For discussion purposes. No implementation assurances Interconnect Links and Congruent Call pricing Robin Charles, Clive Feather and Ian Self The information.

Slides:



Advertisements
Similar presentations
January 23-26, 2007 Ft. Lauderdale, Florida VoIP Conversation Recording Methods and Applications Andrew Blakely.
Advertisements

BTs Plans for its NGN EU Open Workshop on NGN Policy and Regulatory Issues 22 June 2005 Ittai Hershman Director, 21CN Commercial Development BT Wholesale.
1 Introducing the Specifications of the Metro Ethernet Forum.
1 Introducing the Specifications of the Metro Ethernet Forum.
Element Based Charging (EBC) used within both BT Basic and BT Transit Telephony Element Based Charging uses switch related elements for charging. This.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Implement Inter- VLAN Routing LAN Switching and Wireless – Chapter 6.
Sonus SBC1000, SBC 2000 Competitive Positioning
1G MSIL SFOA1 Trial Update Week Ending: 04 April 2008.
© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—4-1 Designing Cisco Unity Bridge and Avaya Migrating Voice Mail to Unified Messaging and Interoperability.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect & Portfolio Working Group NGN Interconnect - PSTN Emulation Blended Rate.
Always consult the current Carrier Price List. Examples based on 10 March 2010 Price List Uncontrolled when downloaded
Broadband Product Road Map 2012/13 H2 2013/14 H1 2013/14 H2 20C Fibre 21C Migration from 20C IPstream to 21C Wholesale Broadband Connect Release AK 17.
RadioRing TM ISO 9002 Proprietary and Confidential - RadioTel Ltd. 1 RONY LEVY CEO & PRESIDENT RadioTel Wireless Communication.
FCD-155_2012 Slide 1 FCD-155. FCD-155_2012 Slide 2 FCD-155 STM-1/OC-3 Terminal Compact (1U ½ 19”) Next Generation standard STM-1/OC-3 Terminal supporting.
Thank you.
Data Link Layer Switching
Voice over Internet Protocol (VoIP) Training and Development.
TDC 461: Wide Area Network Services DePaul University 22 May, 2001.
Data Centers and IP PBXs LAN Structures Private Clouds IP PBX Architecture IP PBX Hosting.
Mr. Mark Welton.  Three-tiered Architecture  Collapsed core – no distribution  Collapsed core – no distribution or access.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
1 Introducing the Specifications of the Metro Ethernet Forum.
Click to edit Master title style TDM Access & TDM Backhaul PPC Forum June 12 th 2008 Ian Boothman Spyros Christou.
Protocols and the TCP/IP Suite Chapter 4. Multilayer communication. A series of layers, each built upon the one below it. The purpose of each layer is.
21CN Network Inventory Service Availability & Network Inventory Datasets 15 th September 2009 Paul Reed Owen Gardner Peter Davis.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect Working Group NGN Interconnect - PSTN Emulation Technical Consultation.
Going faster and staying in control - Building the world’s biggest NGN Tim Hubbard Head of Technology Futures.
PART 2: Product Line. Tenor Switches & Gateways Tenor AX Series Solution For Medium to Large Enterprises  Available in 8, 16, 24 and 48 port Available.
I&P: Contracts Clinic 24/02/06 1 Minutes Table Derivation & Application of Overflow The focus of the presentation is on principles: How it works how we.
NGN Multi-Service Interconnect Link (NGN-MSIL) Robin Charles.
Issue 3.2 (1 st June 2012)Author: Zack Thompson1 NCC Carrier Price List (CPL) Guidance Slides CONVEYANCE TELEPHONY These slides are provided as a ‘rough.
BT IPStream Products James Appleton 01/09/ BT IPStream Portfolio IP switch Content Provider Corporate High speed IP infrastructure with DSL access.
Surftime Industry Forum 21/12/99. OFTEL Internet Forum BT SurfTime BT Announcement on 7 December Possibilities from new Network Approach NTS remains for.
Eclipse HX System Networking Eclipse HX Matrices.
NGN Interconnect Update JOINING THE THREADS 25 May 2005 FOR WG DISCUSSION ON 3 JUNE.
The University of Bolton School of Games Computing & Creative Technologies LCT2516 Network Architecture CCNA Exploration LAN Switching and Wireless Chapter.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Introduction to 21CN Resilience Tim Hubbard Head of 21CN Solutions Strategy.
21CN Legacy Interconnection Working Group 17 th December 2004 Auditorium City Place, Gatwick.
DELIVERING BT’S 21 ST CENTURY NETWORK INDUSTRY WORKING GROUP ON MSAN ACCESS & INTERCONNECTION 22 October 2004.
Multi-Service IP Interconnect 6 th May Multi-Service IP Interconnect A Multi-Service Interconnect Link to support PPCs PSTN/ISDN DataStream Multi-Media.
BT Wholesale TDM Circuit Strategy “Evolution rather than revolution” Consult 21 – Industry Webcall 29 th January 2009.
Chapter 7 Backbone Network. Announcements and Outline Announcements Outline Backbone Network Components  Switches, Routers, Gateways Backbone Network.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
1 Consult21 webcall – BT Wholesale Service availability data (Datasets) Peter Davis, BT Design Bill du Cann, BT Consult21.
1 FRIACO OFTEL INTERNET FORUM - 11 December 2000 Geoff Brighton JanWillem van den Bos.
Consult 21 Interconnect Working Group 7 Nov 2005 Ian Self Virtual Interconnect Capacity Product Outline The information in this presentation relates to.
CONSULT 21 Broadband and LLU Working Group BROADBAND AND LLU PRODUCTS - MIGRATION TO 21CN Ynyr Roberts BTW 16 th June 2005.
Business unit (if required) business unit (if required) SDH Serving Nodes Determination at the Point of Handover.
Virtual Local Area Networks (VLANs) Part II
Regulation of NGN New Approaches to Interconnection John Horrocks ECC TRIS Chairman, Consultant to DTI
MSIL TECHNICAL CONSULTATION 28 February 2006 Steve Wright The information in this presentation relates to plans currently under development and subject.
Consult21 Industry Input FAS INTERCONNECT A request from Industry as input to the Consult21 BB/LLU Working Group.
MSIL Discussion with Industry Steve Wright/Doug Harrison 11 th January Issue 1.
Pathfinder Working Group BT Centre Showcase, Registration: 9.45 am Start time: am.
11 ROUTING IP Chapter 3. Chapter 3: ROUTING IP2 CHAPTER INTRODUCTION  Understand the function of a router.  Understand the structure of a routing table.
Consult21 PC/PPC WG update John Lee, Energis Industry Co-chair 16 May 2005.
INTERCONNECT WORKING GROUP 28 JANUARY 2005 BT’s Thinking about Next Generation Interconnect in 21CN DARYL DUNBAR HEAD OF 21CN CUSTOMER SOLUTIONS The information.
1G and 10G MSIL SFOA1 Trial Updates Week Ending: 13 June 2008 Beatrice Osborn Product Development, BT Design.
Tim Wright BT’s 21st century network TRIS - TISPAN WG4 workshop on NGN Interconnection and Numbering Copenhagen 18 January CN Principal Consultant.
Chapter-1 LAN Design. Introduction Hierarchical network When building a LAN that satisfies the needs of a small- or medium-sized business, your plan.
ETSI/TRIS Workshop on NGN Interconnection Effects of incumbent migration to NGN on competing networks Paul Rosbotham 18 th January 2006.
Chapter 4 Data Link Layer Switching
Implement Inter-VLAN Routing
PPPoE Internet Point to Point Protocol over Ethernet
Network layer devices combine multiple broadcast domains
Implement Inter-VLAN Routing
Implement Inter-VLAN Routing
Implement Inter-VLAN Routing
NCC Carrier Price List (CPL) Guidance Slides
Presentation transcript:

For discussion purposes. No implementation assurances Interconnect Links and Congruent Call pricing Robin Charles, Clive Feather and Ian Self The information in this presentation relates to plans currently under development and subject to consultation, and may be subject to change. Detailed implementation depends upon a number of factors including the capabilities of suppliers and the final 21CN network design. Consult 21 Interconnect Working Group 20 th January 2006

For discussion purposes. No implementation assurances MSIL MSIL goes no further than NTE/Facility Mux on BT Site Rental Price based on technology, line system speed (+distance for CSH) One off connection charge Configuration charges for setting up/configuring VLANs SDH Facility Mux charges included in MSIL Service-specific VLAN charges not included in MSIL price Ethernet VLANs Fibre MSAN Could be located at Metro Node Customer sited NTE In-span Fibre join IP Border Gateway 21CN Core MSIL - ISHMSIL System terminated on Customer Site End User LinePSTN Conveyance CMSANCMSAN Metro Node

For discussion purposes. No implementation assurances Fibre MSAN Congruent Call Pricing for PSTN Emulation (PATS/SIP-I): Customer sited NTE In-span Fibre join IP Border Gateway 21CN Core MSIL - ISHMSIL System terminated on Customer Site End User LinePSTN Conveyance (Currently IBC/IEC/ppm) Call conveyance split between VLAN and Call charges. 3 Options for VLAN/Call charge Boundary (VCB) VCB must be identifiable by call server and recorded in CDR CMSANCMSAN Fibre MSAN? Boarder Gateway? Virtual Legacy Switch?

For discussion purposes. No implementation assurances Clive’s Matrix Asks about different legacy switches Asks about IECs and long lined switches Asks about capacity rental to Metronodes Answers depend on location of VLAN / Call Boundary  i.e. where are calls charged from

For discussion purposes. No implementation assurances Clive Feather Matrix

For discussion purposes. No implementation assurances Congruent Call charges - Simple Option A VLAN / Call Boundary at IP boarder gateway (Metronode sites) Calls charged between Border Gateway and CMSAN based on NCC Cheapest Legacy EBC charge from Metronode site to CMSAN site  Ignores legacy switch types  LES rate to all lines formerly parented on any DLEs located at Handover site  ST rate to lines on VDLEs parented on any tandem at Handover site No VLAN distance charges if handover at Metronode site  FMSAN co-located with IP Border gateway Option for VLANs from remote FMSANs at existing POH Customer sited NTE Fibre MSAN In-span Fibre join IP Border Gateway 21CN Core CMSANCMSAN

For discussion purposes. No implementation assurances Congruent Call charges - Simple Option B VLAN / Call Boundary at Fibre MSAN gateway Calls charged between FMSAN and CMSAN based on NCC Cheapest Legacy EBC charge from FMSAN site to CMSAN site  Ignores legacy switch types  LES rate to all lines formerly parented on any DLEs located at Handover site  ST rate to lines on VDLEs parented on any tandem at Handover site  De-regulated Tandem to other destinations No VLAN distance charges All calls still routed via Metronode – charge model would change when congruent pricing ceases Customer sited NTE Fibre MSAN In-span Fibre join IP Border Gateway 21CN Core CMSANCMSAN

For discussion purposes. No implementation assurances Congruent Call charges - Option C VLAN / Call Boundary at Virtual Legacy Switch No design specified – feasibility not established Requires call server to put VLAN ID in CDR VLAN Distance charge to Location of Virtual Legacy Switch EBC charge band from specific legacy switch to CMSAN Separate VLANs for each virtual legacy switch – more than one per site. Customer sited NTE Fibre MSAN In-span Fibre join IP Border Gateway 21CN Core CMSANCMSAN

For discussion purposes. No implementation assurances End