GLD ECAL Beam Test at DESY - Plan and outlook - Satoru Uozumi (Shinshu) Jan-30 2007 Japan-Korea Joint Shinshu Univ.

Slides:



Advertisements
Similar presentations
Adil Khan Kyungpook National university Korea-Japan Joint ScECAL Group Meeting kobe University Japan 3 rd September 2010.
Advertisements

The Multi-Pixel Photon Counter for the GLD Calorimeter Readout Jul Satoru Uozumi University of Tsukuba, Japan 1.Introduction 2.Recent.
Study of the MPPC Performance - contents - Introduction Fundamental properties microscopic laser scan –check variation within a sensor Summary and plans.
ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
GLD Calorimeter Status Oct 学術創成会議 S. Uozumi Shinshu University FJPPL meeting held at the end of September. Preparation underway toward the ECAL.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Beam test of scintillator strips Miho NISHIYAMA Shinshu University ・ scintillator strip calorimeter ・ Kuraray scintillator strips and KNU extruded ・ the.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
The 2007 CALICE Test CERN (part II) Erika Garutti, Fabrizio Salvatore.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
R&D of MPPC for T2K experiment PD07 : Photosensor Workshop /6/28 (Thu) S.Gomi T.Nakaya M.Yokoyama H.Kawamuko ( Kyoto University ) T.Nakadaira.
Study of the MPPC performance - R&D status for the GLD calorimeter readout – Nov 6-10.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK)
Study of the MPPC for the GLD Calorimeter readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group May 29 – Jun 4 DESY Introduction.
Scintillator ECAL for ILC for Calorimeter Review DESY May2007 Tohru Takeshita (CALICE-Shinshu) Idea implementation current status future mile stones.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
Scintillator-based ILC detector R & D Status and Milestone DongHee Kim Kyungpook National University Joint Korea-Japan Collaboration KPS meeting, Spring.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
KEK BT Summary &Plan Shinshu University Miho Nishiyama.
Study of the MPPC for the GLD Calorimeter readout Satoru Uozumi (Shinshu University) Feb Beijing Introduction Basic performances Future.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
R&D status of the Scintillator- strip based ECAL for the ILD Oct LCWS14 Belgrade Satoru Uozumi (KNU) For the CALICE collaboration Scintillator strips.
MPPC status M.Taguchi(kyoto) T2K ND /7/7.
MPPC Saturation Corection Idea -> how to do. MPPC Gain measurement To apply saturation correction to the beam data, all MPPC are needed to be calibrated.
An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)
SCECAL progress report Tohru Takeshita (Shinshu) _DESY Beam Test summary _improvements for FNAL BT _FNAL module _current status at Fermilab.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group (KNU, Kobe, Niigata, Shinshu, ICEPP.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Scintillator Strips DongHee Kim Kyungpook National University Daegu, South Korea.
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
DESY BT analysis - MPPC Saturation Correction - S. Uozumi Feb Sci-ECAL meeting 1.MPPC Gain Measurement (with LED data) 2.Inter-calibration of readout.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Short report on MPPC gain monitoring system S. Uozumi Jun ScECAL meeting At the FNAL BT, having the gain monitoring system for all the channel.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Strip Scintillator DongHee Kim Kyungpook National University Daegu, South Korea.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
Jet Energy Measurement at ILC Separation of jet particles in the calorimeter is required for the PFA  Fine granular calorimeter is necessary. Particle.
Beam Test Plans at the KEK Fuji Beam line (as of Nov ) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.
The Multi-Pixel Photon Counter for the GLD Calorimeter Readout Jul Satoru Uozumi University of Tsukuba, Japan for the GLD Calorimeter.
Report on the Beam Test Analysis Satoru Uozumi Apr GLDCAL meeting Topics of this talk are: Comparison of various MIP calibration methods Some problems.
The Scintillator-ECAL 2 nd Prototype S. Uozumi (Kobe) Jun
Study and Development of the Multi-Pixel Photon Counter for the GLD Calorimeter Satoru Uozumi (Shinshu, Japan) on behalf of the GLD Calorimeter Group Oct-9.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
M.Taguchi and T.Nobuhara(Kyoto) HPK MPPC(Multi Pixel Photon Counter) status T2K280m meeting.
Plan for the KEK beam test in November 2007 and Beyond Satoru Uozumi (Shinshu) Oct-1 Japan-Korea KNU.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Front end electronics for the Tile HCAL prototype Felix Sefkow DESY CALICE Collaboration ECFA workshop Durham September 1, 2004.
Performance of 1600-pixel MPPC for the GLD Calorimeter Readout Jan. 30(Tue.) Korea-Japan Joint Shinshu Univ. Takashi Maeda ( Univ. of Tsukuba)
Scintillator-ECAL Beam Test Scintillator-strip ECAL Beam DESY My task and achievement at DESY Contents Satoru Uozumi Shinshu University, Japan Nov-23.
ScECAL+AHCAL+TCMT Combined Beam FNAL
Installation and Run Plan
E. Garutti - Main Meeting
Testbeam analysis on module #1
Scintillator HCal Prototype
R&D of MPPC in kyoto M.taguchi.
The MPPC Study for the GLD Calorimeter Readout
Presentation transcript:

GLD ECAL Beam Test at DESY - Plan and outlook - Satoru Uozumi (Shinshu) Jan Japan-Korea Joint Shinshu Univ.

Beam DESY (Feb 25 – Mar ) 26 layers 468 channels Using 1-6 GeV positron beam, evaluate energy resolution, linearity, and position (or spatial) resolution. Have experience of full MPPC readout. - World’s first trial ! Show excellent performance of our detector to the world !

DESY Beam-line ECAL module Movable stage e + 1~6 GeV Trigger counters (3 x 3 cm) Veto counter (with a 2 x 2 cm hole) xyxy Drift chambers (resolution ~ several hundred  m) DESY II Electron Synchrotron e-e- Beam can be defocused up to spot size ~ 5 x 5 cm We can also collimate the beam, but intensity will be lost. Beam rate is order of 10 6 GeV) ~ 300 Hz 3 GeV) with collimated beam Accelerator is always running, and we can have the beam anytime we want!

3 Types of Modules ① WLSF readout 13 layers ② Direct readout 13 layers ③ WLSF readout by extrusion technique 13 layers Beam FR ②①③①①② layers We will examine 3 different combinations of the modules.

Movable stage Can perform precise x-y scan with accuracy of ~1 mm A steel plate (60 x 100 cm) will be mounted on the green arms to put our test modules.

Bias Voltage Control We can set value of the DAC output for each individual MPPC with ~0.02 V step (5 V / 8 bit = 0.02 V / count) Need to prepare a text table which contains DAC counts for all the channels  Need mapping information to convert MPPC number - Strip position – Electronics channel HV supply To Slow-control PC 8 bit DAC (0-5 V) To MPPC 80V -0.96V = V Baseboard single channel

Data & Analysis The data are stored with a binary format on dcache system. Expected raw data size is about 5 kB / events. (very rough estimate, with +- 50% of uncertainty) We can access to the binary data using the Marlin analysis framework. –Similar to CDF Run II analysis framework (my feeling) –Need C++ basics – Using the Marlin framework, we will make root ntuples for quick analysis on the beam test.

Analysis procedure 1.Make ADC distribution for each individual strips. 2.Convert ADC counts to number of fired pixels.  need to know accurate gain of the MPPCs. (Correct for P.D.E. variation with temperature, if necessary) 3.Correct MPPC saturation effect using correction curve and get number of photoelectrons measured on each strip. 4.Divide it with calibration constant (= p.e./MIP), and obtain number of MIPs measured on each strip. 5.Evaluate Energy resolution and Linearity (add responses over all the strips), or evaluate position / spatial resolution

Concern 1 Gain and P.D.E. vary with temperature change 30 o C 25 o C 20 o C 15 o C 10 o C 0 o C -20 o C  V 0 /  T = (56.0 ± 0.1) mV/ o C Can we really correct these effect just by measuring temperature? (for example, device-by-device variation of  V 0 /  T is small enough?)

Concern 2 – correction curve Tsukuba guys are still working to understand this problem … 1600 pixel expected reponse curve 1600 Light input (photoelectrons) Light input (arbitrary) By peak height MPPC signal Light input (arbitrary) 1600 pixels Taken by charge ADC 1600 pixels taken by peak height

Measurement Plan MIP Calibration (once per a couple of days) Since only the positron beam is available, we need to remove all the tungsten plates Energy scan (1-6 GeV, with 0.5 or 1 GeV step) Position scan Test fiber readout module Setup Test direct readout module Test KNU module MPPC dose test withdraw weeks

Beam Test Participants DESY contacts … Benjamin Lutz (Beni), Erika Garutti One room for Feb 25 – Mar 29 (Chang) One room for Feb 25 – Mar 3, Mar

Beam Test DAQ ace Online data monitoring (check pedestal, dead channel, etc) Data analysis software / ntuplization / event display Drift chamber operation and analysis MIP calibration analysis Gain calculation (MPPC and electronics inter-calibration) MPPC response correction Quick result of energy spectra / resolution Temperature / LED monitoring data, correction MPPC dose test

What we will bring to DESY? ECAL module system, LED / temp. monitoring systems Trigger / veto counters Analysis server (CoreDuo 2.3GHz, 1GB RAM, 500GB HD) Laptops with X-window system (Does everyone have it?) Oscilloscopes Testers Source-meter, HPK amp ? Cables, connectors, test boards Tools (drivers, nippers, pliers, cutters, etc….) Request radiative source to DESY Tell me if we need to put more items to the list.

1234 Dec Jan Feb 2007 Delivery of 400 MPPCs MPPC numbering Mass check MPPC baking and soldering megastrip Assembly & source scan ACFA Shipping Feb-14 Beam DESY Feb 25 ~ Mar 29 Test assembly Install LED/Temp. monitor system Prepare shipping MPPC mass check. MPPC soldering Direct-readout megastrip source scan Delivery of 360 MPPCs Fabrication of megastrip layer components Prepare MPPC mass check system KEK Megastrip bench test Fabrication of Frame / light shielding structure Finalize module design MPPC study (response curve) Contact DESY (DC gas, safety issue, etc) Schedule toward the SC-ECAL Beam DESY Establish LED / Temperature monitoring system Analysis code / Event display Prepare Trigger / Veto counters Japan -Korea Settle MPPC Operation voltage

Summary The GLD ECAL beam test will be held at DESY during Feb 25 – Mar The preparation is going well, but we still have lots of things to do. Schedule until the beam test is very tight ! We will have an exciting experience at DESY!

Backups

Questions about KNU module How to put the module ? MPPC Gain monitoring ? Temperature monitoring ? Measurement plan ?

Accomodation plan

CRC board (in VME crate) AHCAL module To DAQ PC HV supply (up to 100 V) To Slow-control PC Baseboard (6 analog boards mounted, 6 board x 18 chan. = 108 chan. ) GLD ECAL module FPCB Scheme of the Readout Electronics

Analog Board ASIC scheme 100nF 10pF Charge Preamplifier :  Low noise :  Variable gain : 4bits : 0.67 to 10 V/pC CR-RC² Shaper : Variable time constant:4 bits (12 to 180ns) 12ns  photoelectron measurement (calibration mode) 180ns  Mip measurement (physics mode) 12kΩ 4kΩ 24pF 12pF 3pF in 8pF4pF2pF1pF 40kΩ 8-bit DAC 0-5V ASIC Rin = 10kΩ 50Ω 100MΩ 2.4pF 1.2pF 0.6pF 0.3pF 0.1pF 0.2pF 0.4pF 0.8pF 6pF

Gain of the ASIC Amp We have 2 different modes under current setting : 1. Physics mode … lower gain, large dynamic range Can not see the ped – 1 p.e. peaks separation 2. Calibration mode … high gain (~x20 of physics mode) Can see the peak separation We can choose the mode for each individual run. Inter-calibration of the gain between these 2 modes is necessary. Will be performed in MIP calibration run? We can choose some other gains if we request, though I think current setting for AHCAL is useful enough. MIP calibration run (Each with phys. and calib. mode) Pedestal run (Each with phys. and calib. mode) Beam run (Physics mode) Pedestal run (Each with phys. and calib. mode) …… MIP calibration run (Each with phys. and calib. mode) …… LED calibration run (Each with phys. and calib. mode)

Pedestal – 1 p.e. Peaks Separation (Calibration mode) Coaxial ~ 2 m To HCAL baseboard MPPC Clear fiber LED V bias – V 0 = 1.95 V V bias – V 0 = 2.95 V

Dynamic range (Physics mode) Pedestal (~1123 ADC counts) Saturated MPPC Signal (~20220 ADC counts) ( ) / 226 * 19.1 = 1603 pixels Distance between pededestal – 1p.e. In Calibration mode Ratio of Gains between calib. and physics mode Dynamic range is enough for 1600 pixels !! V bias – V 0 = 2.95 V

Raw binary data LCIO data User analysis modules Database Detector geometry, alignment, mapping, etc … Plots, Ntuples, …. Analysis scheme We need to request for database entry for our ECAL module Need to prepare codes for detector geometry, mapping. We also need to give a “Prefix” of our detector which is used as identifier in the analysis module (like AHCAL) I propose “SCECAL” (SCintillator ECAL) for the prefix. (e.g. our calibration constants will be named SCECAL_CALIB on database) Marlin framework

DESY Felix... The head Erika... Expert of everything in CALICE group Beni … Expert of the AHCAL DAQ electronics and analysis contact person of the GLDCAL beam test at DESY Sebastian … Expert of software package Niels … Expert of AHCAL analysis code Nicola … Expert of SiPM / MPPC Alexandra … Expert of SiPM / MPPC They are really nice, and of course, very reliable !