Baseline Project Plan General rule: 10 to 20% of entire development effort should be expanded on PIS Ch4:82-113

Project Initiation and Planning (cont.)  Main deliverable is ─ Baseline Project Plan (BPP)  Internal document  Baseline Project Plan (BPP) reflects estimates of the project’s …  Scope  Benefits  Costs  Risks  Resources 8 Ch4:82-113