F All Experimenters' Mtg - 6 Jan 03 Week in Review: 12/30/02 –1/05/03 Ron Moore – FNAL Store Summary – Best week! > 7 pb -1 Machine Studies/Maintenance.

Slides:



Advertisements
Similar presentations
Tevatron Beam Diagnostics: Boosting Collider Performance Vladimir Shiltsev, Ron Moore, Andreas Jansson FNAL/Accelerator Division.
Advertisements

Results of shooting without a “hot bucket” A.Shemyakin MI departmental meeting March 31, 2009.
F AEM - 22 Jan 07 Separator Spark History Ron Moore Fermilab – Tevatron Dept.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Run II Status and Prospects - Spalding1 Run II Status and Prospects Jeff Spalding Fermilab June 14, 2004.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
F Shot Engineering Accelerator Advisory Committee Elvin Harms Fermilab Beams Division 13 May 2002.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
Thursday 21/4 07:30: End of fill #1727. Beam dumped. ALICE compensator magnet fault. Delivered ~6.7 pb -1 in 7.5 h. 11:30 Stable beam # bunches/beam.
Electron cooling at the Recycler: Update and Cooling force characterization October 19 th, 2006 L. Prost, Recycler Dpt. personnel Fermi National Accelerator.
F All Experimenters' Mtg - 28 Jul 03 Week in Review: 07/21/03 –07/28/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
F 19 August 2002 All Experimenters Meeting Beams Week in Review Continued to work on providing Luminosity L  N p N a /  –Stacking rate –Coalescing efficiency.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Run II Operational Status and Plans Run II Meeting October 28, 2004 Dave McGinnis.
LHC progress Report LHCC Wednesday 23 rd March 2011.
PIP Status Report Linac Startup plans 12/05/2012.
Check lists to mouse clicks Automation Session : WAO The Fermi National Accelerator Laboratory is a U.S. Department of Energy (DOE) research laboratory,
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
October 2002 Jean Slaughter SDA – Shot Data Analysis Outline Description of SDA Examples Plans for 2003 SDA is a system for acquiring and analyzing data.
D. Still-FNAL/Tevatron HALO '03 Tevatron Collider II Halo Removal System Dean Still Fermilab Tevatron Department 5/21/2003 Motives for the Collider Run.
F All Experimenters' Mtg - 03 Mar 03 Week in Review: 02/24/03 –03/02/03 Ron Moore – FNAL Store Summary / What went wrong Tev Studies Highlights Tev Ground.
F All Experimenters' Mtg - 07 Jul 03 Week in Review: 06/30/03 –07/07/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
F All Experimenters' Mtg - 27 Jan 03 Week in Review: 01/20/03 -01/26/03 Ron Moore – FNAL Found obstacle in AP-1 line Replacing corroded Tevatron dipole.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
F Tevatron Operations Ron Moore DOE Tevatron Operations Review March 27, 2007 SC-1 Breakout.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
F Record luminosities at the Tevatron & Future potentiality Steve Werkema Fermi National Accelerator Laboratory Batavia, Illinois USA Asian Particle Accelerator.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
F HCP 2007 Performance and Future of the Tevatron Ron Moore Fermilab - Tevatron Dept. Tevatron overview and performance Antiproton source + Recycler overview.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
Recycler Operations and Studies July 23-30,2008 Meiqin Xiao.
Recycler Pbar Transfer -Gattuso 1 Recycler weekly Summary This presentation will probably involve audience discussion, which will create action items.
Cons Gattuso 2/23/10 Status/Changes to Pbar Transfer Program.
MI/RR Status January 3, 2014 D. Capista. MI Preformance.
Friday, Feb 12, 2010 Accelerator Status1 Accelerator Week in Review Part I: Regular 9am Scheduling Meeting –Crew Chief Summary –24 hour machine summaries.
Recycler Operation and studies Week Nov. 10- Nov Meiqin Xiao.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
SDA- Shot Data Analysis Jean Slaughter DOE Review July 21, 2003.
Changes in delivered luminosity by varying the store length, using the luminosity projection model described in in Beams-doc-2022 Vaia Papadimitriou 30.
Wednesday 8.9 External crossing angles:
Summary of Week 11: 14 – 21 March
Stores and Operations Summary Standard Plots
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary for LPC (March 7th, Ralph Assmann)
Presentation transcript:

f All Experimenters' Mtg - 6 Jan 03 Week in Review: 12/30/02 –1/05/03 Ron Moore – FNAL Store Summary – Best week! > 7 pb -1 Machine Studies/Maintenance Schedule for Week

f All Experimenters' Mtg - 6 Jan 03R. Moore - FNAL2 Store Summary Store Initial Lumi Deliv’d Lumi TerminationComments F48 on abort A11 at flattop before squeeze Intentional Shot from 100 mA stack; F48 on abort – pbar orbit too high Intentional Shot from 120 mA stack; Only 11% pbar loss up ramp; end-of-store studies IntentionalNo changes; 11% pbar loss on ramp again IntentionalNo changes; 11% pbar loss on ramp again Intentional Poorer pbar 150 GeV; 2 hrs end-of-store studies

f All Experimenters' Mtg - 6 Jan 03R. Moore - FNAL3 #2138 L=29.7 #2136 L=30.3 #2134 L= shifts maintenance #2123 L=25.5 #2121 L=21.8 #2116 lost at flattop #2114 L=30.7 Tev study RR shots RR shots RR shots RR shots RR shots

f All Experimenters' Mtg - 6 Jan 03R. Moore - FNAL6 Tevatron Pbar loss up ramp much improved –The little chromaticity changes finally made an impact –Loss down to typical 10-12% from 18-20% Measured chromaticities up ramp –First time since making many small changes –Requires 2-3 ramps at various RF frequency settings Smoothed flattop, squeeze orbits –Pbars were too high at A0, could not abort cleanly Tested software to help automate aperture scans –Computing Division contributing to project –Successful! Continue implementation…

f All Experimenters' Mtg - 6 Jan 03R. Moore - FNAL7 Chromaticity on Pbar Helix on Ramp Dec 18 Jan 3 Desired values Uncertainty  2 units

f All Experimenters' Mtg - 6 Jan 03R. Moore - FNAL8 Test of Aperture Scan Software Horz corrector E42 Horz corrector E44

f All Experimenters' Mtg - 6 Jan 03R. Moore - FNAL9 Recycler Pbar Shots 5 attempts throughout last week Best transfer Accumulator  Recycler efficiency = 87% Shot-setup + shots down to 45 minutes Exercising multiwires in transfer line –First successful operation –Lower transfer efficiency when wires in See instability in stashed beam – cause unknown Poor lifetimes during shots, while merging beam Extracted and accelerated in Main Injector –Still not coalescing in MI Try to get 100 E10 in Recycler this week

RR21 transfer line multiwires

Recycler instability RR intensity E11 MI mag power RR V emit pi mm mrad RR H emit pi mm mrad

RR intensity E11 ACC intensity E10 RR V emit pi mm mrad RR H emit pi mm mrad Recycler shots on 1/05

f All Experimenters' Mtg - 6 Jan 03R. Moore - FNAL13 This Week’s Schedule Access today until 16:00, turn-on in evening 5 shifts studies/maintenance starting this evening? –Pbar stacking studies with small stacks –Shoot to Pbars to Recycler Expect next HEP shot Wednesday evening Booster cool-down begins Sat 1/11 –Reduce MiniBoone rate –Reduce # turns used for stacking Tevatron store terminated by 22:00 1/12 for cryo

Weekly Schedule

f All Experimenters' Mtg - 6 Jan 03R. Moore - FNAL15 Summary Best week for delivered luminosity: > 7 pb -1 –1 store lost before collisions, 2 shifts studies, Recycler pbar shots Achieved 87% Accumulator  Recycler transfer eff. –Lifetime waiting for shot, instabilities are problems Access ending for Tevatron surveys, Main Injector RF repair, vacuum work 5 shifts of dedicated studies this week Stack and store from Wednesday evening until Sunday 22:00 Long shutdown begins Jan 13…