Chiho Wang ATLAS TRT Duke University CERN, Feb. 2004 1 Fuse Box & Capacitor Status Chiho Wang Duke University.

Slides:



Advertisements
Similar presentations
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Advertisements

CricketSat Receiver Assembly Instructions This is the instruction slides for the assembly of a receiver board. It would be a good idea to review soldering.
Chiho Wang ATLAS TRT Duke University Hampton, May Xe-CO 2 Stability Chiho Wang Duke University.
MULTIPIN CONNECTOR CONNECTION RADIALL P/N Receptacle for cable and for 52 socket contacts A1932AP RADIALL P/N Plug for cable and for.
ALICE TPC field cage status Sardinia May 2004 Michael Hoch Cern-TA2.
Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Module Gas Leak Chiho Wang Duke University.
1 Student Hands On Training I (2009) Soldering 101.
BaBar/LST Meeting Dec 8, 2003K. Honscheid, Ohio State University Module Assembly Quality Control High Voltage Ohio State Status Report.
Summary of Fuse Testing for Barrel Module Fuse Boxes Duke University Jack Fowler.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN HV capacitor Testing.
1 (1D Scanner) Trouble Shooting Guide Version 1.0 ©2012.
MuTr Recap Status and Plan. Plan We are shooting for North Station-1 for post Run10 shutdown installation. Best scenario is to mount portable “clamp”
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
Seog Oh/ Duke University/September, 2003 TRT Workshop/ Peniscola, Spain Duke TRT Progress.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Chiho Wang TRD Conference Duke University Bari, Sep Design and Construction of the ATLAS Barrel TRT Chiho Wang Duke University.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
Setting up the Ricoh C305 Press F5 to start the Presentation
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Pixel/IBL status and plans A.Rozanov A.Rozanov ATLAS-France
ATLAS TRT Barrel Design Review, 1998 Barrel TRT Electronics Cooling Chiho Wang Duke University.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
Bakelite surface vs Gap production Evaluation of First samples sent back from Korea Tests and QC of panels presently in GT Evaluation of second set of.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
Twisted Pair Cable A.Nomerotski 12/12/02  Dense assembly (OD 5-7 mm) with u Twisted pairs : total 21; 44-pin mm dual row Omnetics connector s differential.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
HV boards 1.FIRST ASDBLR HV PROTO BOARD: leakage currents on 100nA CH, humidity at cern. 2. TRIAL 1 Encapsulate caps in Printed Circuit Board C schock,
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
ATLAS TRT Duke University CERN, Feb Barrel Capacitors  With socket and bent pin, forms capacitor assembly  Duke supplies capacitors, Hampton assembles.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Test of the cleaning gas mixtures.
1 Sasha Milov DC meeting Sept 12, 2007 HBD status Sasha Milov Sept 12, 2007.
8/September/2008Calo Running and Operation Meeting 1 SPD running and operation: progress report and plans Calo running and operation meeting – CERN 8 th.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
Chiho Wang ATLAS TRT Duke University IU, Oct Fuse Box Design & Mounting Chiho Wang Duke University.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Belle-II iTOP HVB Status SLIDE FOR INCLUSION IN GARY’S PRESENTATION Belle II General Meeting Gerard Visser Indiana University CEEM 11/13/2012.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Fuse Boxes Chiho Wang Duke University.
Chiho Wang ATLAS TRT Barrel Duke University U. Penn. Workshop, 2000 Module Thermal Analysis Chiho Wang Duke University.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Chiho Wang Technical Training Duke University May, Stringing 101 Chiho Wang Duke University.
Chiho Wang ATLAS TRT Duke University CERN, Feb Gas-Flow Measurements Chiho Wang Duke University.
SeaPerch Electrical System. Electrical System Overview Assemble the control box. Make the Cat5 connector. Wire the motors to the tether. Wire the control.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Cluster Status & Plans Cluster Status & Plans —— Gang Qin Jan
TRT HV System status and plans for LS1 LPI Moscow, K. Zhukov.
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
The EC-front development plan and planning S. Ahmad, P. Barrillon, D. Cuisy, S. Dagoret, P. Dinaucourt, R. Sliwa, JL. Socha EC design review – LAL – 1.
Progress on resistor failure diagnosis Ben J ( + Matt, Zander)
SeaPerch Electrical System
Summary of Fuse Testing for Barrel Module Fuse Boxes
Robot Electronics.
Barrel TRT Module Cooling
Some proposals on HV circuits realization for segmented straw detector
Summary of Fuse Testing for Barrel Module Fuse Boxes
LPI Moscow, K. Zhukov, MEPhI-LPI Moscow, V. Kantserov
Capacitor Assembly K. McFarlane 9/30/02 9/30/2002 TRT meeting Oct 2002
Electricity Module 13.
HV capacitor Testing.
SeaPerch Electrical System
Presentation transcript:

Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box & Capacitor Status Chiho Wang Duke University

Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status  Producing for 36 modules of each type  All machined parts in hand  All spring contacts, capacitors, resistors (filter ckt) soldered.  Fuse soldering in progress u Type 1: done. u Type 3: 10 done. u Just received (3 rd batch) 853 fuses – processing (4300 fuses + spare remaining)  Subsequent processes: u Attach HV wiring & cables u Attach HV connector at end of cable u HV test u HV continuity check  Limiting process: Fuse availability.

Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse boxes with fuses

Chiho Wang ATLAS TRT Duke University CERN, Feb Capacitors Status  17,000 capacitors w/ bent pins & sockets made u Enough for 37 module of each type + 10% spare  Going through HV test u 2,000 per batch, on 2,750V for 10 days u ~0.2% failure rate, mostly occurred instantly or within hours. u 6 th batch being processed  Hysol coating after HV test u 1 hour to coat. Cure overnight u 2 days cleaning & socket training (w/ 0.019” pin) u 5 batches coated u 3 batches cleaned and shipped to CERN  Limiting process: HV test

Chiho Wang ATLAS TRT Duke University CERN, Feb Capacitor testing & coating  Capacitor HV test u 2000 at a time  Hysol coating u Chained into 50/ring u Dipped in 50% toluene diluted Hysol u Let cure overnight then detach & clean