BizForceOne by MegaSolutionCenter (MSC), USA BIZFORCEONE OPERATING SYSTEM BEST FIT IMPLEMENTATION.

Slides:



Advertisements
Similar presentations
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Advertisements

Get in touch with Microsoft Dynamics Sure Step Saied Alhamwi, PMP Business Application Manager ACWA Holding
November 14, Upgrade Finance 8.4 Upgrade.
Enterprise Resource Planning
Planning for Enterprise Systems
1 Dr. Djamal Ziani SAP Project Management. 2 ASAP Accelerated SAP (ASAP) is SAP's standard implementation methodology. It contains the Roadmap, a step-by-step.
Accelerate BI Presented by: Stephen Goldsmith RapidApp BI Methodology  Agile Project Management, Quality Assurance, Knowledge Transfer  Plan Business.
Panorama Consulting Group LLC ERP Assessment, Selection, and Planning SAMPLE APPROACH.
6.1 Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Building Information Systems Chapter 13 VIDEO CASES Video Case 1: IBM: Business.
University of Southern California Enterprise Wide Information Systems Instructor: Richard W. Vawter.
1 Samples The following slides are provided as samples and references for the Quarterly Reviews Additional slides will be added.
M ERP (Enterprise Resources Planning) M ERP (Enterprise Resources Planning) Session 9 - ERP Implementation Ir. Ekananta Manalif, MM, MKom (D2664)
Eleventh Edition 1 Introduction to Information Systems Essentials for the Internetworked E-Business Enterprise Irwin/McGraw-Hill Copyright © 2002, The.
Unit Five – Transforming Organizations
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
Ashoka Indonesia Implementation Kick-off August 2014
13.1 © 2007 by Prentice Hall 13 Chapter Building Systems.
Enterprise Resource Planning (ERP) Systems
Software projects Management & Development Alireza Saebi
Irwin/McGraw-Hill Copyright © 2000 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS5th Edition.
000000_1 Confidential and proprietary information of Ingram Micro Inc. — Do not distribute or duplicate without Ingram Micro's express written permission.
Release & Deployment ITIL Version 3
IPM Methodology Overview and Fit Gap Prep. 8/17/2015 | 2 | ©2012 Ciber, Inc. Incremental Prototype Methodology IPM is a building block approach divided.
Picture 1 model: ICT lifecycle in a company 1. business needs & business strategy 2. ICT strategy - ICT assessment - ICT strategic plan - ICT implementation/tactical.
N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.
1.Database plan 2.Information systems plan 3.Technology plan 4.Business strategy plan 5.Enterprise analysis Which of the following serves as a road map.
Chapter 14: Redesigning the Organization with Information Systems Instructor: Kevin Brabazon.
Web Development Process Description
Discussion Items with Bruce
System design technique  System Development Life Cycle  Prototyping  Rapid Application Development.
Chapter 10.
Page - 1 Ariba Buyer Upgrade Benefits/Enhancements  Streamlined User Interface  Requisition Function and Company eForms  Increased Performance.
Trade order management system implementation Asset Management division of major US financial institution Provide project management and business analysis.
Laudon & Laudon: Canadian Edition
Satzinger Chp. 2 Part Part 4 of 4 2 Object-Oriented Analysis and Design with the Unified Process Testing Testing is critical discipline Testing activities.
CIS 321—IS Analysis & Design Chapter 4: Analysis— Investigating System Requirements.
Bring Your Business into the 21 st Century : Part 1 WasteExpo 2011 Improving Your Financial Management System.
Systems Development AIMS 2710 R. Nakatsu. Overview Why do IT projects succeed and fail? Two philosophies of systems development –Systems Development Life.
Project Life Cycles.
普 华 永 道 Phase 1: Project Preparation Phase 1: Project Preparation Phase Overview Phase Overview.
Microsoft Office Project 2003: Selling EPM in your Organization Matt Wilson Business Solutions Specialist LMR Solutions.
Project Management Methodology Development Stage.
Implementing SiteManager in a non-P/L/C State Dawn E. Scheel, P.E. TxDOT.
Best Practices for a Successful SaaS Implementation Joseph H. Aston, Oracle Project Lead Velocity Technology Solutions September 18, 2015.
Systems Development AIMS 2710 R. Nakatsu. Overview Two philosophies of systems development –Systems Development Life Cycle (SDLC) –Prototyping Alternative.
Systems Development Life Cycle (SDLC)
Systems Analysis & Design David Walkiewicz March 31, 2012.
Accounting systems design & evaluation 9434SB 18 March 2002.
SAP Methods Context PRM1_02.1 PwC Methods & Risk Management Lesson Objectives Participants will be able to: Understand how methods can mitigate project.
Management Information Systems
Sample Fit-Gap Kick-off
Systems Analysis and Design in a Changing World, 4th Edition
BANKING INFORMATION SYSTEMS
M ERP (Enterprise Resources Planning)
Project Management Lifecycle Phases
Developing Information Systems
Description of Revision
مراحل پیاده سازی راه حل برنامه ریزی منابع سازمان ERP Implementation
CLINICAL INFORMATION SYSTEM
Software Development Process
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
INFORMATION SYSTEMS PLAN
MANAGING THE DEVELOPMENT AND PURCHASE OF INFORMATION SYSTEMS
Executives & Management
Rollout Guide Day 1 to 10 Day 11 to 20 Day 21 to 30 Day 31 to 40
Chapter 13 Building Systems.
Executive Project Kickoff
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

BizForceOne by MegaSolutionCenter (MSC), USA BIZFORCEONE OPERATING SYSTEM BEST FIT IMPLEMENTATION

IDO METHODOLOGY 2  BFO Applied Methodology  1. Initiation  2. Deployment  3. Operation and Upgrade SCF (Supply Chain Workflow) FCF (Financial Cash Flow HRF (Human Resource Flow)

BIZFORCEONE REQUIRMENT 1 Project FS 1.1 Budget 1.2 Objectives (Project scope) SCM Operation workflow (SCM) FCM Financial & Cash flow HRM Human Resource workflow 1.3 Time duration 1.4 Resource Project manager (Pilot) Workflow Competence & Information system overview Key users Workflow Competence of the objectives IT Information technology insfrastructure, SQL, VB 3

4 BizForceOne Operating System Implementation Initiation Deployment Operation & Upgrade

PROJECT REQUIREMENTS  Evaluate new system budget  Analyze the company strategy and validate project  Evaluate current situation from process, system, technology and organizational view  Define objectives and project scope  Define project structure and high level planning for selection process 5

REQUIREMENT OUTPUTS (FS)  Link current and future projects in planning  Consider existing systems viability and integration  Plan reengineering approach and fit Big R - Perform first, then work into selection criteria Little R - Include high level future functionality desired into selection criteria, develop detail processes around package capabilities  Perform a cost/benefit analysis  Validate the feasibility study report across the organization  Assemble cross functional project team 6

INITIATION MAIN TASKS 7 Plan –Confirm project scope and objectives –Establish project team structure and refine staffing plan –Develop implementation strategy –Review technical infrastructure –Develop detailed analysis stage workplan and high level project plan Analysis –Conduct and document “As Is” and “To Be” sessions –Perform Functional Gap Analysis and identify customizations –Develop conversion and interface strategy –Establish development and sandbox instances –Develop technical infrastructure requirements –Develop detailed design stage workplan

INITIATION OUTPUTS  Project Scope  Reengineering Strategy  Workflow selection Plan  Feasibility Study Report 8

9 Develop prototype and conduct Conference Room Pilot Conduct data mapping sessions Define Detail Design Specifications for custom objects Define Security Strategy Design technical infrastructure Define and implement testing and training environments Prepare detailed construction workplan DEPLOYMENT MAIN TASKS

10 Construct and unit test applications and customizations Develop system and integration test plans Conduct system, integration, and volume testing Perform acceptance testing Construct application security Design and develop procedures and training materials Review system capacity and refine technical infrastructure Develop cutover plan Approve/conduct final review of system

OPERATION & UPGRADE MAIN TASKS 11 Conduct training Migrate programs and security profiles to production Execute conversion programs and cutover plan Post-implementation