AFP Fast Timing System Andrew Brandt, University of Texas at Arlington in collaboration with Alberta, Giessen, Stony Brook, and FNAL, Louvain, LLNL (CMS)

Slides:



Advertisements
Similar presentations
The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
Advertisements

T958! Fermilab Test beam experiment to study fast timing counters for FP420 MOU between UTA, Alberta, Louvain, Fermilab (Brandt spokesman) Data taking.
AFP QUARTIC Fast Timing System James L Pinfold University of Alberta.
QUARTZTOFMike Albrow CMS-FP420 April 28 th 2008 QUARTZTOF An isochronous & achromatic Cerenkov Counter Making Cerenkov light parallel  point focusing.
Photodetector Timing Resolution Burle Micro-Channel Plate Photo Multiplier Tubes (MCP-PMTs) H. Wells Wulsin SLAC Group B Winter 2005.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
Photon Counting Sensors for Future Missions
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
1 QUARTIC, A TOF for ATLAS/CMS Forward Protons You didn’t know that ATLAS+CMS had forward protons? FP420 = Forward Protons 420m downstream of CMS & ATLAS.
The UC Simulation of Picosecond Detectors Pico-Sec Timing Hardware Workshop November 18, 2005 Timothy Credo.
1 SciFi electronics meeting – CERN– June 20 th 2011 Some ideas about a FE for a SciFi tracker based on SiPM A. Comerma, D. Gascón Universitat de Barcelona.
1 QUARTIC: UTA Update Andrew Brandt, Chance Harenza, Joaquin Noyola, Pedro Duarte Preliminary UTA drawing of Mike Albrow’s concept for a fast time resolution.
Groups Involved University of Alberta, University of Texas at Arlington, University College London. Prague, Saclay, Stoneybrook, Giessen, Manchester,
Page The TORCH PMT: A close packing, multi-anode, long life MCP-PMT for Cherenkov applications James Milnes Workshop on picosecond.
LHC Fast Timing Detector R&D Use arrival time difference between protons to measure z- vertex compared with the central tracking primary vertex Purpose:
Report on SiPM Tests SiPM as a alternative photo detector to replace PMT. Qauntify basic characteristics Measure Energy, Timing resolution Develop simulation.
Peter Križan, Ljubljana March 17, 2006 Super B Workshop, Frascati Peter Križan University of Ljubljana and J. Stefan Institute Aerogel RICH and TOP: summary.
Fast Timing Workshop Krakow, Nov 29 - Dec 1 st 2010 Part 2b.
TOF for ATLAS Forward Proton Upgrade AFP concept: adds new ATLAS sub-detectors at 220 and 420 m upstream and downstream of central detector to precisely.
Page The TORCH PMT: A close packing, multi-anode, long life MCP-PMT for Cherenkov applications James Milnes International Conference.
1 Fast Timing via Cerenkov Radiation‏ Earle Wilson, Advisor: Hans Wenzel Fermilab CMS/ATLAS Fast Timing Simulation Meeting July 17,
Experimental set-up Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE Multi-Channel MCP PMTs S.Korpar a,b, R.Dolenec.
Photodetection EDIT EDIT 2011 N. Dinu, T. Gys, C. Joram, S. Korpar, Y. Musienko, V. Puill, D. Renker 1 Micro Channel plate PMT (MCP-PMT) Similar to ordinary.
ATLAS Forward Proton Electronics Andrew Brandt, University of Texas at Arlington 1 AFP concept: adds new ATLAS sub-detectors at 220 and 420 m upstream.
1 QUARTIC Update Andrew Brandt (UT-Arlington), Mike Albrow (FNAL), Jim Pinfold (Alberta) Preliminary UTA drawing of Mike Albrow’s concept for a fast time.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
FP420/AFP Timing Two types of Cerenkov detector are employed: QUARTIC – two QUARTIC detectors each with 4 rows of 8 fused silica bar allowing up to a 4-fold.
The primary goal has been to have the AFP timing system fully defined for the AFP Technical Proposal by December The end result should be a system.
Experimental set-up for on the bench tests Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE/Photonis Multi-Channel.
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
Andrew BrandtSept 13 th 2005FP420/Cerenkov Intro 1 Location of LHC in France and Switzerland, with lake Geneva and the Alps in the background The ATLAS.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
PID for super Belle (design consideration) K. Inami (Nagoya-u) - Barrel (TOP counter) - Possible configuration - Geometry - Endcap (Aerogel RICH) - Photo.
Mike AlbrowSept 14 th 2006Time-of-Flight with GASTOFs im Test Beam 1 Fast Timing Counters for FP420/CMS and Test Beam Particle ID Mike Albrow, September.
Fast Timing Mtg April 15 th 2009 Mike Albrow Fast Timing studies at Fermilab : Test beam plans notes from meeting April 15 th 2009 MTest May Wed 27 th.
July 4, 2008 SuperBelle Meeting, KEKPeter Križan, Ljubljana Peter Križan University of Ljubljana and J. Stefan Institute Burle MCP PMTs as photon detector.
Updates at Nagoya univ. K.Inami (Nagoya) - Photon detector R&D - Lifetime improvements - Simulation design study.
Abort Gap Monitoring Randy Thurman-Keup 6 / 8 / 2004 LARP Meeting.
Barrel PID upgrade K. Inami (Nagoya) Ljubljana, Hawaii, Cincinnati and PID group - R&D status - Structure design - Prototype study - Beam test - Photon.
T979 QUARTIC Timing detectors for HPS240 M.Albrow, A.Ronzhin, S.Malik, Sergey Los, A.Zatserklyanyi, E.Ramberg, Heejong Kim New physics channels for CMS.
FIT (Fast Interaction Trigger) detector development for ALICE experiment at LHC (CREN) Institute for Nuclear Research (INR RAS) National Research Nuclear.
1 SiPM studies: Highlighting current equipment and immediate plans Lee BLM Quasar working group.
1992PH.D. UCLA/CERN (UA8 Experiment discovered hard diffraction) Post-doc and Wilson Fellow at Fermilab -Discovered hard color singlet exchange.
Barrel PID summary K.Inami (Nagoya) Summary of R&D at Hawaii, Cincinnati, Ljubljana and Nagoya.
Beam Halo Monitor : Q-bars+SiPMMike Albrow, 26 Aug 2010 A Beam Halo Monitor for the LHC based on Quartz Cherenkov Counters Mike Albrow (Fermilab) Features:
Module-0 of AFP ToF Detector Libor Nozka on behalf of ATLAS Forward Proton Group Palacky University 1.
FP420/AFP Fast Timing Stage I: LHC luminosity 2 x10 33  t < 20 ps (
Quartic tests at Fermilab test beam June rd 2015 One “prototype” module made. #1 ? To CERN mid July for August test beam.
Pileup Background Rejection Ex, Two protons from one interaction and two b-jets from another Fast Timing Detectors for FP420 z=c(TR-TL)/2  z (mm) =0.21.
Mike AlbrowFP420 – May Timing and Pile-up Considerations 1 Pile-up in trigger and pile-up off-line (HLT) very different issues. Here I consider.
TORCH – a Cherenkov based Time-of- Flight Detector Euan N. Cowie on behalf of the TORCH collaboration E N Cowie - TORCH - TIPP June 2014.
Fast Timing Detector R&D Use time difference between protons in pp->pXp events to measure z-vertex compared with primary tracking vertex Purpose: Pileup.
10 picoseconds original design goal (light travels 3mm in 10 psec!) gives large factor of background rejection; Phase I: lum up to several  t
Mike Albrow, FermilabHPS Comments, Manchester 20l0 Some random HPS comments Mike Albrow HPS is accepted in CMS as an R&D project : Physics case is accepted.
Time resolution for the full detector system: 1. Intrinsec detector time resolution 2. Jitter in PMT's 3. Electronics (AMP/CFD/TDC) 4. Reference Timing.
Proposal for the after-pulse effect suppression  Observation of pulses and after-pulses  Shape measurement  Algorithm  Results  Efficiencies for after-pulse.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
ATLAS Forward Proton Upgrade AFP concept: adds new ATLAS sub-detectors at 220 and 420 m upstream and downstream of central detector to precisely measure.
Fabio, Francesco, Francesco and Nicola INFN and University Bari
Plans for this week MWPC: wire stretching today
Andrew Brandt, University of Texas at Arlington
HPS: R&D issues Krzysztof Piotrzkowski (UCLouvain/CERN)
Test Beam Studies for FP420 Fast Timing
Update of time measurement results with the USB WaveCatcher board & Electronics for the DIRC-like TOF prototype at SLAC D.Breton , L.Burmistov,
Andrew Brandt (UT-Arlington), Mike Albrow (FNAL),
Instrumentation for Colliding Beam Physics 2017
Latest Results from T979: PSec Time-of-flight
Variable distance from beam.
TOF read-out for high resolution timing
Presentation transcript:

AFP Fast Timing System Andrew Brandt, University of Texas at Arlington in collaboration with Alberta, Giessen, Stony Brook, and FNAL, Louvain, LLNL (CMS) OUTLINE: Introduction and requirements Detectors and test beam performance Electronics, including reference timing Laser tests PMT lifetime Cost, Schedule, TDAQ AFP Technical Review CERN April 7,

10 picoseconds is design goal (light travels 3mm in 10 psec!) gives ~x20 fake background rejection; Stage I: m few  t < 20 ps Stage II: 2016 add 420 m  t <10 ps Motivation 22 Use time difference between protons to measure z-vertex and compare with inner detector vertex. In 220 m phase this will provide crucial confirmation that any observed signal is legit Pileup background rejection/signal confirmation Ex: Two protons from one interaction and two b-jets from another WHY? How? How Fast?

Final Timing System Requirements 10 ps or better resolution Acceptance over full range of proton x+y Near 100% efficiency High rate capability (~5 MHz/pixel) Segmentation for multi-proton timing L1 trigger Capability Radiation Tolerant 3 Note: For 220 m at modest luminosity/multiple interactions, the requirements are not as stringent: 20 ps resolution, perhaps 1-2 MHz/pixel, multi-protons on same side not a significant problem, and the Level 1 trigger capability is not strictly necessary.

AFP Baseline Plan Two types of Cerenkov detector are employed: GASTOF – a gas Cerenkov detector that makes a single measurement QUARTIC – two QUARTIC detectors each with 4 rows of 8 fused silica bar will be positioned after the last 3D-Si tracking station because of the multiple scattering effects in the fused silica. Both detectors employ Microchannel Plate PMTs (MCP-PMTs) 30 cm 4

Components of AFP Fast Timing Reference Timing Opto- modules/ ROD HV/LV Cerenkov Radiator L1 Trigger 5

From joint 2010 ATLAS/CMS CERN TB  t(G1-G2)=14 ps implies 10 ps single detector resolution! BUT… only one single measurement, no segmentation, electronics challenging. Wonderful detector developed by K. Piotrzkowski (U.C. Louvain). Low index of refraction means little time dispersion, extremely accurate, radiation hard, little material for Multiple scattering GASTOF 6

4x8 array of 5-6 mm 2 fused silica bars QUARTIC is Primary AFP Timing Detector UTA, Alberta, Giessen, Stony Brook, FNAL Multiple measurements with “modest” resolution simplifies requirements in all phases of system 1) We have a readout solution for this option (can plug GASTOF into this) 2)We can have a several meter cable run to a lower radiation area where electronics will be located (without degrading overall system resolution) 3)Segmentation and L1 trigger is natural for this detector 4)Possible optimization with fibers instead of bars—discuss later Only need a 40 ps measurement if you can do it 16 times: 2 detectors with 8 bars each, with about 10 pe’s per bar 7 proton photons MCP-PMT

Micro-Channel Plate Photomultiplier Tube Burle/Photonis 64 channel 10 and 25  m pore MCP-PMTs have been tested extensively with test beam and laser and would be default for first stage except for lifetime issues (later) 8

MCP-PMT Requirements Excellent time resolution: ps or better for 10 pe’s High rate capability: I max = 3  A/cm 2 Long Lifetime: Q = C/cm 2 /year at 400 nm Multi anode: pixel size of ~6 mm x 6mm Pore Size: 10  m or smaller Tube Size: 40 mm round, 1 or 2 inch square Need to have capability of measurements in different parts of tube between 0-2 ns apart, and in same part of the tube 25 ns apart 9 Photek 240 (1ch) Hamamatsu SL10 (4ch)

2010 CMS/ATLAS Fermilab Test Beam 2 x2 mm Trigger Scint siPM courtesy of Ronzhin, Albrow Use siPM in beam as reference for evaluating QUARTIC 10

2010 QUARTIC Test Beam Results Time Difference between adjacent bars is <20 ps, implies <14 ps/bar including bar, PMT, CFD! Too good to be true: due to charge sharing and light sharing, bars are correlated. Time Difference between “distant bars” 4 and 7 is 37 ps, implies 25 ps/bar (exceeds QUARTIC design goals!!!) 11

 t(siPM – Quartic Bar) Tails due to large pulses from multiple protons saturating amps  t=28 ps if Q~25 siPM <15 ps siPM-(avg of 3 quartic bars ) reduced from ~28 (for single bar) to 21ps consistent with expectations Note MCP-PMT with Quartz bar in beam “Nagoya Detector” can give ~5ps resolution 12

Giessen Fiber Quartic 13 From Sabrina Darmawi’s thesis, Michael Dueren, Hasko et al Facilitates variable bin size to optimize rate+lifetime Simulations promising Needs upgraded readout electronics to fully evaluate Prototype performance

Preliminary Fermilab tests indicate improved time resolution over quartz bars by up to 30%, even though less total light More studies needed including effect of fiber pigtails for better mapping onto the MCP-PMT Alberta Fiber Quartic 14

Electronics Layout 15

ALCFD ALCFD (Alberta/Louvain Constant Fraction Discriminator): 8 channel NIM unit with mini-module approach tuned to PMT rise time, <5 ps resolution for 4 or more pe’s ZX60 4 GHz amplifier (we use pairs of 4, 8 GHz amps in different combinations to control total amplification) We will replace with diode/amp board that fits on tube Stony Brook upgrade in progress to add trigger capability based on coincidence of quartz bars and basic ADC for monitoring gain 16

Alberta HPTDC board 12 ps resolution with pulser including non- linearity corrections. Successfully tested at UTA laser test stand with laser/10  m tube/ZX60 amp/LCFD ps TDC resolution in laser tests Test beam data complicated by 19 ns bunch structure

Concern:HPTDC designed to operate with 40 MHz clock but with occupancy of <2 MHZ; at high luminosity this might not be sufficient QUARTIC HPTDC Buffering 18 (4 useful channels/ chip instead of 8, but occupancy problem solved, except for ref clock see below) Hit rate (MHz)Total hitsLoss hitsLoss rate e e e e \ Hit rate (MHz)Total hitsLoss hitsLoss rate e e e e e e e e-2 Loss rate in channel buffer for Logic core clock = 40MHz Loss rate in channel buffer for Logic core clock = 80MHz

19 Reference Timing Overview Reference timing is needed to connect two arms ~ 0.5 km apart; what we want is T L -T R, what we measure is (T L -T ref )-(T R -T ref ), so need small jitter in T ref Solution has been developed by SLAC/LLNL involving phase lock loop. We need only minor modifications to use 400 MHz RF instead of 476 MHz, and circuit to convert 400 MHz to 40 MHz and multiplex clock for use in HPTDC board

20 Reference Timing Test Results SLAC test show 10 ps total variation over 20 C! Adding a correction for temperature, or controlling temperature of electronics (not cable) will reduce the jitter to a couple ps!)

Ref. Timing Rate Reduction Concern: integrating reference time into DAQ since 40 MHz rate too high for occupancy restrictions But actually we only need reference time for good events! 1) Form a trigger based on multiplicity of CFD signals in one row -example if at least 4/8 bars have a signal 2) Only send CFD signals to HPTDC board if trigger is satisfied 3) Trigger reference time signal as well, so a chip will have 4 inputs: three bars in the row where trigger was satisfied, and the ref time signal corresponding to that row 4) possibly also keep some prescaled signals for monitoring 21

L1 TRIGGER The Trigger formed in previous slide for controlling reference time rates can also be used for a L1 Trigger, instead of dedicated trigger detector In simple trigger, based on hits in timing detectors, 1 CTP term for each proton side. Use large diameter air core cables to minimize the cable delay due to latency concerns For 420 can use several bins and combine with jet information from calorimeter 22

LeCroy Wavemaster 6 GHz Oscilloscope Laser Box Hamamatsu PLP-10 Laser Power Supply 23 laser lenses filter MCP-PMT beam splitter mirror Established with DOE ADR, Texas ARP funds,

Beam Mode Fiber Mode (a) (b) (d) (c) 24

10 pe Time Resolution from Laser Tests Laser tests of Photonis 10 µm tube show that with sufficient amplification there is no dependence of timing on gain (low gain operation extends lifetime of tube) 25

No rate dependence on number of pixels hit (that’s a good thing!) Saturation from Laser Tests Saturation refers to the reduction in amplitude of the output signal due to the pores becoming busy at the rate increases (typically 1 msec recovery time/pore). This plot shows that saturation is a local phenomena, and is unaffected by multiple channels being on at the same time. 26

Lifetime Issues Lifetime due to positive ions damaging the photocathode is believed to be proportional to extracted charge: Q/year = I*10 7 sec/year Q for =2  A/cm 2 is 20 C/cm 2 /yr Can reduce this requirement with fiber detector but still off by at least a factor of 20, so developed an R&D plan to pursue this 27

Extending Lifetime Inhibit positive ions from reaching photo- cathode - Ion Barrier: aluminum film on top of MCP’s (had reduced collection efficiency side effect) so Nagoya developed new approach (between MCP’s). Factor of 5 or more lifetime increase (~3 C/cm 2 ) for 4x4 SL10 28

Extending Lifetime Minimize creation of positive ions - Use ALD coating of MCP’s (funded SBIR proposal with Arradiance and Photonis in progress) NEW RESULTS HERE Harden photocathode or improve its composition - solar blind photocathode could reduce impact of positive ions 29

Photocathode Dual MCP Anode Gain ~ 10 6 Photoelectron  V ~ 200V  V ~ 2000V photon + + MCP-PMT Arradiance coating suppresses positive ion creation (NSF SBIR Arradiance, UTA, Photonis) + Ion Barrier keeps positive ions from reaching photocathode (developed by Nagoya with Hamamatsu Use Photek Solar Blind photocathode or similar (responds only to lower wavelength/more robust) Increase anode voltage to reduce crosstalk (UTA)  V ~ 500V Gain < 10 5 Run at low gain to reduce integrated charge (UTA) Improve vacuum Seal (Nagoya/ Hamamatsu) A Long Life MCP-PMT e-e- 30

31 UTA laser results consistent with UTA/FNAL TB results 16 ps for 25 pe (expected amount of Light using quartz radiator in front of SiPM) But this is not viable design, Radiation wise Would need a Quartic-like design Ronzhin, Albrow At FNAL have been studying Possible MCP-PMT Alterntive: SIPM

32 Funding Need to discuss with collaborators before filling this out

33 Manpower Need to discuss with collaborators before filling this out

34 Estimated Production Cost 380k$ for 1Q+1G 500k$ for 1Q+2G 680k$ incl. spares No Gastof option Removes about 100k$ Red numbers are not as well known

35 “Schedule” Minimal coupling between timing sub-components means development and production of all parts can proceed essentially in parallel. System factorizes into 1)Radiator: have a quartz bar solution, would prefer fibers if comparable performance 2)PMT: likely modified Planacon or modified SL10, both have same pixel size+layout 3)Electronics chain: amplifier/CFD/HPTDC 4)Reference Clock 5)Infrastructure (HV/LV/Cable) 6)Detector integration into Hamburg pipe 7)TDAQ integration

36 Timing TDAQ Integration L1: 2 CTP terms via one long large diameter air-core cable from each side (use ALFA integration solution) Readout: Timing integration to be done via optomodule providing data from HPTDC board to standard ATLAS RODs (whichever ROD is used by Silicon system should work). One 12 channel HPTDC board required/per 8 channels of QUARTIC (each HPTDC board has 3 chips run at 80 MHz, Providing 4 channels each; two chips have 3 Q channels and a clock while the third has 2 Q’s a G and clock). So the one GASTOF one QUARTIC option gives 48 timing readout channels/side while adding an extra QUARTIC gives 96/side. If we add the ADC that would give an ADC channel for each timing channel. So the minimal system (1Q+1G no ADC) has 96 total readout channels, while the full system would have (2Q+1G+ADC) = 258 channels

37 Substantial progress in all phases of fast timing, including integrating trigger capabilities into fast timing detector/electronics We have a prototype fast timing system for AFP that seems to be capable of ~10 ps resolution, validated with beam and laser tests Significant improvements in lifetime by Nagoya/Hamamatsu ; also through UTA collaborations with Arradiance, Photonis, Photek on lifetime. Solution exists for modest integrated charge (few C/cm 2 ), C/cm 2 seems achievable on a few year timescale. In progress: final optimization and layout of detector, electronics, PMT; evaluating radiation tolerance/needs of all components Timing detector not on critical path assuming ATLAS approves AFP in a timely manner and R&D, production funding is obtained Conclusions