ESAC R EVIEW OF THE HIGH FIELD DIPOLE DESIGN R EACTION O VEN, S PLICING AND IMPREGNATION M ARCH 2012 FOR E U CARD-WP7-HFM J.C. Perez on behalf of SMC collaboration.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

Mikko Karppinen Nb3Sn Coil Production for 11 T Dipole Model Magnets.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
EuCARD’13, Progress--HFM, 11 th June 2013, GdR 1 Progress in EuCARD and plans for EuCARD2 Gijs de Rijk 11 th June 2013 CERN.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot, X. Sarasola
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola January 29, 2014.
SMC Plans for new SMCs for Fresca2 program J.C. Perez EUCARD-WP7-HFM Short Model Coil review 12 December 2011.
Eucard-WP7-HFM 10 th Collaboration Meeting at LASA Milano Status on SMC & RMC Models J.C Perez on behalf of SMC/RMC collaboration team.
FReSCa2 Technical Review, 9 th June 2015, CEA Saclay FReSCa2 Technical Review June 2015 CEA Saclay J.C Perez on behalf of Fresca2 collaboration team.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
11 T Dipole Experience M. Karppinen CERN TE-MSC On behalf of CERN-FNAL project teams The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded.
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) SMC E U CARD WP7 HFM S TATUS UPDATE MEETING O CTOBER 2011 J.C. Perez.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
HFM High Field Magnet, Engineering Design, 20/01/2011, Pierre Manil, 1/24 EuCARD-WP7-HFM ESAC Review of the dipole design Engineering Design Pierre MANIL.
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
Superconducting Magnet Group Superconducting magnet development for ex-situ NMR LDRD 2003 Paolo Ferracin, Scott Bartlett 03/31/2003.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
LARP Collaboration Meeting Racetrack Coil Fabrication
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
KEK-CEA Superconducting Magnet Co-operation Program The FJPPL workshop LAPP, Annecy-Le-Vieux (France), June LHC-3 Superconducting Magnets.
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
First Q4 cold mass engineering follow up meeting 16/03/2016 Q4 Status update H. Felice, M. Segreti, D. Simon and JM. Rifflet.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
Hardware Challenges and Limitations
QXF Coil Fabrication & Tooling Reaction / Impregnation
TQS Overview and recent progress
Model magnet test results at FNAL
11 T Dipole Integration & Plans M. Karppinen
HQ Mirror Assembly R. Bossert
CSP 25th November 2010 Technical agreement number 3: overview
TQS Structure Design and Modeling
ESAC Review February 2013 CEA Saclay
ERMC/RMM activities May 2017
FCC 16 T dipole 4578 dipoles + 5 % spares : 4807 dipole magnets
J.C. Perez on behalf of SMC collaboration team J.C. Perez
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
FRESCA2 Update on the dipole design and new calculations
the MDP High Field Dipole Demonstrator
SMC Design overview of the construction and project issues
MQXF updates P. Ferracin October 9th, 2014.
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
as a prototype for Super c-tau factory
Presentation transcript:

ESAC R EVIEW OF THE HIGH FIELD DIPOLE DESIGN R EACTION O VEN, S PLICING AND IMPREGNATION M ARCH 2012 FOR E U CARD-WP7-HFM J.C. Perez on behalf of SMC collaboration team J.C. Perez

2 28/03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN) OUTLINE Reaction Oven Vacuum Impregnation tank Impregnation mold Splicing design and tests Instrumentation and Traces Sub-scale models activities

H EAT TREATMENT FURNACE Technical specification ready beginning 2011 We had issues in Spring 2011 concerning the price proposed in EU Market survey in US on Spring 2011 Repeat market survey in summer 2011 Acceptable offer received from GERO (Germany) summer 2011 Final contract with GERO placed in September /03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN)

C OMPONENTS 4 28/03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN) 9Graphite plate 8Transfer table 9Loading table 7Retort 2 1Furnace 3 & 4 Checkered plate

P ICTURES FROM G ERO 5 28/03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN) Courtesy F. Lackner

S CHEDULE 6 28/03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN) TaskSchedulePersons CAD design approval, electrical layoutFebruary 21 st GERO Kisir, Geiger Transfer table and inert gas piping layoutFebruary 27 th GERO Kisir, Geiger Approval/comments to designMarch 1 st CERN Ordering further componentsMarch 2 nd GERO Reception furnace box at GEROWeek 21 (May 21 st - 27 th ) GERO Electrical wiring, control assembly, VDE Week 22 (May 28 th - June 3 rd ) GERO Acceptance test at GEROWeek 23 (June 4 th - June 10 th ) GERO and CERN Delivery to CERNWeek 24 (June 11 th – June 17 th ) GERO and CERN A special transport to CERN will be organized from GERO. Shock sensors will be applied to the furnace. Risk of small cracks on the inner brickwork. The status will be investigated after delivery. Smaller cracks will be filled with a special Cement. Transport risk: Courtesy F. Lackner

V ACUUM I MPREGNATION T ANK A vacuum impregnation facility will be installed in building 927 near the heat treatment furnace The technical specification has been approved in December confirming offers have been received The order has been placed middle of March 2012 (TELSTAR-Spain) Dedicated electrical power lines are installed in 927 laboratory 7 28/03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN)

V ACUUM THANK DELIVERY SCHEDULE 8 28/03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN) MilestonesRelevant Dates Signature of the contractMarch 15 th 2012 Preliminary design review and definitionApril 12 th 2012 Preliminary manufacturing planApril 19 th 2012 Final design file and Risk assessment presentation May 2 nd 2012 Design file and risk Assessment approval by CERN June 9 th 2012 Tests at supplier premisesAugust 22 nd August Vacuum tank delivery at CERNSeptember 6 th 2012 Final installation and commissioningSeptember 20 th 2012

I MPREGNATION MOLD Technical meeting on impregnation mold concept held at CEA on 16 th of March 2012 CERN team will provide all required information for mold design The mold concept will be inspired from the reaction tooling Al alloy with O-rings will be used CEA will produce the fabrication drawings for impregnation mold layer 3-4 by June the 15 th 2012 CERN will launch the price inquiry and follow-up the fabrication First mold to be delivered at CERN by September the 15 th /03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN) Reaction mold concept

S PLICE A REA D ESIGN 10 28/03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN) Nb 3 SnCoil Courtesy M. Timmins Rail Nb 3 Sn/ NbTi Splice Insulating plate NbTi Lead Nb 3 Sn Cable End Shoe Filler piece Copper stabilizer

F RESCA 2 I NTERCONNECTION 11 28/03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN)

I NTERCONNECTION M OCK - UP 12 28/03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN) An interconnection mock-up has been designed to validate splice operations. The delivery is expected on last week of March. Validation tests are scheduled on April 2012.

T RACES CONNECTION The traces will cover the total surface of the coil The connections will be hidden in a pocket machined on the end-shoe connection side (mold released) No wires will come out from the mold during impregnation process After coil impregnation, wires will be soldered to the traces and routed via a groove machined on the end-shoe (local impregnation) 13 28/03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN)

Q UENCH H EATERS & T RACES Inputs for Quench Heaters design will be provided by M. Durante and M. Bajko E. Todesco will be the reference Engineer at CERN for trace design He will visit different laboratories in the coming weeks to collect all required information on programs and calculation methods presently used to design Quench Heaters (Base line HD3/HQ/LQ?) Fresca2 traces design and CERN using 50 µm kapton and 25 µm stainless steel sheets (delivery time about 2 months after final design validation) Final Fresca2 traces are expected for end of October 2012 (on time for the first real coil) A preliminary trace will be used on the first copper coil 14 28/03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Keview (CERN)

T RACES & INSTRUMENTATION Each double pancake will be equipped with 2 traces The coils will be equipped with about 8 Vtaps/layer No strain gauge in the trace (gauges will be glued layer 1 pole) 6 stations will be placed on the shell mid-plane (12 gauges) 3 stations located on the magnet bore measuring along azimuthal and longitudinal direction Axial roads will be instrumented (longitudinal direction) 15 28/03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN) RMC trace preliminary design based on HD3 traces Traces location (4/pole) Gauges will be placed in the magnet bore

16 28/03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN) Characterization on strand and cable performance Layer jump area Splicing area Insulation method Traces connection Impregnation method Qualification of new vacuum impregnation tank Qualification of new oven S UB - SCALE MODELS ACTIVITIES

17 28/03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN) F ROM SMC TO RMC TOWARDS FRESCA2 SMC RMC FRESCA2 RMC goals : test FRESCA2 cable and FRESCA2-type coils in realistic cond. Constraints 1. Layer jump similar to FRESCA2 2. Power supply limit ~20 kA 3. Magnet OD: 570 mm Courtesy of P. Ferracin

RMC C OIL DESIGN 18 28/03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN) RMC coil FRESCA2 coil Same design as SMC 2 end spacers 33 turns (like FRESCA2) FRESCA2-type layer jump As a result Straight section: 300 mm 150 mm in SMC Coil length: 820 mm 500 mm in SMC 96 m of cable per coil 4.0 km of strand Courtesy of P. Ferracin

RMC M AGNET D ESIGN 19 28/03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN) RMC configuration 2 RMC coils I ss (1.9 K) = 18.3 kA Below power supply limit B peak = 16.0 T Significantly higher forces From 2.2 MN/m in SMC to 5.4 MN/m New structure required Thicker shell, new yoke design, larger bladders, larger axial rods RMC Courtesy of P. Ferracin

RMC 1 DOUBLE PANCAKE VS. 2 DOUBLE PANCAKES 20 28/03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN) o Still possible to test individual coils up to 20 kA  Corresponding to about 93% of I 4.2 K Courtesy of P. Ferracin

RMC D ESIGN S TATUS Fabrication drawings for coil components, reaction and impregnation tooling approved for execution. First winding scheduled for September /03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN) Mechanical structure design finished. Fabrication drawings are expected within two weeks. First mechanical assembly using an instrumented aluminum dummy coil scheduled for September. First cold test expected Q4-2012

O N GOING ACTIVITIES ON SUB - SCALE MODELS Characterization on strand performance in realistic conditions (SMC4 & SMC5) Characterization on strand and cable performance in realistic conditions ( RMC) Layer jump area (RMC) Splicing area (RMC) Braided insulation (RMC) Traces connection (RMC) Impregnation method for Fresca2 type coils (RMC - Close mold) Qualification of new vacuum impregnation tank Qualification of new oven (RMC) 22 28/03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN)

N EXT SMC ASSEMBLED COILS 23 28/03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN) SMC AssemblyCable TypeCable Insulation Scheduled SMC#3_bPIT 14 * Ø 1.25 mm S2-Glass sleeve FNAL type 2 Coils waiting for reaction SMC#11T_aOST RRP 108/ * Ø 0.7 mm 33 Tex S2-glass braided Q SMC#11T_bOST RRP 108/ * Ø 0.7 mm 11 Tex S2-glass braided & Mica 90 µm Q SMC#4PIT 18 * Ø 1.00 mm S2-Glass sleeve 100 µm or S2- glass braided Q SMC#5RRP 18 * Ø 1.00 mm TBDQ4-2012

N EXT RMC C OILS P RODUCTION 24 28/03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN) RMC AssemblyCable TypeCable Insulation Scheduled RMC#1 coil 1PIT 40 * Ø 1.0 mm S2-Glass braided Or according to FRESCA2 choice Q RMC#1 coil 2PIT 40 * Ø 1.0 mm S2-Glass braided Or according to FRESCA2 choice Q RMC#2 coil 1RRP 40 * Ø 1.0 mm S2-Glass braided Or according to FRESCA2 choice Q RMC#2 coil 2RRP 40 * Ø 1.0 mm S2-Glass braided Or according to FRESCA2 choice Q4-2012

A CKNOWLEDGEMENTS 25 28/03/2012 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM ESAC Review (CERN) T HANKS FOR YOUR ATTENTION CEA/Saclay: M. Durante, P. Manil, J.F. Millot, J.M. Rifflet, F. Rondeaux, CERN: P. Ferracin, E. Fornassiere, J. Humbert, A. Milanese, L. Oberli, M. Timmins, G. Villiger,, Fresca2 collaboration team