“HEAR IT AND FORGET IT, SEE IT AND REMEMBER IT, DO IT AND UNDERSTAND IT” Systems Design Review P13465 – Water Table.

Slides:



Advertisements
Similar presentations
Michigan Department of Education School Improvement Plan SIP February 2011.
Advertisements

Outline Overview of Pipe Flow CFD Process ANSYS Workbench
Team 47: Ali Albayat Kyle Barringer James Butler Geoffrey Daniel Joe Sobeski.
Dept. of Computing and Technology (CaT) School of Science and Technology B.S. in Computer Information Systems (CIS) CIP Code: Program Code: 411.
Lesson-16 Systems Analysis(2)
MSD 1 P12453 Detailed Design Review Markus Holzenkamp Robin Leili Cody Anderson 5/17/2015 Detailed Design Review 1.
Introductory Faculty Training WEAVEonline 4.5. Our Objectives Today Become familiar with the WEAVE cycle Understand WEAVEonline faculty roles Learn how.
Project Management Module 3. Keep focused on the timeline Week Prepare for Kick-off Meeting Assign teams Team forming Review and execute.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
EDGE™ Concept Level Project Plan P09452 Compressor Part Fabrication and ReVamp Snehapriya Rao (ME) Ed Budriss (ME) Alex Scarangella (ME) Edward Wolf (CE)
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
EDGE™ Final Project Plan P09701 – Corning Tropel LightGage™ Metrology System Matthew Bradley (ME) Images Courtesy of Corning Tropel.
Christopher Barrett (ME) Daniel Graves (ME). Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems Primary Customer: ○ Currently.
Ice Pile Air Conditioning Joseph Cooper: Project Lead Kylie Rhoades, Clara Echavarria, Jonathon Locke, Alex Gee.
MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.
Sponsored by Wegmans P Automation/Improvement of Packaging on the Cookie Line Stephanie Rager Bruno Coelho.
Project Management Phases Class 6. Initiation & Planning – Agenda Overview of the project management phases Midterm paper details.
Best Practices By Gabriel Rodriguez
“HEAR IT AND FORGET IT, SEE IT AND REMEMBER IT, DO IT AND UNDERSTAND IT” ME and ChemE Lab and Demo Hardware DPM – Spring 2012.
Design Documentation in ME 2110 Jeffrey Donnell MRDC June, 2010.
Preparing for the Launch Mohammed El- Affendi. Launch Major Tasks  The Launch is performed according to script “LAU1”, table 3.1 in the book (page 39),
System Establishing Your Management Reporting System.
Project Management Project Planning HR, Procurement, Quality, Communications
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
IPMA Executive Conference Value of IT September 22, 2005.
University Planning: Strategic Communication in Times of Change Cathy A. Fleuriet Ana Lisa Garza Texas State University-San Marcos Presented at the July.
Additional roles include the following: ► ► Group analysis by Separate descriptive statistics are generated for each group. The groups are determined.
P16221 – FSAE Shock Dynamometer System Level Design Review September 29, 2015.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number: P
UCATS - Status Report1 UCATS Unmanned Control & Tracking System Kurt Chewing Jennifer Greene Dave Manley Jeanette Smith John Smith Team DJ 3 K.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number:
By Germaine Cheung Hong Kong Computer Institute
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
P15080: Flow Culture System Multi-Disciplinary Senior Design Problem Definition Review September 11, 2014 Collin Burkhart – Lead Mechanical Engineer Katelyn.
Pharmacy School Self Study Prof. Abdalla Elkhawad UMST.
Nanofluidic Characterization David Sharp David West Justin Davis.
CFD Lab 1 Simulation of Turbulent Pipe Flow Seong Mo Yeon, Timur Dogan, and Michael Conger 10/07/2015.
P16452: Active Reciprocating Compressor Valve Assembly Week 9: Subsystem Design Review.
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
P13631: Gravity Fed Flow Process Control Teaching Aid An RIT education couples theory in lecture with practical application in lab. In the past, carts.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
SYSTEM LEVEL DESIGN REVIEW P16318 Gaseous Mass Flow Rate Controller Luke McKean, Lianna Dicke, Selden Porter, Schuyler Witschi ?
Annual Planning Task Force (APTF) Recommendations NOVEMBER 18, 2014.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
Lightweight Fuel Efficient Engine Package. Team Members Evan See, ME Chris Jones, ME John Scanlon, ME Stanley Fofano, EE Taylor Hattori, ME Brittany Borella,
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
Systems Analysis Lecture 5 Requirements Investigation and Analysis 1 BTEC HNC Systems Support Castle College 2007/8.
Detailed Design Review P13465 – Water Table
MANAGEMENT of INFORMATION SECURITY, Fifth Edition
Turbomachinery Flow Visualization P08453
Business System Development
Concept Level Project Plan P08453 – Turbomachinery Flow Visualization
Cold Pressure Fusing II Team Fusion
Framework for Strategic Plans and Annual Performance Plans
Patrick Duggan, Eric Goff, Garrett Hart, Tom Kline, Chris Salim
P10457: D-R Process Improvement
CIS 210 Systems Analysis and Development
Project Readiness Review P10029 – Air Muscle Artificial Limb
Heart Pump and the Circulatory System P17080
Final Project Plan P09004 – Eye Movement Tracking Device
Wednesday, February 16, 4:00-6:00PM
Joint Application Development (JAD)
NON-ACADEMIC ASSESSMENT REPORTING FY’19
Presentation transcript:

“HEAR IT AND FORGET IT, SEE IT AND REMEMBER IT, DO IT AND UNDERSTAND IT” Systems Design Review P13465 – Water Table

Water Table MSD Team Primary Customers: Ed Hanzlik John Wellin Faculty Guide: Gerald Garavuso Team Members: John Harrington, Project Manager Andrew Nauss, Lead Engineer Timothy Jordan, Project Engineer Dan Abdeen, Project Engineer

Today’s Agenda Overview Project Description Project Scope and Planning Customer Needs Functional Decomposition Engineering Metrics/Specifications House of Quality Initial System Concept Generation and Design Initial Concept Generation Concept Selection Feasibility Analysis Systems Model Preliminary Risk Assessment Preliminary Budget What’s next? Project Schedule Review Concluding Comments Questions/Comments/Concerns

Project Description – Water Table Force straight flow over an object of some geometry to study fluid dynamic effects Primarily used for displaying concepts of:  Streamlines  Flow Separation  Vortex Shedding Top down view Variable flow speeds Laminar flow regime To be used for educational use Assist in fulfilling the ME department’s mission statement

ME Department Mission Statement The ME faculty have adopted the goal of establishing our department as one of the top 25 ME programs first in the nation, and then in the world. Based on a strategic planning retreat in May 2008, the faculty agreed that we, collectively as a department and in collaboration with others, should accomplish three tasks, in pursuit of our goal: Demonstrate a revolutionary advance in engineering education whereby we turn every entering student into graduates who achieve outstanding success. Provide solutions to three compelling problems of national and global significance. Other ME departments must emulate us. We must disseminate our model of education and research, and become the role model to which other institutions aspire.

Customer Needs

Functional Decomposition

Engineering Metrics/Specifications

House of Quality All specifications correspond to a customer need and vice versa

Initial Concept Generation Fluid Flow visualization Flow speed control Holding fixture for specimen Angle-of-attack fixture for specimen Water movement Water reservoir Flow meter Inputting water Expelling water Cart structure Flow straighteners Geometry of water table Test section material

Concept Selection Each task on functional decomposition was analyzed

Concept Selection Research was conducted to assess each concept Tables were used to assess concepts by comparing concepts with functions/parameters

FluidWater Flow visualizationPrimary= electrolysis ; Secondary = beads Flow speed controlControl valves Holding fixture for specimenMagnet on ferrous plate Angle-of-attack controlManual Water movementAC pump (provided) Water reservoirExternal drum Flow meterParticulate visualization Inputting waterPump & valve system Expelling waterPump & valve system Cart structureWooden truss on casters Flow straightenersTube type Geometry of water tableFunneled entrance with 1 inlet, 2 exits Concept Selection Function/Parameter Concept Selected

Systems Model Top view on next slide…

Systems Model

Flow Analysis CFD in FLUENT, symmetry used Flow simulation at 1 ft/s (worst case for straightness) Conclusion: Flow at test section meets specification, uniform within about.1 ft/s

Electrolysis Feasibility Preliminary testing has been conducted to better understand power requirements and bubble flow. Results  Test 1 | Test 2 Test 1 Test 2  Electrolysis Test Clip Electrolysis Test Clip  Test 2: 24V w/ 4 Tsp.

Pump Feasibility Flow rate for 1ft/s through 3” tall and 10” wide test section  93.5 gallons per minute Estimated head between pump and table  3 feet  No pipe losses accounted for Power Output to fluid=Q*ΔP  0.07 horsepower Conclusion: 1/3 hp pump should be sufficient

System Flowchart

Timing Diagram

Risk Assessment

Preliminary Budget

Project Schedule Review Project has been documented and tracked using an excel spreadsheet

Project Schedule Review Next major targets for our system… Targets will be expanded upon as project design becomes more defined.

Questions/Comments/Concerns