Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

RF de-bunching problem  The Beam Phase module measures the phase of each individual bunch and makes an average that is passed to the Low Level for updating.
● Morning: – Squeeze and collide. – Smooth, orbit rather well under control (max. excursion ~ 0.2 mm at TCT, roughly sigma). Orbit evolution at the.
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
The ATS MD part III (Achromatic Telescopic Squeezing scheme) Participants: Any (active) volunteers Goal: 1)MD1 (S. Fartoukh & R. Assmann  10h): “Pre-squeeze’’
31/10/2011LHC 8:30 meeting 1 Overview LHC Operation Week 43 Machine Coordinators: Barbara Holzer & Jan Uythoven.
* IP5 IP1 IP2 IP8 vertical crossing angle at IP8 R. Bruce, W. Herr, B. Holzer Acknowledgement: S. Fartoukh, M. Giovannozzi, S. Redaelli, J. Wenninger.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
LHC progress Report LHCC Wednesday 23 rd March 2011.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
Draft MD Planning Thu (3.11.) DayTimeMDMP Thu05:00 Ramp down, cycle 07: GeV: Injection stability and losses – check steering constraints, define.
Β*-dependence on collimation R. Bruce, R.W. Assmann C. Alabau Pons, F. Burkart, M. Cauchi, D. Deboy, M. Giovannozzi, W. Herr, L. Lari, G. Muller, S. Redaelli,
31/10/2011MD Planning 2011/12, MD#4 LHC Week 44 and MD Block #4 - Weekly Report - Machine Coordination: G. Arduini & R. Assmann MD Coordination: R. Assmann,
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Wednesday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Wire, flat beams and beam-beam MDs in 2017
Saturday 21st April 00:33 Interlock during ramp on BLM HV
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Β*-reach in 2017 R. Bruce, S. Redaelli, R. De Maria, M. Giovannozzi, A. Mereghetti, D. Mirarchi Acknowledgement: collimation and optics teams, BE/ABP,
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tuesday TOTEM and transverse loss map (1) OK
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Alice solenoid – orbit distortion
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Lost at 12:05 to power converter (RTQX2.R1) problem
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Wed :40 Lost S78 - QPS controller.
Week 35 – Technical Stop and Restart
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Monday February 28th 8h00: Injection
Week 36 Machine coordinators R.Assmann, R.Bailey
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
LHC Beam Operations Past, Present and Future
Saturday 7th May Sat – Sun night
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Programme for Friday 9 July
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
MD Planning Fri – Sat (1. – 2.7.)
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Summary for LPC (March 7th, Ralph Assmann)
Plan for 1 m b* J. Uythoven & J. Wenninger
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
HI2011 Commissioning Status
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to be exchanged Best latest estimate: ~12h from now  Thu ~20:00 Best to come back first with low intensity MD? Wed/Thu , RA LHC morning report

We performed aperture measurements in IR2 with different crossing angle configurations and betastar = 1m. These measurements complement the first measurement campaign of the 29th of October and provide a coverage of both sides of the aperture. This time, measurements were performed for a different polarity and a different amplitude of the vertical crossing angle: +120 urad (B1 notation) compared to -80 urad of the previous nmeasurements. The aperture was probed for B1 and B2 separately with additional crossing bumps added on top of the nominal crossing. The lumi scan angles and an additional external 4-C bump were used (same knobs as in the previous measurements). Summary of aperture measurements: , RA LHC morning report

B1 - V -> Unknown bottleneck found for a TCT opening of 12.5 to 13.0 sigmas B2 - V -> Triplet aperture found for a TCT opening of 15.0 to 15.5 sigmas For B1, the bottleneck is located somewhere upstream of the TCTVB.4L2. Its location could not be identified. For B2, the bottleneck is found at the triplet R2 as expected. TCTVB collimators were aligned around the reference orbit for precise aperture measurements. After the B2 measurement, the TCTVB.4R2 was re-centred around the beam for precise beam envelope determination. We found 4.57 sigma, as calculated from the collimator gap measurement. Like usual, apertures are given in terms of the TCT opening when the aperture bottleneck is moved from the TCT to the triplet (these results depend sligthly on the bump shape - to be corrected offline). The nominal sigma for a 3.5um normalized emittance is assumed. Note that for B2, the TCDD.4L2 (movable mask in front of D1 for the incoming B1) was found to limit the B2 aperture at about ~14-15 sigmas. Showers on the L2 side disappeared when the TCDD mask was moved to +/-15mm. This is not expected and should be investigated further. We could not repeat the aperture measurement for the negative Xing configuration and for an amplitude of -120urad because the beams were dumped due to losses from a colliamtor movement. Note that we established reference orbit for both signs of the external Xing with amplitudes of +/-120urad and for these two configurations we established beam-based collimator alignement. Parasitically, we measured tune shifts and coupling as a function of bump amplitudes to be used to quantify the effect of triplet field quality. Summary of the measurements for Xing = +120 urad: , RA LHC morning report

, RA LHC morning report

, RA LHC morning report

, RA LHC morning report

, RA LHC morning report

, RA LHC morning report

Draft MD Planning Wed (2.11.) DayTimeMDMPMP Wed07:00 Ramp down, cycle 09: GeV  3.5 TeV: ATS and tight collimation settings – Squeeze in IR1&5 to 40cm beta*. Optics correction. Collide (no crossing angle). Show adequate protection with tight collimation settings. Show full protection. Provides 2.5 times higher pile-up potential… A 19:00 Ramp down, cycle 21: GeV  3.5 TeV: IR2 Aperture Measurement – To verify parameters for ion commissioning, part of early commissioning B Thu05:00 Ramp down, cycle MD Planning 2011/12, MD#4 13/10/2011

Draft MD Planning Thu (3.11.) DayTimeMDMPMP Thu05:00 Ramp down, cycle 07: GeV: Injection stability and losses – check steering constraints, define limits for correctors, operational procedure for more stable injection line steering B 14: GeV: Quench margin at injection – BLM thresholds required at injection, room for optimization C 18: GeV  3.5 TeV: Quench margin at 3.5 TeV – apply transverse damper method, confirm May result, longer sustained losses, identify other possible limitations (know already about BLM power supplies); If any beam left Wire Scanner Quench Test C Fri02:00 Ramp down, cycle. MD Planning 2011/12, MD#4 13/10/2011

Draft MD Planning Fri (4.11.) DayTimeMDMPMP Fri02:00 Ramp down, cycle. 04: GeV: Beam instrumentation – understand dynamic aperture in LHC, compare to models, experimental reference case for upgrade studies B 11: GeV: Beam shape 13: GeV  3.5 TeV: Longitudinal beam stability – Explore single and multi-bunch stability in longitudinal phase space, instability thresholds, optimal and required RF parameters B 18:00 Ramp down, cycle. 20: GeV  3.5 TeV: ATS – Simultaneous squeeze to 0.1m in IR1 and IR5 with pilot beam, test of possible future upgrade optics for LHC A MD Planning 2011/12, MD#4 13/10/2011

Draft MD Planning Sat (5.11.) DayTimeMDMPMP Sat02: GeV  3.5 TeV: Tight collimation settings 08:00Ramp down, cycle. 10:00 Combined ramp & squeeze 14:00End of MD#4. Ramp down and cycle 16:00Start of ion commissioning MD Planning 2011/12, MD#4 13/10/2011