RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR 2009 9/30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.

Slides:



Advertisements
Similar presentations
Mission Success Starts With Safety GSFC Electrostatic Discharge (ESD) Control Program Are you plugged in? Jeannette Plante, Program Manager, Code 300.
Advertisements

More CMM Part Two : Details.
First Article Inspection Report
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 16 EEE Parts 1 GLAST Large Area Telescope Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, BNick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
First Article Inspection
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
Section 20.0 Mission Assurance Roger Counts Systems Assurance Manager ST5 PDR June 19-20, 2001 GSFC 5 Space Technology “Tomorrow’s Technology Today”
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
Framework for Compliance, Verification, and Non-Conformance George Angeli LSST All-Hands Meeting Bremerton August 17, 2015.
From Research Prototype to Production
THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California.
GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 1 GLAST Large Area Telescope Data Acquisition Subsystem Gamma-ray.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 8 NCRs were generated during TMCM preproduction NCR #00029, CLOSED.
25-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : SMA Jorg Fischer, MAM Mars Atmosphere and Volatile.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
Instructions for Completing the P rint A ttribute R esults Form Last revised 3 January 2005.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Safety and Mission Assurance Jorg Fischer, PFP SMA Manager.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept EFW INST+SOC PDR97 RBSP Electric Field and Waves Instrument (EFW) Product.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.
Safety and Mission Assurance Lockheed Martin Space Operations (LMSO) Science, Engineering, Analysis, and Test Operation Safety and Mission Assurance Activity.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
01.Oct.01 SPIRE BSM Product Assurance Team Briefing 1 BSM Product Assurance Plan Team Briefing & PA plan roll-out Ian Pain.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January Instrument Pre-Environmental Review Safety and Mission.
EFW DFB Systems Assurance
EFW DFB Systems Assurance
Software and Systems Integration
THEMIS Mission Assurance
ISUAL Product Assurance
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
University of California - Berkeley
0.0 Instrument Suite Name Presenter’s name
GLAST Large Area Telescope:
BRIAN KLATT MISSION ASSURANCE MANAGER
KAMAN AEROSPACE GROUP L. Chodasiewicz - Supplier Quality Assurance.
First Article Inspection
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
{ TCS QMS Document Pyramid Tier 0 – Why Tier 1 - What
First Article Inspection (Per AS9102)
ESSI CHANGE AND nonconformity control SYSTEM
GLAST Large Area Telescope:
DOE Review of the LCLS Project October 2006
Presentation transcript:

RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP

RBSP/EFW CDR /30-10/1Trent Taylor DFB LASP QA Organization 101 Quality Assurance Build Configuration Verification Build Configuration Verification ESD Control LASP Flight Assurance Manager LASP Flight Assurance Manager Safety Configuration Management Configuration Management Documentation and Records Documentation and Records PMPCB, FRB, MRB Training and Certification Training and Certification Personnel Safety Personnel Safety Flight Hardware Safety Flight Hardware Safety Lab Inspections Contamination Control Contamination Control Support Flight H/W & S/W Testing Support Flight H/W & S/W Testing Inspections Quality Assurance Engineer Quality Assurance Engineer LASP Engineering Director

RBSP/EFW CDR /30-10/1Trent Taylor 102 DFB PA Requirements and Safety Performance Assurance Matrix Status –A few FPGA requirements still open. Closure is scheduled for 9/17/09 with APL’s acceptance of LASP’s FPGA Development Guide. –Materials & Processes requirement #122 still open (see below) No waiver/deviation requests to date –Materials and Processes requirement #122 of the PA Compliance Matrix may require a deviation request for LASP to use RGA instead of QCM. System Safety –LASP provided initial safety input with CDRL MA-006 for PDR. –There are no safety compliance issues with the EFW DFBs. –LASP will provide any further safety input upon request.

RBSP/EFW CDR /30-10/1Trent Taylor DFB Suppliers and GIDEP Suppliers –LASP procures all flight parts and materials through vendors on LASP’s approved vendor list. –LASP procures EEE parts directly from the manufacturer or through authorized distributors. –LASP requires full traceability on all flight procurements. –Program requirements are flowed through procurement documentation. Where necessary, procurement documentation may include source control documents (SCDs) and engineering documentation. –LASP’s DFB contains no custom or non-standard EEE parts. –LASP’s DFB procurements required no additions to the LASP approved vendor list. GIDEP Status –LASP has responded to APL GIDEP evaluation requests meeting all delivery dates. –There are no current GIDEP “hits” – no parts on the DFB are impacted by any Alert or Advisory. 103

RBSP/EFW CDR /30-10/1Trent Taylor DFB EEE Parts Parts –All EEE parts are procured to program requirements with no additional screening required with the exception of the following: JANTXV cavity devices (3 part types): GSFC will PIND test these parts. AD648/883B (OpAmp): GSFC will screen and qualify to EEE-INST-002 Level 2. No additional radiation testing is required. OP262GS (dual Op Amp - Plastic COTS). Parts were radiation tested by APL. GSFC will screen and qualify to EEE-INST-001 requirements. VTF TBX (Resistor Network – COTS): GSFC will screen and qualify to EEE-INST-002 Level Parts CE Approval Radiation Engineering Approval Screening/Qual Approval PMPCB ApprovalTOTAL EEE Parts63 Detectors00000 ASICs00000 Hybrids22222

RBSP/EFW CDR /30-10/1Trent Taylor DFB Materials & Processes Materials and Processes –MIL is up-to-date –Regular meetings with PMPCB –Will add PWB data when ordered (will be per required IPC specs) –Fasteners need to be approved Limited Life Items –DFB has no limited life items 105 M&P Category SubmittedApprovedConditionalPendingProhibitedTOTAL Non- Metallic Materials 1392%0%8%013 Metallic Materials 2100%0% 12 Processes367%0%33%03

RBSP/EFW CDR /30-10/1Trent Taylor DFB Configuration Management Configuration Management –LASP uses Agile software for Configuration Management Documents submitted, reviewed, and approved electronically All documents and records are searchable As-built records and as-run test procedures archived –Follow LASP’s Document & Record Control Procedure –Assembly Travelers (ATs) generated and archived in the system Flight Drawing/Document Status 106 DrawingsRelease DateDocumentsRelease Date Schematic9/18/09DFB SpecReleased Rev D Layout9/18/09FPGA Spec Draft 10/01/09, Prelim 12/01/09, Final 02/01/10 Fab, Assembly Instructions 10/01/09Test PlanPrelim 10/01/09, Final 12/01/09 Test Results1 st Qtr ‘10

RBSP/EFW CDR /30-10/1Trent Taylor DFB Contamination & ESD Control Contamination Control –All assembly performed at laminar flow-benches –Class 10,000 cleanrooms available –PWAs baked out with RGA –Packaging and shipping provisions to maintain low contamination exposure during transport ESD Control –QA owns and implements the ESD control program –LASP’s ESD Control Procedure meets ANSI/ESD S20.20 requirements –All applicable personnel trained and certified by LASP’s NASA-trained Level B instructor –Training certifications required for lab entry 107

RBSP/EFW CDR /30-10/1Trent Taylor 108 Mandatory Inspection Points and photo documentation specified in Fabrication & Assembly Instructions (FAIs) within ATs – Audit Assembly Traveler data package at each inspection point Check sign-offs, traceability, document revisions, etc. Verify acceptable lab temperature and humidity – PWAs Inspect solder workmanship to NASA-STD and.3 Parts placement and orientation – per engineering drawings and FAIs – Polymerics Inspect per NASA-STD , FAIs, drawings, and in-house standards Check mix records, durometer hardness of cure samples – Cables, Harnesses, Wiring Inspect crimps, solder and other workmanship to NASA standards Dimensions, shield terminations, shrink sleeve, etc. to FAIs, drawings, etc. – Other Inspections Incoming/Receiving; Kitting; Pre-cap; Calibration of Equipment; Acceptance and Environmental Test Set-up; Flight Connector Safe-to-Mate DFB Inspections

RBSP/EFW CDR /30-10/1Trent Taylor Non-Conformance Reporting 109 Non-conformances addressed per LASP’s Anomaly Reporting Plan Reporting Methods - Fabrication and Assembly Discrepancy Report (FADR) For rework-type non-conformances identified during fabrication/assembly - Non-Conformance Report (NCR) Level 1 NCR- for minor discrepancies Level 2 NCR- for test failures and other issues occurring after program Pre- Environmental Review, or for any anomaly that the Integrated Project Development Team (IPDT) determines to warrant Level 2. - Dispositions include: scrap, rework, return to supplier, refer to MRB - Processing of Level 2 NCRs is consistent with standard Failure Review Board (FRB) practices. - Material Review Board (MRB) report Dispositions include: scrap, rework, return to supplier, repair by standard or non-standard procedures, use-as-is, request for waiver Customer participation and approval required