Cavity status; recent KEK activities MHI-06, MHI-7, MHI-8 were vertical tested on June, July.  EP acid (1000l) was re-newed on May 15. These cavity was.

Slides:



Advertisements
Similar presentations
New Optical Inspection Results at JLab An in-depth update since Chicago meeting ILC08 (Highlights reported in US Regional Talk by Mark Champion) Rong-Li.
Advertisements

T. Saeki (KEK) 15 May 2014 AWLC2014 at FNAL
6/Nov/2012 TTC Meeting 1 Improvement of cavity performance by T-mapping/X-ray-mapping, optical inspection and local grinding Kirk.
KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Stain appeared after EP acid renewal Field emission at low gradient happened on MHI-06, MHI-07, in VT. Kyoto-camera found brown stain trace in beam pipes,
ATF Cooling Water System Toshiyuki OKUGI, KEK 2015/ 2/ 24 ATF2 Project Meeting LAPP (Annecy, France)
Recent Surface Studies in KEK-STF
Cavity-Coupler Treatment & Testing Preparation of crab cavities for KEKB RF aging of input couplers. 17 th September 2009, LHC-CC09 at CERN K.Nakanishi.
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
EP parameter comparison between JLab and KEK 28 Mar ILCW2010 at Beijing, GDE/Main Linac session T. Saeki.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Status of crab crossing studies Presented by NAKANISHI Kota (KEK) 2008/1/25.
Kyoto camera upgrade H. Hayano, (Y. Iwashita, K. Watanabe, Y. Kikuchi)
E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)
STF B.L.C. #4 second Vertical Test Summary Period : 2006/09/05~09/08 Contents : ▪ Q 0 -E acc 2K&4K ▪ Q 0 &E acc time 2K&4K ▪ Summary.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Superconducting rf test facility STF 1 Optical Inspection update at KEK Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
Field emission issue and strategy to improve H. Hayano.
TILC09 / SCRF Session Update on S0 Work in the Americas Region Mark Champion, Fermilab With slides provided by: Zack Conway, Cornell Rongli Geng, Jefferson.
KEK R&D for LHC Plan of 800MHz Cavity Calculation of 400MHz Cavity 16 th September 2009, LHC-CC09 at CERN K.Nakanishi.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
L-band (1.3 GHz) 5-Cell SW Cavity High Power Test Results Faya Wang, Chris Adolphsen SLAC National Accelerator Laboratory
Sample tests for stain problem at KEK LCWA2009 at Albuquerque 01 Oct T. Saeki 1.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Marco apollonio/J.CobbMICE coll. meeting 16- RAL - (10/10/2006) 1 Transmittance, scraping and maximum radii for MICE STEPVI M. Apollonio – University of.
CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA.
Dec/1/2015WG3 in TTC Meeting Test Result of STF-2 Cryomodule Kirk Jun/2013Jul/2015 Preliminary.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Spoke test in vertical cryostat IPNO-UU Meeting on spoke test program, 2 nd -3 st October 2013 IPNO Team.
E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 1 Status of Cryomodule-A for S1-Global at KEK Eiji Kako (KEK, Japan)
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
Curtis Crawford, Georg H. Hoffstaetter Cornell University Laboratory for Elementary-Particle Physics Optimization of f 9-cell Vertical Electro Polishing.
Current study status of high gradient at KEK Fumio Furuta KEK SCRF meeting Fermilab. Apr
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
Explosive Events during V.T. in KEK ECFA (2013/5/30) 1.
ILC Gradient R&D Rongli Geng Jefferson Lab ILC Main Linac WebEx Meeting July 28, 2010.
MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process :
Summary of Results and Development of Online Monitor for T-mapping/X-ray-mapping in KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Satoh, T. Shishido,
Standard EP recipe at KEK T. Saeki KEK Hot topics session SRF – 29 July 2011, Chicago.
CEA DSM Irfu 11/06/2016- F. Eozénou - TTC Meeting 2012 JLab WG21 Experience with Vertical Electro-Polishing at CEA Saclay Comparison with Horizontal EP.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
MHI#19 号機の1回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/2/17~
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
Plasma cleaning Laser re-melting technique at FANL M. Ge, G. Wu, J. Ruan, J. Ozelis, T. Nicol, D. Sergatskov, D. Hicks, L. Cooley Fermi National Accelerator.
Cornell Updates Commissioning of T-map for ILC single cell starts.
Vertical Electro-Polishing activities at CEA Saclay
S1G Experiment Schedule Plan
ILC10 Beijing Global Design Effort
Condition of electron beam welding toward a high gradient application
STF Plan of gradient improvement
Inspection of STF Baseline cavity #5 and #6
Vertical Electropolishing at Marui & KEK
SCRF 21-25/Apr/2008 Measurement & Calculation of the Lorentz Detuning for the transient response of the resonant cavity Introduction “Two.
Surface Analysis of the Quench Area Sample of Cavity Z111
Effort Torwards Improving Large Scale Production for SC Cavities
Recent results of Vertical-EP at KEK-Marui
Masaru Sawamura (JAEA)
Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Sato, T. Shishido, K
Recent VT Results in the STF-2 cavities
Recent SCRF Activities in IHEP
Quality control study with single-cell cavities
Vertical Test System and T-mapping/X-ray-mapping at KEK-STF
FOR SUPERCONDUCTIVE CAVITIES
Cavity Degradation Experience at S1-Global
Cavity & Cavity Integration; recent KEK activities
Presentation transcript:

Cavity status; recent KEK activities MHI-06, MHI-7, MHI-8 were vertical tested on June, July.  EP acid (1000l) was re-newed on May 15. These cavity was processed by this new EP acid. (MHI-05 was 27MV/m using aged EP acid. Nb~8g/l)  MHI-06 22MV/m stopped by RF cable trouble. (stain)  MHI-07 16MV/m stopped by field emission. (stain)  MHI-08 16MV/m stopped by cell heating. (black object at equator weld edge) The EP procedure test using old MHI 9 cell cavity (MHI-#0) : Hayano *MHI-05,06,07,08,09 are S1G candidates.

BL#6 1-cell equator, t = 306 deg. Downstream : Outside weld area BL#6 #9-BP, t = 241 deg. -1 BL#6 #9-BP, t = 241 deg. -2 Brown spot and traces; MHI-06 : spot or traces on BP-#1 、 #1 、 #2 、 #3 、 #4 、 #8 、 #9 、 #9-BP (red indicate bad) MHI-07 : BP-#1 、 #1 、 #2 、 #3 、 #4 、 #5 、 #6 、 #7 、 #8 、 #9 、 #9-BP Kyoto-camera picture examples using new LED illumination

BL#6 9-cell equator, t = 034 deg. Upstream : Outside weld area BL#6 3-cell equator, t = 291 deg. BL#6 3-4 iris, t = 055 deg. BL#6 8-9 iris, t = 053 deg. BL#6 9 equator, t = 037 deg. BL#6 9-cell equator, t = 184 deg. Upstream : Outside weld area

heating spot

Tested EP Parameter using MHI-#0 (9cell cavity) (1) Nominal STF-EP Parameter for check -> stain exist (2) Idling rotation after EP current stop, 5min ->30min ->stain exist (3) Low voltage EP ~15V(half current density EP) -> stain exist (4) 1 rotation/min -> 3 rotation/min ->stain exist (5) 15litter/min -> 20litter/min acid flow rate ->stain exist (6) more fast acid dump out from cavity will be tried, next.