Thomas Jefferson National Accelerator Facility Page 1 FNAL/JLab weekly meeting, April 23, 2014 Agenda  Path Forward  Status at FNAL  Status at JLab.

Slides:



Advertisements
Similar presentations
Electrical Cable Aging and Condition Monitoring Codes and Standards for Nuclear Power Plants Electrical Cable Task Group (ECTG) NESCC Update: 7 November.
Advertisements

PAGE Quick Guide to the FedRAMP Readiness Process 1 August 2014 Presented by: FedRAMP PMO
MODELING THE TESTING PROCESS Formal Testing (1.0) Requirements Software Design Risk Data Approved, Debugged, Eng. Tested Code Automated Test Tools Tested.
NAVAL REACTORS PROGRAM TMDE Status
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Oki Printing Solutions Service Training for the B400 Series Printers B410 / B420 / B430 / B411 / B431.
Project Change Management
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities I.Target Hall We expect to move NT-05 to.
Working Group #3 E9-1-1 Location Accuracy December 16, 2011 Craig Frost, Verizon Wireless, Co-Chair Stephen J. Wisely, APCO International, Co-Chair.
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
Configuration Management
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
1 Welcome to EQ2430/EQ2435/EQ2440 Project in Wireless Communication Lecture 1 March 20, 2015 Per Zetterberg School of Electrical Engineering.
US Cavities Status and Plan Mark Champion 01 October 2009.
Implementing a Calibration Management System Cory Otto Principal Metrology Engineer, Boston Scientific 10 October 2012.
SE-02 CONFIGURATION MANAGEMENT Today we talk about Software Configuration Management (SCM for short): - What? - Why? - How?
TD/MSD TORUS CMM PRODUCTION: OVERVIEW G. Velev Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.
CHICAGO PUBLIC SCHOOLS IMPACT Gradebook Core Team Support Guidelines July 7, 2008 Instructional Management Program & Academic Communication Tool I M P.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden CRE Policy, Labelling 2006/06/22 - Toulouse ANTD SFP Page 1 Design,
Teamcenter Update May 2012 Agenda  What is Teamcenter  Benefits  Status  Planned Next Steps.
TMT M1CS Actuator Pre-ship Meeting Avasarala Technologies Limited Bangalore, India September 13 th, 2013.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
SC Project Review of NCSX, April 8-10, 2008 NSCX Poloidal Field Coils Michael Kalish.
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
Linac Marx Modulator Update Trevor Butler 5/20/2015.
Lab-Wide Earned Value Management System Project Core Team Meeting October 01, 2008 Dean A. Hoffer/Elaine McCluskey.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/19/2011.
FReSCa2 Technical Review, 9 th June 2015, CEA Saclay FReSCa2 Technical Review June 2015 CEA Saclay J.C Perez on behalf of Fresca2 collaboration team.
DCIPS Implementation Project Plan Update Army G2 Intelligence Personnel Management Office (IPMO) April 6, 2009.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
CLAS12 Torus CCM Plan Forward April 18, 2014 (Rev. 5) Kashy Wiseman Luongo Elouadrhiri.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
Mu2e WGM R. Ray Mu2e Project Manager Sept. 14, 2012.
Software Engineering 2003 Jyrki Nummenmaa 1 CONFIGURATION MANAGEMENT Today we talk about Software Configuration Management (SCM for short): -
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
Thomas Jefferson National Accelerator Facility Page 1 Clear Mold VPI Visualization D. Kashy S. Christo May 14, 2014.
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
Ronald Lipton Layer 0 Status PMG Sep Status of the Layer 0 Project – emphasis on hardware status, preproduction, and preparations for shutdown work.
NCSX Field Period Assembly (FPA) Operations, Cost and Schedule, Staffing, and Metrology Utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
TD/MSD REVIEW CHARGE AND AGENDA Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.
IGGIGG Industry Governance Group Secretariat: RMDS Secretariat: RMDS 1 IGG Agenda – July 19 th 2007 Minutes from last IGG meeting10.00.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
Customer Visit Center (CVC) Overview
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
1 Meeting the Future Together Update on The Garfield County “Socio-Economic” Impacts Study Energy Advisory Board April 7, 2005.
Production CM QA/QC Plans and Systems Production Cryomodule Final Design Review Jamie Blowers 12-May-2015.
EGEE is a project funded by the European Union under contract IST NA3 Execution Plan Malcolm Atkinson Director of the National e-Science Centre.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
Adaptive Software Development Process Framework. Version / 21 / 2001Page Project Initiation 2.0 Adaptive Cycle Planning 5.0 Final Q/A and.
Chapter 25 – Configuration Management 1Chapter 25 Configuration management.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
COMET Working Group Progress Report 11/13/03
Lessons learnt from CERN experience
2K Cold Box PDR Introduction
LCLS-II Cost Details E. Daly / C. Hovater / M. Wiseman with help from Accel Ops and Engineering 03-AUG-2017.
2K CB FDR Overview:  Agenda, Charge, Review Process
Plastic Pipe Rule – Tracking and Traceability Proposed Requirements
LCLS Injector: Introduction D. H
Quality Measurable characteristic Cyclomatic complexity Cohesion
SD Manufacturing, Assembly and Deployment in SE Colorado
Guidelines for the implementation of Regulation (EC) No 91/2003 of the European Parliament and of the Council on Rail transport statistics version 6.0.
Limited Streamer Tube Project Summary
Re- engineeniering.
GLAST Large Area Telescope:
Presentation transcript:

Thomas Jefferson National Accelerator Facility Page 1 FNAL/JLab weekly meeting, April 23, 2014 Agenda  Path Forward  Status at FNAL  Status at JLab  SSC cable shipping  Next Visit to FNAL  Others

Thomas Jefferson National Accelerator Facility Page 2 FNAL/JLab weekly meeting, April 23, 2014 CLAS12 Torus CCM Fabrication Plan Forward April 23, 2014 Latifa Elouadrhiri Control Account Manager For the JLab TORUS team FNAL/JLab TORUS team weekly meeting Wednesday April 23, 2014

Thomas Jefferson National Accelerator Facility Page 3 FNAL/JLab weekly meeting, April 23, 2014 High Level Plan 1.Continue VPI process with copper foils and tubes on coil structures as designed 2.Proceed with CCM002 potting after detailed revised procedure and successful MRR review 3.Start AES buffing T2 conductor for a potential practice coil 4.CCM003 on hold until we have a successful potting process

Thomas Jefferson National Accelerator Facility Page 4 FNAL/JLab weekly meeting, April 23, 2014 Steps Technical Report –Findings (Mark & George Velev) Practice coil potting CCM 001 potting –JLab Recommendations on the process (at three levels: Requirements, Recommendations and Suggestions) FNAL develop updated procedure and distribute for review – CTD, External Consultants and JLab Complete a full batch resin mixing, degassing and pot life test at FNAL (objectives: quantify pot life and do a full run of injection/flow system minus actual coil) Lessons learned plus Jlab Recommendation FNAL to develop new/final procedure – if significant changes repeat full batch tests JLab organize VPI Manufacturing Readiness Review (MRR) – At FNAL, with Jlab engineers, management and external reviewers After successful review start potting of CCM2

Thomas Jefferson National Accelerator Facility Page 5 FNAL/JLab weekly meeting, April 23, 2014 CCM2 VPI Plan All VPI procedural steps will be implemented! –Tooling and processes –Full Documentation processes included and full time JLab oversight Design changes to CCM003 are: –Holes in outer Cu and G10 –Extra strips of glass at G10 Notes: 1)Most of these can not be put on CCM002 2)These can only make CCM003 VPI more easily and completely and easier for NDT

Thomas Jefferson National Accelerator Facility Page 6 FNAL/JLab weekly meeting, April 23, 2014 Parallel Activities with prep and potting of CCM002 Develop Diagnostics for void finding Develop techniques that will allow installation of cooling tubes and foils after potting without those items –This will allow direct visual inspection of the coil pack VPI quality (both sides) before continuing Develop a test plan for CCM002 with all tests that can be run non-destructively, and in a reasonable timeframe (e.g., void detection, electrical tests, etc.)

Thomas Jefferson National Accelerator Facility Page 7 FNAL/JLab weekly meeting, April 23, 2014 Timeline Develop JLab technical Report - Draft 4/25 –Findings – (George & Mark) 4/25 Practice coil potting CCM 001 potting –Develop JLab recommendations for FNAL Review Draft by 4/25, FNAL Comments Back 4/30 Final version issued 5/2 FNAL develop updated procedure incorporating Jlab recommendations and distribute for review – CTD, Consultants, JLab –Draft by 5/6 –Complete a formal review by 5/9 Complete a full batch resin mixing, degassing and pot life test at FNAL (objectives: quantify pot life and do a full run of injection/flow system minus actual coil) Use actual mixing and degassing system and procedures with 70cm mold –Test complete by 5/16 MRR – At FNAL, JLab and external reviewers 5/22 Pot CCM2 – Start setup 5/26 after successful review and implementation of the review recommendations

Thomas Jefferson National Accelerator Facility Page 8 FNAL/JLab weekly meeting, April 23, 2014 CCM001 Plans Work with JLab to develop other NDT techniques and use CCM001 as platform to try these alternate techniques (e.g., time domain reflectometry) Request FNAL to remove outer copper sheet and try thermal imaging method to detect voids (depends on what we think of the coil as is) Repair voids if found using NDT techniques or by visual inspection Develop and test the cooling tube and foil replacement technique that will be needed as part of any coil repair Put in a coil case and perform final potting Ship to JLab – 80K test and 4K test (only if coil is qualified)

Thomas Jefferson National Accelerator Facility Page 9 FNAL/JLab weekly meeting, April 23, 2014 THANK YOU