LOLEv Methodology Details GATF April 5, 2013. 2 Calculation of the Target Reserve Margin in the LOLEv study The reserve margin is calculated by the following.

Slides:



Advertisements
Similar presentations
1 Demand-Side Management Influence on Reliability NERC Demand-Side Management Task Force (DSMTF) Rick Voytas, Chair November 2007 Presented To The U.S.
Advertisements

Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
06/04/2009 TAC 2009 Long-term Demand and Energy Forecast (LTDEF) and Capacity, Demand and Reserves (CDR) Calculation Dan Woodfin Director, System Planning.
Capacity Valuation.
Generation Adequacy Task Force Results of the 2012 Loss of Load Study January 18, 2013.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
IMO 18-Month Outlook Presentation to the F&ASC June 25, 2003.
Forecasts and Assessments Presented to the Independent Power Producers’ Society of Ontario Pat Doran, Supervising Technical Officer Independent Electricity.
ERCOT Load Forecast and Reserve Margin Update June 2, ERCOT Load Forecast and Reserve Margin Update June 2, 2005.
NERC LTRA Update / CDR Capacity Counting Issues
Marginal Distribution System (and Transmission System) Losses Regional Technical Forum August 5, 2008.
EE 590 Reliability (LOLE) Evaluation for Generation & Transmission Adequacy Brandon Heath October 27 th 2008.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
California SONGS\OTC Plants Assumptions TEPPC – Data Work Group Call Tuesday, September 15, 2015.
Climate Change and The NW Power Supply Climate Impacts on the Pacific Northwest University of Washington April 21, 2009.
1 18-Month Outlook October March 2005 Presented by Greg Hine IMO Long-Term Forecasts and Assessments.
ERCOT Long-Term Demand and Energy Forecasting February 20, 2007 Bill Bojorquez.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
Generation Adequacy Task Force Update to WMS September 14, 2011.
Wind ELCC Calculation Comparisons and ERCOT’s NERC LTRA Capacity Forecasts GATF Meeting, June 24, 2014.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
ERCOT Planning October 2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System - Methodology.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
May 31, Resource Adequacy Capacity Standard Resource Adequacy Forum Technical Committee May 31, 2006 Background Image: Bennett, Christian Science.
Resource Adequacy Technical Committee Meeting April 6, 2011.
Generation Adequacy Task Force Update to WMS November 18, 2009.
EFFECTIVE LOAD CARRYING CAPABILITY FOR WIND-POWER.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Moving toward a Final Resource Adequacy Standard Resource Adequacy Forum Steering Committee Meeting September 27, 2007.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
Summary of Astrapé Reserve Margin Impact Analysis for the PUCT Pete Warnken WMS February 4, 2015.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Steering Committee Meeting April 13, 2007.
CALIFORNIA ENERGY COMMISSION Workshop on the Staff Draft 2006 Summer Outlook Report December 8, 2005 Hearing Room B.
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
1 WMS Report TO TAC April 2007 (which is in March)
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
2006 Report on the Capacity, Demand, & Resources for the ERCOT Region Technical Advisory Committee June 1, 2006 Kenneth A. Donohoo. P.E. Manager, Transmission.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
2006 CDR Status Report Technical Advisory Committee May 4, 2006 Bill Bojorquez.
ERCOT PUBLIC 3/25/ RTP Inputs and Assumptions March 25, 2014.
Probabilistic Approach to Resource Adequacy Resource Adequacy Forum Technical Committee Meeting Portland, OR January 23, 2009.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
Generation Adequacy Task Force Meeting April 10, 2014.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
Defining LOLP Resource Adequacy Forum Technical Subcommittee Meeting November 14, 2008.
2010 Northwest Regional Forecast Resource Adequacy Technical Committee April 22, 2010.
GATF Loss of Load Process (or How to Make Sausage) October, 2012.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM Regulatory Affairs Net Load Peak ELCC Draft Results / Work.
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
ERCOT 2011 Five-Year Transmission Plan Update
Generation Adequacy Task Force Update to WMS
Additional clarifications on economic and adequacy running hours
Jose GONZALEZ PASTOR Economic & Adequacy Analyst - Elia
Resource Adequacy Assessment for 2015 Interim Results Resource Adequacy Forum Technical Committee Meeting July 28, 2010.
NERC 2010 Scenario 1 (Economic) Data Presentation Concept Slides (with 2008 demand project out to 2018 for forward 10 years data) extrapolated demand values.
2021 Adequacy Assessment Status Report
Capacity Analysis in the Sixth Plan
Planning Reserve Margin
Presentation transcript:

LOLEv Methodology Details GATF April 5, 2013

2 Calculation of the Target Reserve Margin in the LOLEv study The reserve margin is calculated by the following equation: Reserve Margin = (Resources - Median Scenario Peak Load) / Median Scenario Peak Load »where, Resources = (NonWind_Capacity + _ × __+_ × __) For the calculation of the 16.1% Target Reserve Margin: –Non-Wind capacity is 84,928 MW. –ELCC Coastal is 32.9% with Coastal Wind capacity of 1,915.5 MW. –ELCC Non-Coastal is 14.2% with Non-Coastal Wind capacity of 10,339.5 MW. Median Scenario Peak Load is the 2006 Weather Year Peak Load. –2006 Weather Year Peak Load is 74,928 MW. –Why 2006? This year is the best representation of the load forecast in the Capacity, Demand, and Reserves (CDR) report. The calculation of all components is detailed in this presentation. April 5, 2013

3 Background Information Three cases were run in the analysis: –“Base Run” –“Base Run without Non-Coastal Wind” –“Base Run without Coastal Wind” The level of Non-Wind capacity is set by the weighted average loss of load events per year (LOLEv) for each case. –Weights are the likelihood probabilities for each weather year based on NOAA data. –Explained prior at Generation Adequacy Task Force (GATF) ( f_Load_Study_2013_GATF.ppt) on slide 24 of the linked presentation. f_Load_Study_2013_GATF.ppt April 5, 2013

4 “Base Run” Results For each weather year, the LOLEv values in the table below represent the average number of events resulting from 400 simulation iterations associated with varying levels of non-wind resource capacity (first column). For example, the LOLEv value of events/year (in red) results from 78,471 MW of non- wind capacity (in blue) being included in the model. For the “Base Run”, non-wind capacity needed to achieve 0.1 events/year LOLEv is 84,928 MW, interpolated from 84,535 MW and 86,535 MW (in orange). April 5, 2013

5 “Base Run without Non-Coastal Wind” Results For the “Base Run without Non-Coastal Wind”, non-wind capacity needed to achieve 0.1 events/year LOLEv is 86,396 MW (1,468 MW higher than Base Run), interpolated from 84,535 MW and 86,535 MW in the table below (in orange). April 5, 2013

6 “Base Run without Coastal Wind” Results For the “Base Run without Coastal Wind”, non-wind capacity needed to achieve 0.1 LOLEv is 85,558 MW (630 MW higher than Base Run), interpolated from 84,535 MW and 86,535 MW in the table below (in orange). April 5, 2013

7 ELCC Calculation Non-Coastal ELCC –Level of Non-Wind Generation from “Base Run” at point where LOLEv is 0.1 is 84,928 MW (from Slide 4). –Pull out 10,339.5 MW of Non-Coastal Wind. –Level of Non-Wind Generation from “Base Run without Non-Coastal wind” at point where LOLEv is 0.1 is 86,396 MW (from Slide 5). –ELCC of Non-Coastal Wind is (86,396 – 84,928) / 10,339.5, or 14.2%. Coastal ELCC –Level of Non-Wind Generation from “Base Run” at point where LOLEv is 0.1 is 84,928 MW (from Slide 4). –Pull out 1,915.5 MW of Coastal Wind. –Level of Non-Wind Generation from “Base Run without Coastal wind” at point where LOLEv is 0.1 is 85,558 MW (from Slide 6). –ELCC of Non-Coastal Wind is (85,558 – 84,928) / 1,915.5, or 32.9%. April 5, 2013

8 QUESTIONS / COMMENTS??? April 5, 2013