30 March 2005Safety Lock Mailbox1 Safety Lock Mailbox ME 4182: A-Team Week 11: Prototype Production Carlos Alzate Brian Dorton Song Park Varun Sharma Jack.

Slides:



Advertisements
Similar presentations
Doors and Windows.
Advertisements

Exterior Window and Door Frames
Residential Safety Wichita Police Department Crime Prevention Unit.
Group #10 January 20, 2011 Preliminary Design Review for EE495B Capstone Senior Design Faculty Project Lead: Dr. Ralph Whaley Team Members: Jared Booth,
Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
Castigliano’s theorems
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review March 20, 2008.
Week 14 11/26 – 11/30. Define problem, brainstorm ideas, and research playground design.
Mechanics of Materials Lab
Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 3 Tuesday 10/24 – Monday 10/30.
Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2006 P. 1 Today and the Week Ahead Week 3 Day 1.
Project 2: ATM’s & Queues
Beam Deflection Review ( )
Beams: Pure Bending ( ) MAE 314 – Solid Mechanics Yun Jing Beams: Pure Bending.
Classic Rocker Team 7 Thomas Dabrowski Sarah Philo Adam Rauwerdink.
Sheet Metal Bending.
Control of Halbach Array Magnetic Levitation System Height By: Dirk DeDecker Jesse VanIseghem Advised by: Dr. Winfred Anakwa Mr. Steven Gutschlag.
Team Wrecked Week 9 Deliverables: Engineering Analysis.
1 ME 323 Final Lecture – April 2011 Additional Topics.
Travelling Studio to Brazil ZEMCH Zero Energy Mass Custom Home Social, economic and environmental suitability for low-cost social housing development.
Team 14: The Design and Construction of an Ackerman-Steered Robot Members: Kyle Quinn Julio Sosa Robert Steel.
Design for Manufacturing Team: Constraints:  Main construction material should be wood  Other materials such as metal, fabric, or plastic may be used.
IT 499 Bachelor Capstone Week 8. Adgenda Administrative Review UNIT Seven UNIT Eight Project UNIT Nine Preview Project Status Summary.
Jiangyu Li, University of Washington Lecture 2-4 Beam Mechanics of Materials Laboratory Sec. 3-4 Jiangyu Li University of Washington Mechanics of Materials.
9 February 2005ME 4182; Safety Lock Mailbox1 A-Team Safety Lock Mailbox Week 5 – Products and Patents Carlos Alzate Brian Dorton Song Park Varun Sharma.
Problem Statement There are over 25 million children under the age of 5 in the United States, many of these children are taken out to restaurants to eat.
Warm-up Day of Ch. 6 Closure problems 6-88 Rocket Problem It is the end of the year. The Science and Engineering Club is going to have one last event.
Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Capstone Design Mechanical, Industrial, and Manufacturing Engineering.
27 April 2005Safety Lock Mailbox1 Safety Lock Mailbox ME Final Presentation Carlos Alzate Brian Dorton Song Park Varun Sharma Jack Vasko Adam Zurawski.
Real World Rates Poster assigned September 21, 2015.
Lecture #7 Energy concepts. Calculation of displacements.
Infinity Software Development Physical Operations Relocation.
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
Lesson 17 Anchor Activity. Overview Purpose Timeline Possible Resources Grading Rubric Device Selection.
MS Project 2000 / 2003 Luke E. Reese Biosystems and Agricultural Engineering September 17, 2009.
P16221 – FSAE Shock Dynamometer Preliminary Detailed Design Review November 13, 2015.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
Length-scale Dependent Dislocation Nucleation during Nanoindentation on Nanosized Gold Islands Alex Gonzalez Department of Mechanical Engineering University.
The use of Superplastic Tin-Lead Alloy as A solid Lubricant in the Free Upsetting of Aluminum and Brass Adnan I.O.Zaid1,a*, Hebah B. Melhem2,b Ahmad Qandil.
Prototype Update #3 Team Meathead April 13, 2005.
This week in Junior Infants we were learning about materials. We decided to look for these materials in our classroom.
The ‘Team Alpha’ Super Coaster Meet the Team – Aron Beierschmitt- Design Lead/Business Analyst – Jordan Hamblen- Project Manager – Kevin Johnson- Construction.
Week 8 Deliverables. Assisted Living Facility Visit Talked with elderly who are currently using walkers, a few who were using the same model as the one.
Warmup: 1) Turn in your permission forms to the front basket. 2) Open up your notebook to the Table of Contents. 3) Draw a line under the last entry –
ECE 477 DESIGN REVIEW TEAM 14  SPRING Project Overview  Target Audience: Amateur Musicians  Obtain a “Guitar Tab” format of music  View Tabs.
Objective The students will learn the importance of the Civil War for the United States, and be able to identify the important people and dates of the.
16 February 2005ME Safe Lock Mailbox1 A-Team Safety Lock Mailbox ME Week 6 Carlos Alzate Brian Dorton Song Park Varun Sharma Jack Vasko Adam.
3/16/2016 Vanderbilt Motorsports Intake and Exhaust Project 1 Vanderbilt Motorsports Intake/Exhaust Team January 17, 2008 Presentation Kristina Kitko Mark.
The Great Team1 Week 7 : Post Midterm Review and Layout Drawings Bunk Bed Converter Adam Brown Blaine Gardner Sarah Gleaton Jimmy Jiang Addisu Lemlem Lee.
Chapter 16 Lecture 2 Sheet Metal Forming. Figure 16.14a: Major Strain and Minor Strain During stretching in sheet metal, Volume constant –  l +  w +
Design Cycle. 1.What is the problem? – Often identified by a “customer” need 2.Define requirements – This does not mean a design solution. – The requirements.
26 January 2005Team Safety Lock Mailbox1 Team Safety Lock Mailbox ME Week 3 Carlos Alzate Brian Dorton Song Park Varun Sharma Jack Vasko Adam Zurawski.
364 書名: Essentials of Mechanical Engineering Design, 1/E 作者: Shigey Mischke Budynas 書號: MX0398.
2 March 2005Safety Lock Mailbox1 Safety Lock Mailbox ME 4182: A-Team: Week 8 Carlos Alzate Brian Dorton Song Park Varun Sharma Jack Vasko Adam Zurawski.
The Whirl Around By: Adria O’Neal Andre Merino Brett Stroube.
UOP WEB 237 Complete Class Check this A+ tutorial guideline at For more classes visit.
WEB 237 Week 5 Learning Team Finalized Paper Only Submit the eCommerce analysis paper and prototype Check this A+ tutorial guideline at
Draft copy – Yet to modify
Milltown’s STEAM Expo March 17, 2017.
Multistory Office Building
HCS 446 Possible Is Everything/tutorialrank.com
HCS 446 Education for Service/tutorialrank.com
P17082 Biomechanical Elbow Model Build and Test Review
Lab Safety Policies Don’t stand on lab chairs
Wood Frame Construction
Group Oral Presentation Overview
P17082 Biomechanical Elbow Model Build and Test Prep
P17082 Integrated System Build & Test Review
Unit 5- Age of Imperialism Timeline
ME 323 Final Lecture – April 2012
Presentation transcript:

30 March 2005Safety Lock Mailbox1 Safety Lock Mailbox ME 4182: A-Team Week 11: Prototype Production Carlos Alzate Brian Dorton Song Park Varun Sharma Jack Vasko Adam Zurawski

30 March 2005Safety Lock Mailbox2 Presentation Overview Updated Engineering Analysis Updated Prototype Prototype Production Plans

30 March 2005Safety Lock Mailbox3 Engineering Analysis

30 March 2005Safety Lock Mailbox4 3-D Design

30 March 2005Safety Lock Mailbox5 2-D Design

30 March 2005Safety Lock Mailbox6 Floor Mechanical Analysis – Continuous Sheet Minimum Bending Radius Assumptions Sheet is in pure bending Parameters Result Material: Aluminum Alloy 2024

30 March 2005Safety Lock Mailbox7 Floor Mechanical Analysis – Continuous Sheet Bending Force Assumptions The forces on the sheet act as shown in the diagram The radius of curvature can be approximated as Ro Castigliano’s Theorem (Strain Energy Method)

30 March 2005Safety Lock Mailbox8 Floor Mechanical Analysis – Continuous Sheet Force to Move Floor (when almost totally retracted) Parameters Result

30 March 2005Safety Lock Mailbox9 Floor Retraction Force: Hinged

30 March 2005Safety Lock Mailbox10 Linkage and Door Force Analysis

30 March 2005Safety Lock Mailbox11 Position Analysis for the linkage A BC D l1l1 l3l3 l2l2 x y

30 March 2005Safety Lock Mailbox12 Position Analysis for the linkage

30 March 2005Safety Lock Mailbox13 Updated Prototype Tracks –Will construct out of wood due to high cost of teflon ($60 for 6”x6”x.5”) Closing Floor –Hinges –Chrome/Nickel Plated Lower Box –Scrap Sheet Metal

30 March 2005Safety Lock Mailbox14 Prototype Production Plans

30 March 2005Safety Lock Mailbox15 Prototype Timeline

30 March 2005Safety Lock Mailbox16 Team Build Brian’s House or MRDC Week 1 (4/30 – 5/6) –Friday 5/1 –Saturday 5/2 –Monday 5/4 Week 2 (5/6 – 5/13) –Friday 5/8 –Saturday 5/9 –Monday 5/11 Week 3 (5/13 – 5/20) –Friday 5/15 –Saturday 5/16 –Monday 5/18 Week 4 (5/20 – 5/27) –Friday 5/22 –Saturday 5/23 –Monday 5/25

30 March 2005Safety Lock Mailbox17 Future Plans Build Exterior of mailbox Secure prototype materials Begin preliminary work on final presentation, paper, and poster

30 March 2005Safety Lock Mailbox18 Questions?