CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario.

Slides:



Advertisements
Similar presentations
F. Formenti - ALICE forum 16/03/ Contacted some teams for system GND discussions: cases analyzed are presented here Planned to continue with others.
Advertisements

Power e Lab PowerELab Limitedwww.powerelab.com 1 An Active EMI reduction IC WT6001 POWERELAB LIMITED A Power Converter Technology Provider.
[ 1 ] LVDS links Servizio Elettronico Laboratori Frascati INFN - Laboratori Nazionali di Frascati G. Felici LVDS links.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
Lecture 1: Safety and Protection. 1. A robot may not injure a human being or, through inaction, allow a human being to come to harm. 2. A robot must obey.
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
1 ME 234/2 HV noise investigation N.Bondar CMU. 12/18/02.
Walls crates cables gas chambers electronics CERN adb.
EMC review for Belle II (Grounding & shielding plans) Sub-systems ( XXXXX)
ATLAS Muon New Small Wheel Grounding, Power and Interconnect -Guidelines and Policies- 9 Feb 2015 John Oliver for the ATLAS Muon NSW Grounding Working.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
Electromagnetic Compatibility of a DC Power Distribution System for the ATLAS Liquid Argon Calorimeter G. BLANCHOT CERN, CH-1211 Geneva 23, Switzerland.
18-Jan-021W. Karpinski System Test Design verification of petals and interconnect boards and control links without detectors a)mechanics b)electrical.
G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Status Report on triple-GEM detector M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano.
LHCb F. Murtas Servizio elettronica G. Corradi D.Tagnani P.Ciambrone HV_GEM per LHCB M1R1 HV power supply Introduction Introduction HV_GEM Technical specification.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
SIGMA INSTITUTE OF ENGINEERING
1 Outer Tracker Front-End Layout Distribution of Signals and Bias NIKHEF/HeidelbergOctober 2002.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
07 - Winter 2005 ECE ECE 766 Computer Interfacing and Protocols 1 Grounding Grounds: –Common reference for the circuit –Safety What is the potential problem.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
BKLM RPC Signal & Ground Schematic Gerard Visser, Indiana University (for the barrel KLM team) 10th B2GM, 11/2011 magnet structure GND 7mm FOAM 3mm GLASS.
Paolucci INFN-Napoli Muon Annul Review Cern 15 September 2003 RPC cabling HV & LV cables Signal cables Position and composition of racks in UXC and USC.
12-nov-2003Muon Plenary, R.Richter1 Status of MDT elx and services ON-chamber –mezzanines –ON-chamber cables –hedgehog boards –CSM Motherboard –CSM Daughterboard.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
Grounding Guidelines Developed for LBNE
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
cm 150 cm The Al foil is large as the M3 wall  we can put 1 raw (5 chambers) or 2 raws There is an insulating material (varnish) on the.
K.WyllieElectronics meeting 29/05/061 RICH Power Supplies & Grounding Thanks to Johan Morant Paolo Baesso Xavier Le Gouard.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
1 LAPPD Team meeting 6/10/2010 Ossy Siegmund, Experimental Astrophysics Group, Space Sciences Laboratory, U. California at Berkeley Integration of Front-End.
Network Media. Copper, Optical, Fibre (Physical Layer Technologies) Introduction to Computer Networking.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
GROUNDING, SHIELDING & COOLING ISSUES ON LHCb ELECTRONICS AT THE LHC PIT 8 V.Bobillier, J.Christiansen, G.Corti, D.Lacarrère, R.Lindner, L.Roy, E.Thomas,
Thermal Screen Grounding CERN - Dec. 10 th, 2003 Enzo Carrone The thermal screen grounding and the tracker: a scary concert Enzo Carrone.
Preliminary conducted noise test results for LV power supplies Bruno Allongue CERN-PH-ESS Fernando Arteche Imperial College – CERN 21 January 2005.
IB PRR PRR – IB System.
Series and Parallel Circuits. Series Circuits ► Are the simplest type of circuits. ► Series circuits – all the components (lamps, cells, switches, etc.)
Summary of FEE-Integration Meeting LNF, Summary of the Frascati meeting on chamber & front-end integration on 10 September 2003, provided.
LOOP TESTER CALIBRATION Using the 3200 Electrical Test Calibrator.
Dr.F. Arteche EMC DEPFET Project: A general overview.
PXD – DEPFET PS noise emission tests Mateo Iglesias Fernando Arteche.
Grounding & Shielding Ved Prakash Sandlas Director General
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
1 26 November 2003, CERN LHCb Muon meeting Anatoli Kachtchouk (INFN Cagliari, PNPI) Final FEE-board conception proposed by Walter Bonivento Sandro Cadeddu.
F. Arteche EMC: Electronics system integration for HEP experiments (Grounding & Shielding)
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
EMC review for Belle II (Grounding & shielding plans) PXD system - July 2012 Dr. Fernando Arteche.
Noise & Grounding Andrei Nomerotski (U.Oxford) 17 July 2007.
KLOE II Inner Tracker FEE
Calorimeter Mu2e Development electronics Front-end Review
Analog FE circuitry simulation
A few ideas about detector grounding and shielding D. Breton
Meeting on Services and Power Supplies
Chapter 5 Review Questions and Circuit Analysis
DT & RPC Grounding STATUS
NA61 PSD. Upgrade status. Institute for Nuclear Research RAS, Moscow.
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Circuits _____________ ______________
Series and Parallel Circuits
Presentation transcript:

CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario Lenci INFN - Laboratori Nazionali di Frascati Maurizio Gatta INFN - RomaII

CERN – 7 Oct 04 2 Grounding components Grounding HV connections Front End Off-chamber connections Safety connections LVPS connections Front End On-chamber connections

CERN – 7 Oct 04 3 Reference ground Safety ground Signal ground Grounding, shielding and power distribution must be handled together to avoid EMI pickup and preserve signal integrity Signal ground : on-detector electronics ground reference Reference ground : off-detector electronics ground reference Safety ground : connection to earth How many grounds ?

CERN – 7 Oct 04 4 Grounding components Grounding HV connections Front End Off-chamber connections Safety connections LVPS connections Front End On-chamber connections

CERN – 7 Oct 04 5 Z1 Safety connections Detector must be connected to earth for safety reasons Chamb 1Chamb 2 Chamb 3 Chamb … Copper braid (sitting on the edge of the wall) Z2 Z3 Z4 Zstrip

CERN – 7 Oct 04 6 Grounding components Grounding HV connections Front End Off-chamber connections Safety connections LVPS connections Front End On-chamber connections

CERN – 7 Oct 04 7 HV supply voltage is distributed using shielded cables Shield can not be connected to ground to both sides to avoid ground loops A resistor (~ 1-10 k) is used on the detector side to break the loop Some current will flow through the low resistance safety earth network (unavoidable) HV connections HV PS Load 1-10 k

CERN – 7 Oct 04 8 Grounding components Grounding HV connections Front End Off-chamber connections Safety connections LVPS connections Front End On-chamber connections

CERN – 7 Oct 04 9 Front end on-chamber connections (I) SPBCARDIACOPB LVPS regulator board Safety ground must be connected to FC through a low impedance path (copper braid) Faraday cage is the chamber signal ground Ground connection LVPS connector CARDIAC connector Faraday cage

CERN – 7 Oct Front end on-chamber connections (II)

CERN – 7 Oct Grounding components Grounding HV connections Front End Off-chamber connections Safety connections LVPS connections Front End On-chamber connections

CERN – 7 Oct Data transmission between front end electronics and DAQ system is implemented via differential electrical connections (LVDS)  good immunity to common mode noise As we will use shielded cables one end is connected directly to ground while the other end could be connected to ground through a capacitor to avoid low frequency loops Front End Off-chamber connections Shielded Twisted cable Exceeding the common mode range can damage LVDS driver/receiver circuits |V A -V B | must be less than the LVDS common mode range A B

CERN – 7 Oct Grounding components Grounding HV connections Front End Off-chamber connections Safety connections LVPS connections Front End On-chamber connections

CERN – 7 Oct LVPS connections (I) Number of Chambers FEE boards x Chamber Icc x Chamber (A) Icc (A) x Station Total (A) Current M1 R419231,38264,96 927,36 R348125,52264,96 R224 11,04264,96 R ,04132,48 M2/M3 R ,38264,96 850,08 R ,52264,96 R ,12242,88 R ,4477,28 M4/M5 R ,38264,96 529,92 R348 62,76132,48 R224 62,7666,24 R112 5,5266,24 Total4217,28 Front end current requirements ( LHCb internal note) CARIOCA V DIALOG V

CERN – 7 Oct LVPS connections (II) 40 A Module N A M1R3 M2/M3-R3 M4/M5-R1 N A M4/M5-R3 N A M1R4 M2/M3-R4 M4/M5-R4 LVPS Patch panel & fuses Chamber 1 Chamber 2 Chamber n

CERN – 7 Oct Conclusions The on-chamber shielding and grounding scheme has been studied and successfully tested in several TB The proposed grounding scheme requires : FC as detector signal ground reference Floating low voltage power supply Chamber connected only to the safety ground High voltage ground broken by resistor The maximum ground voltage difference between on- detector and off-detector electronics must be less than LVDS allowed common voltage