4/26/061 presents Project Crimson April 26, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.

Slides:



Advertisements
Similar presentations
WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT Week of: August 5 th, 2013 – August 9 th, 2013.
Advertisements

1 UPCOMING OPPORTUNITIES – Contractors Caissons Contractor(s) to perform installation of caissons to include purchase of all required materials. u Low/High.
Earth Control Measures at Project Detail Site Location Marina Barrage.
GeoMat™ Edge Leaching System Installation Manufactured under one or more of the following U.S. Patents; 7,374,670 7,351,005, 7,309,434, 7,157,011, 6,969,464,
Earthwork Operations & Equipments
EXAMINATION OF MODERN SANITARY LANDFILLS W. Gregory Vogt Chair, Sanitary Landfill Working Group, ISWA Vice President, SCS Engineers.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
Permeable Pavements Shingle Creek Watershed Management Commission May 31, 2011.
Various services have to be connected. Here the sewer is being connected and pipes laid for storm water removal.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Preliminary Design of Galvez Estates Subdivision.
First installation of the BullDog™ PVC pipe-to-pipe restraint system occurred on August, Eliminated need for concrete thrust blocking Case History:
E4014 Construction Surveying
 Employees who maintain and repair our streets and drainage infrastructure can help reduce water pollution by following precautions in their daily activities:
Estimating Site work. Major Components Erosion & Sediment Control Fencing Clearing and grubbing Excavation Backfill Grading Trucking.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
 An adequate drainage system for the removal of surface and subsurface water is vital for the safety of aircraft and for the long service life of the.
Sanitary Engineering Lecture 16
2013 Section Engineer’s Meeting.  Correct Type, Gauge, and Coating (Standard Drawings)  Based on Pipe Diameter, Fill Height & Soil pH  Obtain copy.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Spreadsheet Session Purpose: To illustrate the process involved in recording municipal tangible capital assets Outline: Setting up municipal equipment.
Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Essential Skills: Reading and Interpreting.
Presents Project Crimson March 1, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
GST™ Leaching System Installation Manufactured under one or more of the following U.S. Patents; 7,374,670, 7,351,005, 7,309,434, 7,157,011, 6,969,464,
Wes Marshall, P.E. University of Connecticut March 2007
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Pavement Analysis and Design
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Employees can help reduce water pollution by preventing dirt and debris from being washed into the storm drain system during the following activities:
Disclaimer – Any and all information contained herein is subject to change without notice 1 O’Hare Airfield Configuration EXISTING Airfield Configuration.
E4014 Construction Surveying Pavement Setout. Road Construction Consists of a number of sequential steps –clearing –earthworks –drainage works –pavement.
Seventh Edition By David A. Madsen, Terence M. Shumaker, and David P. Madsen Civil Drafting Technology Chapter 13 Civil Engineering Detail Drawings.
PROVO PARKING LOT DESIGN Clifton Hargus, Rachel Bytheway, Derek Noyes.
City of Madison Engineering Division Joylynne Drive and Douglas Trail Assessment District-2010 Pflaum Road to Tompkins Drive Joylynne Drive to Herro Lane.
PUBLIC INPUT SESSION NOVEMBER 10, 2015 City of Asbury Birchwood Drive Reconstruction Project.
Zoo IC Phase II – WTBA Staging December 16, 2014.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Traffic engineering Építés- és környezetföldtan 4. Engineering and Environmental Geology.
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
Sanitary Engineering Lecture 13
City of Johnston East of Merle Hay Road Infrastructure Improvements Council Meeting – NW 55 th Avenue Street Special Assessment February 17, 2015.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
Preventing Storm Water Pollution: What We Can Do Land Disturbances PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S.
Village of east aurora full depth road reconstruction & infrastructure improvements West Fillmore Avenue.
Design and Construction of Composite Lined Landfills
Water Drainage System Harris County, TX
CTC 450 Review WW Characteristics.
Storm Sewer Assessment for South Newport Subdivision
General Road Construction Information
Interstate 15 North Phase 4 Cost Estimates 09/03/2015
Storm Water Drainage Analysis for Harris County (Crosby, TX)
Site Grading Site Grading Civil Engineering and Architecture
Storm Water Pollution Prevention Plan Development
Site plan The plat map A plat map is the first step in development of a site plan. It delineates property lines with bearings, dimensions, streets, and.
RESIDENTIAL PLUMBING SYSTEMS (WATER SUPPLY)
MONTHLY STATUS REPORT– May 2013
4th Annual Construction Law Summit
Dunleith Lane drainage Spring 2015
Regulation Amendment AM April 3, 2018.
SE 12th Street Roadway Improvements February 8, 2005.
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Steps To Prepare Site For Site Work Construction Calhoun GA.
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Larimer County: engineering
Presentation transcript:

4/26/061 presents Project Crimson April 26, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams

4/26/062 Overview Progress Major Cost Items Grading Erosion Control Storm Sewer System Sanitary Sewer System Water Distribution Paving Railroad Total Cost

4/26/063 Progress Since Preliminary Report Water Distribution System Design and Analysis Sanitary Sewer Systems from Spec Building and Building on Site Storm Sewer and Detention Pond for 100 Year Flood Event Added Easier Fire Truck Access to the Building Erosion Control Fire Protection Cost Estimate Modified Elevations of Proposed Grading in Order to Cut Down on Net Cut and Fill Volumes

4/26/064 Major Cost Items

4/26/065 Grading REC efficiently raised certain elevations on site in order to cut down on the amount of net cut Grading Cost Items Include: Clearing and Grubbing Top Soil Stripping Unclassified Excavation Removing Unsuitable Material Top Soil Replacement

4/26/066 Grading Estimates Clearing and Grubbing: 2 acres Top Soil Stripping: 97,389 c.y.i.p. Unclassified Excavation: 7,008 c.y.i.p. Top Soil Replacement: 2 acres Removal/Stockpile Unsuitable Materials: 15,000 c.y.i.p $ 5,000 $ 438, $ 70,080 $ 4,040 $ 60,000

4/26/067 Erosion Control Silt fences and hay bales Necessary to prevent erosion on site during construction Protects adjacent properties from erosion damage Length of silt fence required: 14,800 l.f. Number of hay bales required: 30 bales

4/26/068 $ 445,770 $ 145,740 $ 211,140 $ 7,200 Storm Sewer System Pipes Curbs and gutters Drains and Inlets Manholes and Covers Detention Pond * included in excavation costs

4/26/069 Sanitary Sewer System Manholes – 48” dia. * Includes rings and covers $ 18,535 Reinforced Concrete Pipe 12” dia. $ 60,900 Connection to Existing Manhole $ 500 Pump and Pump Station $ 75,000 4” PVC Force Main $ 58,800

4/26/0610 Water Distribution 16” Ductile Iron Water Main $ 272,800 16” Valve and Valve Box $ 4, ” Water Meter $ 500 6” Fire Meter $ 8,000 6” Fire Hydrants $ 22,000

4/26/0611 Paving Costs Includes all pavement for roads and parking lots Includes preparation of sub-grade Truck Parking and RoadwayEmployee Parking Crushed Aggregate Base$ 309,408Crushed Aggregate Base$ 86,211 Bituminous Base$ 234,400Bituminous Base$69,525 Bituminous Binder$ 14,064Bituminous Binder$5,562 Bituminous Surface$ 234,400Bituminous Surface$ 69,525 Subgrade Preparation Cost: $97,500

4/26/0612 Railroad Track Costs Sub-Ballast (in place, compacted)$ 104,000 No. 10 Turnout$35,000 Unload, Assemble No. 10 Turnout$8, lb. Rail, Ties, Ballast, and Fabric (in place) $276,750 Bumper Post$4,660 Crossbuck and Post$800 Derail Switch Relocation$3,000

4/26/0613 Total Estimated Cost Total Estimated Cost for Project Crimson: $4,417, Please refer to your handout for the complete cost estimate, unit prices, and amounts of each unit used on site.

4/26/0614 Civil Engineers Tuscaloosa, Alabama