Traceability, Change and Quality – Chapters 27-29 Requirements Text Sriram Mohan/Steve Chenoweth.

Slides:



Advertisements
Similar presentations
Recall The Team Skills 1. Analyzing the Problem (with 5 steps) 2. Understanding User and Stakeholder Needs 3. Defining the System 4. Managing Scope 1.
Advertisements

Chapter 05: Evolutionary Requirements Definition : Requirements  “Requirements are capabilities and conditions to which the system, and more broadly.
Chapter 4 Quality Assurance in Context
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Inception: Starting a New Project Needs Features Vision.
1 Quality CSSE 371 Software Requirements and Specification Mark Ardis, Rose-Hulman Institute October 25, 2004.
Traceability CSSE 371, Software Requirements and Specification Steve Chenoweth, Rose-Hulman Institute October 22, 2004 In the book – This is Ch
Team Skill 6 - Building The Right System Part 2: Traceability, Change and Quality (Chapters of the requirements text) CSSE 371 Software Requirements.
Software Quality Engineering Roadmap
Requirements Specification
1 Team Skill 4 - Team Skill 5 - Scope Refining the Systems Definition (Chapters of the requirements text) CSSE 371 Software Requirements and Specification.
Recall The Team Skills 1. Analyzing the Problem 2. Understanding User and Stakeholder Needs 3. Defining the System 4. Managing Scope 5. Refining the System.
SE 555 Software Requirements & Specification Requirements Management.
Recall The Team Skills 1. Analyzing the Problem 2. Understanding User and Stakeholder Needs 3. Defining the System 4. Managing Scope 5. Refining the System.
1 Team Skill 1 - Analyzing the Problem Sriram Mohan/ Steve Chenoweth 371 Ch 5 in Requirements Text.
Recall The Team Skills 1. Analyzing the Problem (with 5 steps) 1.Gain agreement on the problem definition. 2.Understand the root causes 3.Identify the.
Fundamentals of Information Systems, Second Edition
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
® IBM Software Group © 2006 IBM Corporation PRJ480 Mastering the Management of Iterative Development v2 Module 3: Phase Management - Inception.
Copyright © Craig Larman All Rights Reserved Requirements.
RUP Requirements RUP Artifacts and Deliverables
Requirements Management with Use Cases Module 6: Define the System Requirements Management with Use Cases Module 6: Define the System.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Project Management Process Groups
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
CMPT 275 Software Engineering
IT Requirements Management Balancing Needs and Expectations.
System Thinking and Project Management Process
Copyright 2009  Describe the five project management (PM) process groups, the typical level of activity for each, and the interactions among them  Understand.
INFO 425 Week 11 INFO 425 Design Problem I Week 1 Glenn Booker.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
Chapter 7 Applying UML and Patterns Craig Larman
INFO 637Lecture #101 Software Engineering Process II Review INFO 637 Glenn Booker.
Traceability, Change and Quality – Chapters Requirements Text Steve Chenoweth & Chandan Rupakheti RHIT Question 1.
Software Testing and Maintenance 1 Code Review  Introduction  How to Conduct Code Review  Practical Tips  Tool Support  Summary.
Requirements Management Traceability Planning for Change Methodology Tools.
REQUIREMENTS - WHY WHAT AND HOW? Steve Chenoweth & Chandan Rupakheti CSSE 371 Chapters Requirements Text. Question 6.
1IT Project Management, Third Edition Chapter 3 Chapter 3: The Project Management Process Groups: A Case Study.
Managing Change 1. Why Do Requirements Change?  External Factors – those change agents over which the project team has little or no control.  Internal.
Lifecycle of a Requirement in Product Development Scenario RMsis – v Simplify Requirement Management for JIRA.
Apply Quality Management Techniques Project Quality Processes Certificate IV in Project Management Qualification Code BSB41507 Unit Code BSBPMG404A.
Project Deliverables CEN Engineering of Software 2.
Requirements Engineering for Web Applications. SR: System Vision Document Written by key stakeholders Written by key stakeholders An executive summary.
Chapter 31 Your Prescription for Requirements Management.
Software Engineering 1 Object-oriented Analysis and Design Applying UML and Patterns An Introduction to Object-oriented Analysis and Design and Iterative.
Team Skill 6: Building the Right System Assessing Requirements Quality (29)
1 Team Skill 1 - Analyzing the Problem Continued and Product Features and Challenges Sriram Mohan.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
RequisitePro Software Requirement Management Tool A peresentation by: Mojdeh Jalali-Heravi Maryam Daneshi.
Applying Use Cases to Implementation (Chapters 25,26 - Requirements Text) Steve Chenoweth & Chandan Rupakheti Question 1.
Focus on design principles and on a process for doing design = To produce a precise, complete, high- quality foundation for product implementation.
Lecture 4: Requirements Engineering COSI 120b, Principles of Software Engineering.
An Agile Requirements Approach 1. Step 1: Get Organized  Meet with your team and agree on the basic software processes you will employ.  Decide how.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Requirements Management with Use Cases Module 4: Analyze the Problem Requirements Management with Use Cases Module 4: Analyze the Problem.
Requirements Management with Use Cases Module 2: Introduction to RMUC Requirements Management with Use Cases Module 2: Introduction to RMUC.
Agile Requirements Methods 1. Mitigating Requirements Risk  The purpose of a software method is to mitigate risks inherent in the project.  The purpose.
by: Er. Manu Bansal Deptt of IT Software Quality Assurance.
Your Prescription for Requirements Management 1. Assumptions The prescription for requirements management is based on the following assumptions:  The.
Change Request Management
Team Skill 1 - Analyzing the Problem
Use Cases Discuss the what and how of use cases: Basics Benefits
Chapter 3: The Project Management Process Groups: A Case Study
BSA 376 AID Lessons in Excellence-- bsa376aid.com.
Team Skill 6 - Building The Right System Part 2: Traceability, Change and Quality Sriram Mohan.
Traceability – Chapter 27
Applying Use Cases (Chapters 25,26)
Managing Change and Quality
Presentation transcript:

Traceability, Change and Quality – Chapters Requirements Text Sriram Mohan/Steve Chenoweth

Traceability: Primary Questions Why is tracing important? 2 Why we care – remember this triangle?

Traceability: The Problem How do you know, if you’re at one of these later stages, that you have a requirements fault? 3

In general, how to trace… 4 Use Traceability matrices

Tracing User Needs to Features 5 Feature 1Feature 2...Feature n Need 1X Need 2X …XX Need mX

Tracing Features to Use Cases 6 Use Case 1 Use Case 2...Use Case n Feature 1X Feature 2X …XX Feature 3X

Tracing Requirements to Implementation 7

Tool Support Spreadsheets ◦ Maintaining and updating the links is difficult Relational Databases Requirements Management Software ◦ Extra Credit: Find two web based requirements management software and briefly describe the features they support. Submit using Angel (Lessons – Extra Credit – Week 6 – Requirements Management Software) 8

Factors for Change External Internal Unofficial sources contributed up to half of the total scope of the project 9

Managing Change: Primary Questions How do you capture change requests? How do you respond to these (individually & overall)? How does this tie-in with tracing requirements ? 10

A Process for Managing Change 11 Step 1: Recognize that change is inevitable, and plan for it

A Process for Managing Change Step 2: Baseline the requirements ◦ This means they are signed-off on, and ◦ From then on, they fall under change control – see below 12 Step 3: Establish a single channel to control change –No ad hoc additions –No ad hoc fixes, either

A Process for Managing Change 13 In  this big picture, you especially need to know what “release management”  is! Figure on middle right from Step 4: Use a Change Control System to Capture Changes Step 5: Manage Change Hierarchically

Follow the link There is a dependency between the various artifacts involved in requirements mgmt Follow the chain and make sure that the change is propagated 14

Products vs. Processes Organizations that produce high-quality products invest in high-quality processes. Product quality can be measured through testing. How can we measure process quality? 15

Review Methods Informal ◦ Ask a peer to read and give comments Formal ◦ Ask a peer to prepare for review ◦ Record and report results of review Active ◦ Interrogate reviewer 16

Checklists Look for anticipated defects Some defects apply to almost all artifacts ◦ Does the artifact exist? Some defects are artifact-specific ◦ Have you identified all stakeholders? 17

Problem Statement Checklist 1. Has a problem statement been drafted? 2. Is it written in an easy-to-understand way? 3. Does the team understand it? 4. Has it been circulated for agreement to the key stakeholders, including management? 5. Do the team members have agreement that this is the problem they are trying to solve? 18

Supplementary Specification Checklist (1/2) 1. Have you established an appropriate template? 2. Are all functional requirements not specified by use cases included in the supplementary specification? 3. Have requirements for usability, reliability, performance and supportability been captured? 19

Supplementary Specification Checklist (2/2) 4. Have design constraints been identified? 5. Have supplementary requirements been linked to use cases where appropriate? 20

Extra Credit How are requirements captured in the agile and extreme methodologies? Read Chapter 30 and write a report. (Lessons -Extra Credit - Week 6 - Requirements in an agile world)