Uva GEM R&D Update –Part I Kondo Gnanvo, Nilanga Liyanage, Vladimir Nelyubin, Kiadtisak Saenboonruang, Taylor Scholz and Adarsh Ramakrishnan In Collaboration.

Slides:



Advertisements
Similar presentations
Update on GEM Activities for the 12 GeV Program in Hall A at JLab
Advertisements

Study of Large-area GEM Detectors for a Forward Tracker at a Future Electron-Ion Collider Experiment Aiwu Zhang, Vallary Bhopatkar, Marcus Hohlmann Florida.
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher Cross Talk issues with APV25 Electronics Uniformity.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
INFN GEM Front Tracker 2012 Oct 18 / SBS Coll. / JLabE. Cisbani1 V. Bellini, M. Capogni, E. Cisbani, S. Colilli, F. Giuliani, M. Gricia, F. Librizzi, M.
Introduction to GEM detectors assembly Leszek Ropelewski CERN CompassTotem 33 cm NA61 30 cm 20 cm 66 cm Totem Upgrade 10 cm.
Design and Construction of a First Prototype Muon Tomography System with GEM Detectors for the Detection of Nuclear Contraband M. Hohlmann 1, K. Gnanvo.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
GEM progress from Chinese collaboration Yuxiang Zhao University of Science and Technology of China Aug 20,
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
GEM chambers for SoLID Nilanga Liyanage University of Virginia
1 Tracking system based on GEM chambers Evaristo Cisbani Italian National Institute of Health and INFN Rome – Sanità Group PAVI – 09 / September.
Study of Large-area GEM Detectors for a Forward Tracker at a Future Electron-Ion Collider Experiment Aiwu Zhang, Vallary Bhopatkar, Marcus Hohlmann Florida.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
Construction and first commissioning of the self-stretched gas electron multiplier (GEM) detector J. Twigger, V. Bhopatkar, J. Wortman, M. Hohlmann 77th.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Overview of Production for CMS GE1/1
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
Statement of Interest in CMS MPGD High-  Muon Upgrade Florida Tech CMS Muon Group Marcus Hohlmann Florida Institute of Technology, Melbourne, FL, USA.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
JLab 22/Jan/2010 SBS - Review E. Cisbani / SBS Trackers 1 Concepts and Status of the GEM trackers Evaristo Cisbani / INFN-Rome Sanità Group SBS - Review.
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
Kondo GNANVO University of Virginia (UVa) Update on GEM Activities for the 12 GeV Program in Hall A at JLab.
News on GEM Readout with the SRS, DATE & AMORE
Front GEM Chambers Design concepts –Foils –Mechanics Electronics and DAQ Performance Current activity and plan Evaristo Cisbani / INFN-Rome Sanità group.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
APV25 Electronics for GEMs at UVa and for the 12 GeV Upgrade Program in HallA at JLab RD51 Electronic School, February 3-5, 2014 Kondo Gnanvo University.
GEM Detector R&D at Florida Tech – “Get to know each other” –
Plans for MPGD Radiation hardness tests for full detectors and components Matteo Alfonsi,Gabriele Croci, Elena Rocco, Serge Duarte Pinto, Leszek Ropelewski.
M. Staib, M. Abercrombie, B. Benson, K. Gnanvo, M. Hohlmann Department of Physics and Space Sciences Florida Institute of Technology.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Calibration of the gain and measurement of the noise for the apv25 electronics K. Gnanvo, N. Liyanage, C.Gu, K. Saenboonruang From INFN Italy: E. Cisbani,
Florida Institute of Technology, Melbourne, FL
Report on WP13 Sub Task and “Tools to facilitate detector development” 1.Interfacing FE-chips specific to gas detectors to the Scalable Read-out.
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
Large-Area GEM Detector Development at CMS, RD51, and Fl. Tech – A brief overview – Marcus Hohlmann Florida Institute of Technology, Melbourne, FL PHENIX.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
Front Tracker: main technical solutions 40x50 cm 2 module Front Tracker Chamber: 40x150 cm 2  Use COMPASS approach: 3xGEM, 2D readout - one significant.
M23 Inner Regions Upgrade with Triple-GEM detectors The EVLGG (Davide, Gianni & Ale) INFN Cagliari LNF Frascati INFN Roma.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
GEM R&D updates from Chinese groups Yuxiang Zhao University of Science and Technology of China May 24,
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
MPD HW & firmware status UVa Back Tracker parts status SBS JLAB 1 16 December 2015 Paolo Musico and Evaristo Cisbani GEM Readout Update.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
MPGD TECHNOLOGIES AND PRODUCTION GEMMicromegas Resistive MSGC (NEW!) Rui De Oliveira 7/12/20111Rui De Oliveira.
Section N4A4 Gaseous Detectors: R&D II.
Electronics for GEM R&D at the University of Virginia
Large CMS GEM with APV & SRS electronics
Design and Status of the SBS Front tracker
Development of Gas Electron Multiplier Detectors for Muon Tomography
Concepts and Status of the GEM trackers
EIC Tracking Meeting, March 26, 2012
(On Behalf of CMS Muon Group)
Presentation transcript:

Uva GEM R&D Update –Part I Kondo Gnanvo, Nilanga Liyanage, Vladimir Nelyubin, Kiadtisak Saenboonruang, Taylor Scholz and Adarsh Ramakrishnan In Collaboration with Evaristo Cisbani and Paolo Musico

Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype 2

GEM R&D and assembly facility at UVa  A 3.5 × 3 m 2 class 1000 clean room  Used for the assembly of BigBite drift chambers and GEM tracker with 10 × 10 cm 2 chambers  Located in a large (4.5 m x 9 m) semi-clean area.  Accessories (clean room table, HV Gas box,….  Additional clean room to be added later this year  Setting up the GEM UVa  the test and commissioning of the chambers  16 channels Wiener HV power supply (VME)  Picoammeter model Keithley 6487  CODA based DAQ  2 APV readout systems 3

GEM R&D and assembly facility at UVa  The mechanical stretcher  Use for stretching GEM foil and glue it to spacer frames to keep it flat  Stretch the foil to a tension bigger than 1kg/cm  Method developed by Bencivenni. Et al. (LNF Italy) for LHCb GEM chambers\ 4 New 40 cm x 50 cm GEM stretcher at Uva More detail in Kondo’s talk next week

Page 5 More detail in Kondo’s talk next week

6 Test frames glued More detail in Kondo’s talk next week

GEM R&D and assembly facility at UVa 7 GEM foil and Frame HV test box More detail in Kondo’s talk next week

GEM R&D and assembly facility at UVa 8 More detail in Kondo’s talk next week

GEM R&D and assembly facility at UVa 9 More detail in Kondo’s talk next week

GEM R&D and assembly facility at UVa 10 GEM foil and Frame HV test box More detail in Kondo’s talk next week

On going studies with 10 cm x 10 cm chambers  compact voltage dividers from CERN  Gains, spark rates etc. well studied for this combination of resistors  Nominal operation at 4100 V, but tested to 4300 V (Max voltage on a GEM foil is 430 V; this is small compared to 500 V foil test voltage)  If there a spark in the bottom GEM,  V for other GEMs increase by only about 6 V. A spark in the other foils has negligible effect. 11 GEM 1:  V = 410 V GEM 2:  V = 373 V GEM 2:  V = 328 V = 4100 V

CMS Prototype Gain measurements with the divider K. Gnanvo - SoLID Coll. Meeting, 02/03/12 Page 12

CMS Prototype Gain measurements with the divider K. Gnanvo - SoLID Coll. Meeting, 02/03/12 Page 13

GEM R&D and assembly facility at UVa 14  10 × 10 cm 2 GEM prototypes  3 working chambers for the tracker,  2 mores to be assembled soon  trigger GEM chamber with pad readout  Scalable Readout System (SRS)  Multi channel scalable readout system developed by the CERN-based RD51 coll.  Small UVa with up to 2048 ch  4 small GEM chambers with X/Y readout  Currently running with a standalone ALICE DAQ (DATE) and Monitoring (AMORE) software.  Integration of the SRS into CODA under development

Cosmic test results 15

Page 16

Page 17

Cosmic test results 18

Cosmic test results 19

Cosmic test results 20

Cosmic test results 21

Cosmic test results 22

Page 24

Page 25