Group 5 interim feedback. Group name:Group5 Group members: Tsholofelo Eunice Moitsheki Rethabile Mokoena Steven Faber Sonja Van Der Westhuizen Nhlakanipho.

Slides:



Advertisements
Similar presentations
The right tools for the job How to choose a web / bespoke development company.
Advertisements

C2-SENSE WP2 Bojan Božić, Gerald Schimak, Refiz Duro C2-SENSE WP2 Meeting Paris
FUTURICE. FUTURICE: 3 TOPICS Mikko Viikari
Project Stages. Stages Planning Initial Data Collection Situation Evaluation Solution Definition Implementation of Solution Conclusion.
April '081 The Requirements Balance Test Managers Forum - April ‘08 Stevan Zivanovic
Conceptualizing & Initializing the IT Project
Software Engineering 1. Introduction 2. Course schedule.
1 SWE Introduction to Software Engineering Lecture 16 – System Modeling An Example.
Irwin/McGraw-Hill Copyright © 2000 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS5th Edition.
© 2010 University of California, Irvine – André van der Hoek1June 10, 2015 – 06:18:06 Informatics 121 Software Design I Lecture 10 André van der Hoek &
FYP Project LYU0301: Secure and Reliable PDA-Based Communication System.
Web Order Software Requirements Specification. Purpose This Software Requirement Specification provides a complete description of all the functions, constraints.
Lesson-12 Information System Development-2
Project BlueDate. The development team Petrus Bergman - Configuration manager Oskar Holmlund – Requirements manager Mikael Nilsson – Design manager Kristian.
© 2010 University of California, Irvine – André van der Hoek1June 22, 2015 – 23:08:13 Informatics 122 Software Design II Lecture 4 Nick Lopez Duplication.
University of Jyväskylä 1 MODPA Platform Independent Design of Mobile Applications WIM Workshop 2004 Teemu Ihalainen Information Technology Research.
MS3308 Cw1 assessment guide CW1 Deadlines CW1 (Strategy and Scope) DEADLINE ONE: 14th Nov CW1 (Structure and Skeleton) DEADLINE TWO: 28-Nov-2013.
COMPASS INTEGRATED STUDENT DATA MANAGEMENT SYSTEM.
First part: Objectives (15 minutes) Second part: Work groups (20 minutes) Third part: Proposal of work groups (10 minutes) REPORT OF WORK METHODOLOGY.
The Software Development Cycle Defining and understanding the problem.
BB Gaming Project 2501 Codename “Ball Breaker” J. Fernandez, K. Geiger, D. Lynch, B. Ramaiah CS 535 OOAD Summer 2006 Prof. Craig Reinhart.
CryptKeeper Project Plan 1 CryptKeeper Project Plan.
Lesson 7 Guide for Software Design Description (SDD)
TerraForm3D Plasma Works 3D Engine & USGS Terrain Modeler Heather Jeffcott Craig Post Deborah Lee.
Design. Hard design - increase control. - Displays are more virtual / artificial. Marketplace pressure: - Adding operations cheaper. Adding controls expensive.
Crystal Yellow Agile Software Methodology For ParaView Development Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin.
Software Engineering: A Practitioner’s Approach, 7/e Chapter 2 Prescriptive Process Models copyright © 1996, 2001, 2005 R.S. Pressman & Associates, Inc.
IT Systems Analysis & Design
Modelling information systems
Muyowa Mutemwa Supervisor: W.D. Tucker Co-Supervisors: Prof. I. Venter; Mr. M Norman.
1 The Architectural Design of FRUIT: A Family of Retargetable User Interface Tools Yi Liu, H. Conrad Cunningham and Hui Xiong Computer & Information Science.
111 Subsystems CS 4311 Wirfs Brock et al., Designing Object-Oriented Software, Prentice Hall, (Chapter 7)
Bluetooth POP3 Relay Project Benjamin Kennedy April 30 th, 2002.
Embedded Systems Mohammad A. Gowayyed (c) 2012 Mohammad A. Gowayyed1.
Organizing the Requirements Information 1. Need for Organizing Requirements  Many stakeholders are involved in most projects.  They must reach agreement.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. C H A P T E R T E N Event-Driven Programming.
Software Engineering Management Lecture 1 The Software Process.
Software Project Management Lecture # 7. What are we studying today? Chapter 24 - Project Scheduling  Effort distribution  Defining task set for the.
1 5.1 Software Engineering Practice  Provide value to the user  KIS—keep it simple!  Maintain the product and project “vision”  What you produce,
1 10/14/2015ã 2007, Spencer Rugaber The Waterfall Process Software plans and requirements Validation System feasibility Validation Product design Verification.
ECTL A Support to the Automated Safety Data Monitoring Indicator project.
1 Systems Analysis and Design in a Changing World, Thursday, January 18, 2007.
Content The system development life cycle
Software Engineering Saeed Akhtar The University of Lahore Lecture 6 Originally shared for: mashhoood.webs.com.
1 Software Development Software Engineering is the study of the techniques and theory that support the development of high-quality software The focus is.
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 10 Slide 1 Chapter 13 Finalizing Design Specifications.
By: LaToya Prescod-Williams.  Higher order Thinking Activities  Easy classroom Interfacing  Learning goals /meeting student and teacher needs  List.
The Confounding World of Process Methodologies By Thelma Hataria.
Mobile Data Management Ken Rimey : Personal Distributed Information Store (PDIS) 2005-: Too Many Boxes - end-user digital asset management for.
Information Security Audit Tool Presented by Bandar Almarashi Supervisor by Dr. Neville Williams.
“bringing together current methodologies, ideas and innovative practices to teach and learn languages using digital video”
WEEK INTRODUCTION CSC426 SOFTWARE ENGINEERING.
Software Engineering 1 Object-oriented Analysis and Design Applying UML and Patterns An Introduction to Object-oriented Analysis and Design and Iterative.
Dependability issues for Philips Medical systems Frank van der Linden.
Symbian OS 1.  Symbian  Symbian OS is an operating system and software platform that designed for smart phones and maintained by Nokia.  Symbian platform.
GUI For Computer Architecture May01-05 Team Members: Neil HansenCprE Ben JonesCprE Jon MathewsCprE Sergey SannikovCprE Clients/Advisors: Manimaran Govindarasu.
111 Subsystems CS 4311 Wirfs Brock et al., Designing Object-Oriented Software, Prentice Hall, (Chapter 7)
OPERATING SYSTEMS, FILE EXTENSIONS, AND THE INTERNET.
BY MR.SUTCHUKORN TANTITHANAWARAPONG COMPUTER TEACHER AT POOLCHAROENWITTAYAKOM SCHOOL Subject :Operating System C30207.
Software Engineering Prof. Dr. Bertrand Meyer March 2007 – June 2007 Chair of Software Engineering Lecture #20: Profiling NetBeans Profiler 6.0.
T Project Review MTS [PP] Iteration
GROUPROCKET - Choose Collaboration Software for Your Company.
Software Design and Development Development Methodoligies Computing Science.
CMPT 275 TEAM DIRECTORIES. One Sentence Summary The Study Buddy is: a tool to help users study to improve their grades by simulating a multiple choice.
Android Training in Chandigarh. What is Android Android is a mobile operating system based on the Linux Kernel. The goal of android project is to create.
Software Engineering Management
The Process of Object Modeling
IT Systems Analysis & Design
CS 577b: Software Engineering II
Informatics 121 Software Design I
Presentation transcript:

Group 5 interim feedback

Group name:Group5 Group members: Tsholofelo Eunice Moitsheki Rethabile Mokoena Steven Faber Sonja Van Der Westhuizen Nhlakanipho Shabane

Where we are? The basic requirements document has been completed. The overall design architecture document has been completed. Development part is 50% complete. The game can draw a grid. The game can draw lines between the dots The game can select lines The score can be displayed

Our approach Research Mobile environment Languages Software methodology Chosen software methodology Scrum Picking tools Sprintometer Netbeans Kenai

Technology Research indicated Symbian60 OS mostly used Above indicated what type of programming languages to use (JavaMe or Python) JavaMe was selected for development SourceForge initially used, but Kenai selected Sprintometer for project management Bluetooth selected for communication

Problems encountered No project management experience Unclear software methodology & no clear plan of action Too much time spent on research No experience in mobile development Requirements had to be refined in more detail earlier Balancing family life, studies and work

User interface