1 12/17/2009 PHENIX WEEKLY PLANNING 12/17/2009 Don Lynch.

Slides:



Advertisements
Similar presentations
4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
Advertisements

1 12/3/2009 PHENIX WEEKLY PLANNING 12/3/2009 Don Lynch.
1 2/11/2010 PHENIX WEEKLY PLANNING 2/11/2010 Don Lynch.
1/12/20121 PHENIX WEEKLY PLANNING 1/12/2012 Don Lynch.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
1 4/7/2011 PHENIX WEEKLY PLANNING 4/7/2011 Don Lynch.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
1 3/12/2009 PHENIX WEEKLY PLANNING 3/12/2009 Don Lynch.
1 2/12/2009 PHENIX WEEKLY PLANNING 2/12/2009 Don Lynch.
1 12/10/2009 PHENIX WEEKLY PLANNING 12/10/2009 Don Lynch.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
1 3/5/2009 PHENIX WEEKLY PLANNING 3/05/2009 Don Lynch.
1 4/2/2009 PHENIX WEEKLY PLANNING 4/2/2009 Don Lynch.
1 1/27/2011 PHENIX WEEKLY PLANNING 1/27/2011 Don Lynch No Meeting Today Lab Closed due to 2011 Snow Storm # 7.
1 3/3/2011 PHENIX WEEKLY PLANNING 3/3/2011 Don Lynch.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
5/5/11 1 PHENIX WEEKLY PLANNING 5/5/2011 Don Lynch.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 11/5/2009 PHENIX WEEKLY PLANNING 11/5/2009 Don Lynch.
1 12/09/2010 PHENIX WEEKLY PLANNING 12/09/2010 Don Lynch.
1 2/26/2009 PHENIX WEEKLY PLANNING 2/26/2009 Don Lynch.
1 11/12/2009 PHENIX WEEKLY PLANNING 11/12/2009 Don Lynch.
1 3/4/2010 PHENIX WEEKLY PLANNING 3/4/2010 Don Lynch.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
1 3/24/2011 PHENIX WEEKLY PLANNING 3/24/2011 Don Lynch.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
2/14/20131 PHENIX WEEKLY PLANNING 2/14/2013 Don Lynch.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
5/16/ PHENIX WEEKLY PLANNING 5/16/2013 Don Lynch.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
1 10/15/2009 PHENIX WEEKLY PLANNING 10/15/2009 Don Lynch.
5/12/11 1 PHENIX WEEKLY PLANNING 5/12/2011 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
1 12/02/2010 PHENIX WEEKLY PLANNING 12/02/2010 Don Lynch.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Technical Support /15/08 PHENIX WEEKLY PLANNING 5/15/2008 Don Lynch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
1 1/20/2011 PHENIX WEEKLY PLANNING 1/20/2011 Don Lynch.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
1 3/31/2011 PHENIX WEEKLY PLANNING 3/31/2011 Don Lynch.
12/20/20121 PHENIX WEEKLY PLANNING 12/20/12 Don Lynch.
1 2/25/2010 PHENIX WEEKLY PLANNING 2/25/2010 Don Lynch.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/31/2009 Don Lynch.
1 1/28/2010 PHENIX WEEKLY PLANNING 1/28/2010 Don Lynch.
1 2/18/2010 PHENIX WEEKLY PLANNING 2/18/2010 Don Lynch.
1 1/14/2010 PHENIX WEEKLY PLANNING 1/14/2010 Don Lynch.
PHENIX WEEKLY PLANNING 5/3/2007 Don Lynch. 5/3/2007 Weekly Planning Meeting 2 Schedule HyTec CM vibration modes test5/23/07 End of Run Party 6/29/07 Next.
1 5/19/2011 PHENIX WEEKLY PLANNING 5/19/2011 Don Lynch.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
1 11/19/2009 PHENIX WEEKLY PLANNING 11/19/2009 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
12/08/20111 PHENIX WEEKLY PLANNING 12/08/2011 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 2/4/2010 PHENIX WEEKLY PLANNING 2/4/2010 Don Lynch.
Presentation transcript:

1 12/17/2009 PHENIX WEEKLY PLANNING 12/17/2009 Don Lynch

2 12/17/2009 Install rack components in RPC3 N racksin progress12/30 Attach cables to RPC3 N racks and to Detector ½ octantsin progress12/30 Install heaters and thermostat(s) for RPC3N thermal controlin progress12/30 AH Crane 110 switch for lockoutIn Progress? Send mass flowmeters out for recalibration (DC/PC, MuID, TOF.W)In Progress12/31 Ongoing Tasks for Run 10 Task Start Date End Date Item Responsibility Status Item 1: ESRC relevant items completed Wood StairsPhillipsPost Start Update Work proceduresCirnigliaro,LynchPost Start Item 2: Bypass Switch Arc LabelGiannottiPost Start Item 3: Storage Area lighting/signageLynchPost Start Item 4: HBD Mock UpLynchPost Start Item 11: Fire Pull BoxPhilipsPost Start Item 12: Dumb WaiterLynchPost Start PHENIX Startup Checklist Status

3 12/17/2009 This Week VTX Project Planning Meeting RPC3 North review/RPC3 South kickoff meeting MuTr water leak (fixed) RPC Factory Gas Alarm Run 10 Continues

4 12/17/2009 VTX Major Procurement Items and Tasks: Be Beampipe (Brush Wellman) Inner BP Transitions, Outer BP Transitions & BP Spool (CS Outsource) Beampipe Installation Plan NEG Coating of all BP parts (CERN) BP Supports (PHENIX) Assembled VTX Barrel ½’s (BNL/LANL PHENIX) Chiller (TBD) VTX support structure (PHENIX) Electronics (PHENIX) Racks (PHENIX)

5 12/17/2009 South 1-5/8” to 3” transition North 1-5/8” to 3” transition 3 new beampipe sections Alum/SS/Be central section Existing bellows and componments south of here Existing bellows and componments north of here

6 12/17/2009 permanent rolling supports existing permanent fixed support Run time removable support (adjustable for survey positioning) Beampipe supports

7 12/17/ DOF (Y & Z) 1 DOF (Z) 0 DOF Kinematic mounts for mating east and west detector halves 6 interface points w/ HYTEC Installation

8 12/17/2009 RPC3 North and South Review Meeting Discuss challenges of RPC3 South Discuss Lessons learned from RPC3 North Review all related drawings (53 drawings) 33 OK as is 14 need minor modifications 5 complete redesign 1 obsolete Review overall schedule Preparations during run 10 Site Preparation Installation

9 12/17/2009 Next Week Short Week (1-1/2 day Christmas Holiday Thursday – Friday) No scheduled maintenance days, 1st maintenance day ?? RPC factory support VTX/RPC3 South engineering/design and planning RPC3 North electronics and environmental controls/monitoring as access becomes avaiable Technical support for run 10 as required

10 12/17/2009 Roof leaks in utility bathroom at northwest corner behind tech offices, over door between rack room and assembly hall and over door between control room and elect. ass’y room. Heat wrap tape for trailer bathroom toilet drains to prevent freeze/clogging in winter. General maintenance for Trailer Offices and Gas Mixing House stairs, ramps and siding, gutters, etc. (cleaning and repairing worn/rotted wood): Carter has placed work orders 2009 Building Maintenance Issues

11 12/17/2009 Run 10In progress6/1 VTX Fabrication and Installation Plan (1st Draft)Done RPC3 South Fabrication and Installation Plan (1 st Draft)Done Receive New BeampipeOn Order1/31 Design Beam pipe supportsIn progress12/31 Update RPC3 N design for RPC3 SIn progress12/31 Design support structure, alignment scheme for VTXIn progress1/31 Start of Run PartyDone Fabricate beam pipe supports1/14/1 Beampipe NEG coating (CERN)2/15/1 Fabricate/procure parts for RPC3 S installation1/14/1 Fabricate/procure parts for VTX installation2/15/1 End of run 106/1 Prep IR for shutdown6/17/1 Complete unfinished business for MuTrgr FEE & RPC3 North6/18/1 Install Beam pipe7/110/1 Install VTX8/110/1 Install RPC3 South6/110/1 Run 10 and shutdown 2010 Tasks Start Date End Date

12 12/17/ PHENIX Procedure Review Current Status: 147 Procedures Identified 80 Made Inactive (not currently in use, will require revision to re- activate if and when necessary, available for reference purposes) 12 CAD procedures relevant to PHENIX, all are current and up-to- date. All currently under review, 3 to be de-activated 40 PHENIX approved procedures. 4 are currently under review 36 are current and up-to-date 15 Proposed/Draft Procedures (never previously formalized)

13 12/17/2009 Safety, Security, etc. 1.Ring is posted as a controlled area. Unescorted access requires GERT and facility specific training (CA-access training and PHENIX Awareness). All PHENIX collaborators should have this training. Guests who do not have this training must (a) be escorted by a person qualified for unescorted access, (b) must complete a training waiver form (available on-line via PHENIX internal web page under “Training” link 2.Nuclear and Particle Physics Directorate all hands meeting Monday Dec. 21 at 11:00 AM in Berkner Hall. 3.Gas alarm at RPC Factory: all systems worked properly, all RPC personnel responded appropriately. (Referred to by CAD safety as “an interesting event”, and is being treated as an “SC BNL Management Concern”. 4.Holidays next week: be careful, be safe and be happy.

14 12/17/2009 Where To Find PHENIX Engineering Info Links for the weekly planning meeting slides, archives of past meeting slides,long term planning, pictures, videos and other technical info can be found on the PHENIX Engineering web site: No Meeting Next Week – Christmas Holiday