PH Theme 3 R&D Introduction Lucie Linssen Meeting with WP leaders 3/11/2008.

Slides:



Advertisements
Similar presentations
Material budget overview DescriptionCoordinatorBudget Allocated PaidOpen commit. Balance WP 4 Radiation hard semiconductor detectors Michael Moll 320k22k144k154k.
Advertisements

Peter Kodyš, March 21, 2006, DEPFET workshop, Prague, Status in Prague1 Charles University Prague Pavel Bažant, Zdeňka Broklová, Jan Brož, Zdeněk Doležal,
Presentation title Date of presentation. Setting the scene Use this slide to introduce yourself and your role within the organisation. Outline purpose.
SLHC-PP Status of Finances D.Abbaneo, M.Capeans M.Maitrel, C.Montagnier October 2010.
Management’s preliminary comments to the ERC Report.
ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
PG2 Solid State Tracking Detectors Seems like we are all newcomers here Topics are arranged according to R&D topic not sub-system as it was in 2013 – Meaning.
Introduction SHEP: Sexual Health Education Program University Health Services, Tang Center, Health Promotion Unit Sponsored Program Group of trained student.
Linear Collider Common Fund Report M. Hronek1 19.JUN.15 CERN.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
DIRECTOR-GENERAL’S UNIT Training activity report DTOs workshop
Platform Technology Solutions (PTS) Organization overview.
April 1, 2007 Global Design Effort 1 Materials for S4 meeting Discussion of risks in BDS WP April 1, 2007.
CANDU Owners Group Inc. “Strength Through Co-operation” 1 Presentation to CNC-IAPWS May 23, 2003 AN OVERVIEW OF CANDU OWNERS GROUP R&D PROGRAM for CNC-IAPWS.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Taking stock and next steps CCWG F2F, 23 March 2015.
Emissivity and other infrared-optical properties (WP6)
Senior Staff PH COFUND fellows (R.Voss, S. Hegarty) 2009 Budget (J.Salicio) News / questions & answers (P.B.)
Introduction / CLICdp news (CLICdp - CLIC detector and physics) -- CLICdp meeting at AWLC14, 13 May Konrad Elsener, CLICdp session, AWLC14 1 Konrad.
“Linear collider studies: This heading includes the total funding for CTF3, the CLIC study and the CLIC/ILC collaboration as well as the CERN’s participation.
Planning in PH Department Structure Workunits Planning Cycle Your Questions …
Developing a Sustainable Procurement Policy and Strategy EAUC – EAF Programme.
News, plans, wrap-up -- CLIC workshop, Febr. 5 th Lucie Linssen, CLICdp, wrap-up, February 5th Lucie Linssen.
Target Mechanical R/D Magnetic Immersion Effects (Daresbury Experiment) Pass-Through/Seals (Vacuum, Water union)- leaks, survivability Thermal Loading.
SFT Group Meeting July 3rd Group NewsPere Mato 2. Proposal for the new group web infrastructure Yves Perrin 3. Parallelizing Gaudi applications.
1/8 Lucie Linssen LCD monthly meeting 10 October 2011 CDR Status and Review in Manchester and LCD notes Lucie Linssen.
GTZ | Tim Mahler| Project Management Project Management.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
Project management and communication structure Nataša Urbančíková Faculty of Economics Technical University of Košice.
Lucie Linssen, CLICdp, bi-monthly meeting, 3 Aug General news CLICdp monthly meeting August 3 rd 2015.
SFT Group Meeting May 15th Group NewsPere Mato 2. The CernVM Infrastructure: Insights of a paradigmatic projectCarlos Aguado 3. The new Geant4.
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
RESEARCHERS WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 The agenda Coordinator's Welcome 09:05.
1 WP7 Presentation WP7 -- Project Evaluation Computer Engineering and Networks Laboratory, ETH Zurich Prof. Dr. Bernhard Plattner.
Use of resources and EC funding in year 2 EuCARD Governing Board meeting , CNRS, Paris Overview of EuCARD WPs and budget Use of resources by.
Taking stock and next steps CCWG F2F, 23 March 2015.
JRA1 Activities Administrative issues –Financial accounting system established at DESY Based on SAP, traces all WP`s in JRA Based on EXEL, traces all cost.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
PH Theme 3 R&D Meeting with WP leaders 3/7/2008. Overview of WP’s.
Public Hearing: 3 rd Quarter Expenditure and budget Implementation Vote 24: Police 1.
First discussions regarding new EU AIDA project EUROnu WP5 Meeting 8 September 2009 Paul Soler.
CERN GS Department CH-1211 Genève 23 Switzerland cern.ch/gs-dep Internet Services GS AIS General Services Department GS Advanced Information Services EVM.
Thursday December 11th, 15:00 Hrs, room 155-R-047 Agenda General news and DT (Andrea, Antti) Euclid-Catia.
Thursday November 19 th, 15:00 Hrs, room 155-R-047 Agenda An introduction to the Project Office.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Work Package 1: Pixel detector systems for particle.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
CERN participation in EU project CREMLIN CERN-internal introduction meeting July 17 th 2015 Lucie Linssen.
SLHC – PP Budget April 3rd, 2008 CERN April 2, 2008 M.C.
CLIC work program and milestones
Target & Frontend Switch Yard & Collection Boxes Medicis Seminar, 2nd and 3rd March 2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE.
A few slides from the EP group leaders retreat
Thermal-Structural Finite Element Analysis of CLIC module T0#2
June 22, 2017 Burkhard Schmidt for the DT coordination team
CERN R&D plans and Infrastructures
EN-ARP Group meeting L. Serio, P. Barrière & E. Delachenal.
4th FRC meeting, Antti Onnela, CERN-PH-DT
HL Consolidation Day Analysis of needs from BE-ICS
EU Institution Board 1 representative of each participating institute
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
Physics-based simulation for visual computing applications
Figure 8.1 Architecture of a Simple Computer System.
Down load a youtube video
ILC Main Linac Superconducting Splittable Quadrupole
Shelton School District
Presentation transcript:

PH Theme 3 R&D Introduction Lucie Linssen Meeting with WP leaders 3/11/2008

Overview of WP’s

Materials expenditures Status for 2008, CET summary 31/10/2008 Total 2009 materials budget expected ~40% higher than in 2008 Presently committed ~44% of MCHF planned

Fellows/associates/students Currently trying to get M=>P transfer for more fellows in 2009

Existing staff expenditures 2008

2008, existing staff resourcesForeseen (FTE)Actual (FTE) Microelectronics/optoelectronics46.3 Detectors34.1 Analysis analysis / simulation / computing11.2 Linear collider detectors01.0 Total812.6

Remarks Discussion with the experiments are important to stay in line with the needs and the time-scales of the upgrades ! Be prepared to report on your communication channels indico category for PH Theme 3 work packages Upcoming common R&D in mechanical engineering: – Detector materials (structural and thermal) – Detector cooling – 3D metrology and reverse engineering – Sub-lifting and precise movements of large loads

Next meeting Tuesday 11/11, 14 hrs, room WP2, WP8, WP budget request – New standardised APT format