WP4 Face to Face #6, Oxford 14 th July 2011 Welding summary Richard French – The University of Sheffield.

Slides:



Advertisements
Similar presentations
Testing and Quality Assurance
Advertisements

MICE Target Shaft Joint Change l MICE Target Ti shaft »Baseline stock material = drawn tube lower joined to solid upper (rather than manufacture from solid)
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Wood Screws Woodscrews are available in a wide range of shapes, sizes and materials. While mild steel wood screws are suitable for interior work brass.
Ciemat Mechanical Workshop and test of the Stainless steel plate machining for the CALICE-HCAL. Enrique Calvo/Mary Cruz Fouz Lyon
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
Target Assembly and Installation Update 20 th August 2009 Paul Hodgson The University of Sheffield.
What to do when you are done. PRINTING WITH PHOTOSHOP.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Cooling connections in the service gap Richard French The University of Sheffield.
Lesson No. 11 Week No. 07 Name of lesson Marking Tools
CSC 395 – Software Engineering Lecture 34: Post-delivery Maintenance -or- What’s Worse than Being a Code Monkey?
LINEAR MEASUREMENT.
Budgeting & Cash Control Maximizing Your Resources.
WP4 cooling update RAL 6 th Oct Welding – high repeatability statistics Bending – 2.275mm OD trials in Titanium with comparison of 1.8” OD bend.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
C ONCENTRIC TUBE H EAT EXCHANGER TEST SETUP AT C RYOLAB CO2 FOR CMS T RACKER WEEK MEETING. Theodoros Katopodis PH-CMX.
TURBO FLANGES We specialize in design, CNC milling, metal turning, plasma cutting, and TIG welding all done in house. Please contact us for further information.
1 ATLAS Upgrade WP4 Face to Face meeting Liverpool June 2012 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson, John Mattheson,
1 ATLAS Upgrade WP4 Face to Face meeting at Edinburgh - 11 th Jan 2011 WP4 task 2: Cooling activities Richard French – The University of Sheffield.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Ways to Check for Divisibility Dividing By 1 All numbers are divisible by 1.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Cooling loops for prototype staves Update on cooling pipes progress Confirmation of design of loop Discussion on design developments of loops for future.
1 QMUL Face to Face Meeting 2/2/2012 Richard French, Paul Kemp-Russell, Hector Marin-Reyes (Sheffield) John Matheson, Martin Gibson, Ian Wilmut (RAL) Ian.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
TRACI V3 Status & Delivery Plans UPDATE Paolo Petagna LHCb CO2 cooling meeting Apr 15 th, 2015.
MICE Target Mechanical Design l Status of Target ref. Schedule »Drawings –Drawing list created (see next slide) includes inventory –Drawings being released.
1 ATLAS Upgrade WP4 Face to Face meeting QMUL 9 th May 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson, John Mattheson,
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
1 Full document available on EDMS Metallurgical qualification of AISI 316L TIG welded tubes Summery - Richard French.
Dow Jones U.S. Style Indexes Returns Recalculation August 31, 2001.
Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.
1 ATLAS Upgrade WP4 Face to Face meeting Liverpool 10 th November 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson,
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Task 4.2 Stave Core Assembly (Tim). Task 4.2 Outline Year 1: Design and construction of staves and stavelets suitable for 130nm ASICs which will be used.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Ways to Check for Divisibility Dividing by 2 All even numbers are divisible by 2 Even numbers are numbers that end with either 2, 4, 6, 8, or 0.
La Mirada High Welding Creating a spark for the future!
IN2P3. Why Titanium for cooling circuits? Titanium material collect the most important criteria for cooling circuit design: Low CTE: important parameter.
Cooling Loop Update ATLAS W4 Sheffield Richard French The University of Sheffield + all UK contributors.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
VAC – CTRL SYS internal meeting, 14 Dec A list of topics Start of the disassembly works: mid Jan. At first the W arm shall be off- service, then.
Prototype Review 04-Sept Different side-closeout to allow petal end-insertion concept…self- guided… Only backup from last review in July…
1 Punishment Through Continuous Delivery If it hurts, do it more often…
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
Let’s Design a Box John Cobb
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
1 ATLAS Upgrade WP4 Face to Face meeting Sheffield 25 th August 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson,
Single Spoke Resonator SSR1 Construction Status P.N.Prakash Inter-University Accelerator Centre, New Delhi, INDIA.
1 ATLAS Upgrade WP4 Face to Face meeting Oxford 14 th May 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson, John.
Inspection of stock materials for defects
CLEAN UP & INSPECTION.
Can You Tell the Difference?
Cylinder design Ian Wilmut 10/11/11.
Pipe Bending Ian Mercer, Harald Fox, Richard French.
BSS Prep work at CERN and Acceptance of Parts
Flexible lines production and planning
Future tube procurement Richard French
Cooling loops for prototype Staves
WP4 – Plans for next 6 months
Update on Junction Box Design
Accounting, Fifth Edition
ATLAS UK-Upgrade WP7 LMT Automated Manipulation Testing
Teleconference ACS – FREIA 19th June 2017
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Presentation transcript:

WP4 Face to Face #6, Oxford 14 th July 2011 Welding summary Richard French – The University of Sheffield

Welding progress – materials 316L in 1/8” programme complete – to write up. 316L in 2.0mm OD – back burner but will fit in CP2 Ti in 1/8” 70% done – need to collate NDT and DT results, double check and write up. CP2 Ti in 2.275mm OD – there are problems and some are more fundamental than others.

Weld system update Original M200 procurement spec – met the baseline of 316L Stainless Steel in 1/8” with a wall thickness of 0.22mm which has been met. M200 failed before outside upgrade week at Oxford. Mechanical problems fixed and CPU problems also fixed. New software was not so good. Repeated trips to Warrington to callibrate the weld system to the old settings. This is now done (5 th July) and working correctly. New software ready in September – patches made to fix some pretty serious problems found. Big error from manufacturers to release. Cost us at least 3 months, revisiting old measurements and verifying weld programmes. Collets are now made (custom from Sheffield workshop) for 2.275mm OD tube – Can’t get a weld procedure to work yet. Power control has not been as good as previous software allowed. This supposedly fixed with recalibration – not tested. Have tried 5 electrode types, now altering tip angles. Main show stopper is weld head is only suitable for 3mm to 28mm OD – NOT 2.2mm!! This is causing havoc for RPM and arc gaps.

New weld head trials “ Borrowed” a Fronius weld head. Problems are this head has analogue encoder, M200 uses digital. Made a TTL to analogue conversion box. Made power plug conversion lead. Something unmentionable done to product ID. Weld head is a one-piece unit. It is very solid and the clamping mechanism gives significantly better alingment than the Swaglok product. Welds 1/8” equally well in 316L and CP2 Ti. Have to make some proper tests (NDT DT)as visual inspection not telling me anything. Will reference with previous welds from M H head combo. Dimensions are very similar to the smaller 4H weld head. This is significantly more robust and the encoder and power delivery system is significantly more advanced. Arc of clamping head could be a problem. 3x more expensive than 4H

Way forward 2 nd weld system procurement discussed at RAL on 13 th July. RF, TJ, JN, IW. – Tests will be made with a new 4H weld head and the M200 supply. Will this be any better for welding the small OD (2.275mm) Ti tube. – Test pieces have been sent to 3x orbital welding manufacturers. – Responses expected in Sept. – Procurement decision after evidence and testing.