STANDARD CONTRACT FORUM CREDIT VETTING 24 MAY 2004.

Slides:



Advertisements
Similar presentations
Proposal for a Directive on credit agreements for consumers Table of contents A. The history of the proposal and the state of play B. Objectives and scope.
Advertisements

CIVICUS World Alliance for Citizen Participation Transparency Key messages to increase the transparency and the predictability of aid.
INTERCONNECT PRODUCT FORUM Thursday 3 rd February
Total Utility Management Services, LLC is committed to helping your organization make the best informed energy decisions with decades of cost-proven results.
Project Nexus Next Steps Xoserve/Large GT View – 6 December 2011.
Electricity Price Breakdown Fix at premium or Pass Through.
The Conference on International Outreach and Cooperation in National Accounts for Sustainble Growth and Development Luxembourg, 6-8 May 2008.
Ninth Replenishment of IFAD’s Resources Draft Resolution: Revisions made since the 2 nd Session of Consultation October 2011.
144A – Calculation of Value at Risk (VAR) Simon Trivella – 24 th May 2007 Distribution Workstream.
Research Contracts and IP Services TRAINING WORKSHOPS ON HORIZON 2020 – 27 NOV 2014 The Grant Agreement Roger Wallace – Research Contracts & IP Services.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
STANDARD CONTRACT FORUM MONDAY 13 TH DECEMBER 2004 AT CUSTOMER SUITE, BT CENTRE 81 NEWGATE STREET LONDON EC1A 7AJ KEITH MITCHINSON.
MPID 223 (Failure to Follow Synchronising Instruction) JGCRP 12 th November 2014 (Anne Trotter)
Facilitate by: Mr. Ok Libounna Director for Financial Affair, Church World Service (CWS)
Strategic cost analysis 2
Show Them the Money: Building Supply Chains to Increase Profits Michael Hugos CENTER FOR SYSTEMS INNOVATION [c4si]
Reducing Budget Costs in the Turbulent Waters of PPAC When Outsourcing.
Liquidity: statutory consultation on the ‘Secure and Promote’ licence condition Power Trading Forum Martin Bell 12/12/13.
Ready to use Cloud SLAs. SLALOM Project2 SLALOM is ready to use Cloud SLAs “SLALOM will take theory to practice, providing a trusted verifiable starting.
Major Parts in a Business Plan
STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT CUSTOMER SUITE, BT CENTRE 81 NEWGATE STREET LONDON EC1A 7AJ KEITH MITCHINSON.
Local Assessment of Code of Conduct Complaints. 2 Background  On 08 May 2008 – the local assessment of Code of Conduct complaints was implemented due.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
MAY 17, 2001 ENERGY MARKETS IN TURMOIL PRESENTED TO THE INSTITUTE FOR REGULATORY POLICY STUDIES
CEE-SECR 2009 October Moscow, Russia Proposal Feasibility Study using Stochastic Risk Model Anton Khritankov.
United Nations Statistics Division/DESA International Recommendations for the Index of Industrial Production (IIP)
Standard Contract Forum 26 March am Customer Suite, BT Centre, London.
3 rd Party Registration & Account Management SMT Update To AMWG January 20, 2015.
SMT Joint TDSPs AMWG 17 Change Requests Update To RMS May 6, 2014 Bob Frazier Senior Director of Electric Technology CenterPoint Energy (representing SMT.
Interconnect Policy & Contract
Branch Chairs' Day 1 July 2010 Supporting and Overseeing Volunteers Marianne Wyles, Institute Secretary Rebecca Emmott, Assistant Institute Secretary Cheryl.
State Agency on Public Procurement and Material Reserves under the Government of the Kyrgyz Republic Public Procurement System of the Kyrgyz Republic.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Interconnect Product Forum 21 st October STANDARD CONTRACT FORUM SESSION 21 October 2009 Keith Mitchinson.
Provincial SCM Summit 03 February 2011 Bolivia Lodge Consolidated Policy inputs and Recommendations.
Science, research and development European Commission IDARI Project Meeting Tartu, June 2005 Martin Greimel Scientific Officer Directorate-E ‘Biotechnology,
Fuel Hedge Program MTA Finance Committee April 2012.
AMC Governance and Institutional Support. Objectives Build on existing capacity Ensure appropriate independence and credibility through transparency,
Standard Contract Forum 2 September 2004 Charles Walker 2 September 04.
Local Assessment of Code of Conduct Complaints. Background  On 08 May 2008 – the local assessment of Code of Conduct complaints was implemented due to.
Interconnect Policy & Contract
3 rd Party Registration & Account Management JDOA Update To RMS October 28, 2014.
Financial Management Glencoe Entrepreneurship: Building a Business Analyzing Your Finances Managing Your Finances 21.1 Section 21.2 Section 21.
Agency Charging Statement Overview of Consultation 11 th February 2008.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
Market Credit Working Group update to the Wholesale Market Subcommittee 03/04/
STANDARD CONTRACT FORUM SESSION 2 February 2010 Keith Mitchinson.
Standard Contract Forum 24 May am Customer Suite, BT Centre, London.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
3 rd Party Registration & Account Management SMT Update To AMWG September 23, 2014.
Odgerslawgroup.com. Are you looking to expand your dental practice? Buying an existing practice gives you an immediate access to an established patient.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
Food Suppliers Implementation of EDI &PAV March 2010
A New Climate - Financial Services Ombudsman, Ireland
The Atlantic Forum process and outcomes MARITIME AFFAIRS
Understanding Policy Measures
Dispute Resolution Between ICT Service Providers in Saudi Arabia
EU Tariffs Code Update Based on Refined Draft as of 30th October
Review of System Alerts
Performance Playbook for GPO Value
The future of cohesion policy and reporting requirements
Tuition Recommendations for the Academic Year
Update Interim implementation report and financial statement (December 2006) request from the Commission for additional documents in February –
Incentives 26 September 2018.
Discussion Points for Clause 17
CDSP Service Document amendment - high-level activity description*
Development of determination and verification manual (DVM)
Draft implementing act on Monthly Unemployment Rate (MUR) Item 3
Xoserve Draft UIG Incentives Modifications 20 May 2019
Presentation transcript:

STANDARD CONTRACT FORUM CREDIT VETTING 24 MAY 2004

CHARLES WALKER

BACKGROUND CONTRACT TEXT: ANNEX F STORYBOARD: PROPOSALS IDEAS EXPLANATION S PROCESSES POLICY DOCUMENT:

WHO? 1.ALL NEW OPERATORS 2.EXISTING OPERATORS WITH 2 SECURITY NOTICES HOW LONG? 12 MONTHS – UNLESS AMENDED BY REVIEW

CREDIT VETTING REPORT SOURCES EXTERNAL INFORMATION ( D&B) 2.INTERNAL BT INFORMATION 3. OPERATOR SUPPLIED INFORMATION

CREDIT REPORT A.RISK INDICATOR B.CREDIT LIMIT (EXTERNAL SUGGESTED) C.CREDIT LIMIT (INTERNAL CALCULATION) EXISTING OPERATORS : IF NOT ADVERSE, NO ACTION OTHER THAN PROFILE MONITORING ALL OPERATORS: CREDIT LIMIT HIGHER OF EXTERNAL OR INTERNAL REVIEW AFTER 3 MONTHS

CREDIT LIMIT SET CREDIT LIMIT

ESTIMATED FINANCIAL COMMITMENT (FORECAST) Built into ACO Form New Call Type Categories Erlangs Converted into minutes Minutes Priced at Average quarterly outturns Turned into Estimated Invoice Values for months 1-4 Process is transparent

SECURITY LEVELS Operator A Forecast Operator B Forecast Security Needed Operator A Forecast Operator B Forecast Security Needed Operator B Forecast Security Needed MONTHS CREDIT LIMIT

Credit Limit Profile Security Cumulative Daily Usage, PIV vs. Credit Limit PROFILE MONITORING Cum’ve Actual PIV 5% Tolerance

DISPUTES 1.OPERATOR APPEAL TO BT 2.BT RESPONSE TO APPEAL 3.OPERATOR OFFER MEDIATION 4.MEDIATION UNSUCCESSFUL/REJECTED – ADJUDICATION 5.ADJUDICATION CAN BE BINDING IF AGREED MEDIATION AND ADJUDICATION USING INDEPENDENT 3RD PARTY

TIMETABLE ACOPUBLISHED EARLY MAY POLICYFINAL DRAFT READY ANNEX FFINAL DRAFT READY NEXTFINAL COMMENTS FROM INDUSTRY PUBLISHPOLICY AND ANNEX F OFFER TO INDUSTRY IMPLEMENT