Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Advertisements

Sept. 18, 2008SLUO 2008 Annual Meeting ATLAS Detector Upgrade Opportunities M. G. D. Gilchriese Lawrence Berkeley National Laboratory.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Gerhard Schneider1 14 October 2011 Status of the Composite Vacuum Chambers M. Gallilee, C. Garion, M. Malabaila,
LHeC Experimental Beam Pipe
Aluminum bellows for experiments
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
Vacuum studies at LAL Bruno Mercier, Christophe Prevost Alexandre Gonnin, Christian Bourgeois, Dirk Zerwas R.P. ILD MDI Meeting 24/3/15.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
CMS Pixels upgrade CO 2 cooling transfer lines Introduction to the two projects P.Tropea 5 Dec 2012.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
1 Safety and Database Subsection ADO - PO - SA Safety achievement and future activitiesSafety achievement and future activities Database (see K. Pommes.
Alice overview New detector and chamber ALICE TC.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
Preliminary View on the LHeC Experimental Vacuum Chambers Jonathan Bosch - University of Manchester And Ray Veness - TE/VSC J.Bosch and R.Veness LHeC -
Technology Department LSS2 modifications Impact on the vacuum systems LTEX - 18/01/2011 Eric PAGE – TE-VSC.
J. Strait Fermilab 16 October 2006 Consideration on LHC upgrade from A US perspective.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Lau and Niels, NA62 TD meeting, 17 March Complete the crane consolidation in TCC8 Reinstall front-end after alignment checks Consolidation of T10.
Next Steps, Priorities, Strategy for Spares Ray Veness.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
Consolidation and Upgrade plans for the LHC Vacuum System
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
Introdcution to Workpackage/Activity Reflection D. Schulte.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Preamble Run 2 and Run 3 will see the continued exploitation of the forward physics potential of the LHC in the long straight sections (LSS) either side.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
Update on Experimental Beampipe Progress Ray Veness For Beampipe project team in AT/VAC and TS/MME With special thanks to: S.Calatroni, W.Cameron, D.Duarte,
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE)
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
29 October 2015 B. Di Girolamo. B. Di Girolamo – Collider-Experiments Day – 5 th HiLumi Annual Meeting 2 Collider-Experiments Interactions There is a.
Vacuum System P. Chiggiato TE-VSC
News and Introduction from CERN June 15th, 2005
Internal review of IR2 LEP cryostats (WP11/WP5) Close out session
Installation of an Instrument on a CERN machine
LHC schedule.
Machine-Experiment Interface
LHC Experimental Vacuum Systems Status October ‘07
4th FRC meeting, Antti Onnela, CERN-PH-DT
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Progress with Experimental Vacuum Chambers
Renovation of the 45-year old PS magnets
Upgrade Strategy for the Experimental Vacuum Systems
Project management Ray Veness.
East Hall under construction
Presentation transcript:

Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC

Contents o Overview of the upgrade project o Project work packages o Recent changes to the project ‘environment’ o Key activities in the 2012 shutdown o Key activities in the 2016 shutdown o Diameters of central beampipes o New requests from the experiments o New data on beampipe alignment o Current issues under discussion o Conclusions LHC Experimental VacuumLHCC Nov'10- R.Veness

Project Work Packages o Timescale o Agreed May 2010 o Covers period o Some modifications will not be complete by the end of this period o Volume of work o 3 new beryllium chambers o 11 other new vacuum chambers o 8 other vacuum technology developments o Access procedures in activated environments o Development, design, construction, installation, commissioning o Integrated project resources o 27.4 person-years staff (~4.5 people average full-time) o 6.5 person-years of visitors o 5982 kCHF of installed hardware and 2590 kCHF of VSC project costs LHC Experimental VacuumLHCC Nov'10- R.Veness

Recent Changes to Project Environment o Project now operating o We have recruited 1 staff engineer, 1 staff technician, 1 fellow and 1 technical student for the project between July and October 2010 o Vacuum technology development and procurement of components is in progress o ‘White Paper’changes to LHC schedule o CERN White Paper ‘Provisional Planning for the LHC and Injectors for the Next Decade’ in August 2010 o 2014 shutdown becomes 2016 and 2018 shutdown becomes o ATLAS and CMS new PIXEL layer installation delayed to 2016 o ALICE replacement central beryllium pipe comes forward to 2016 [not yet in work packages] o LHCb new vertex detector in 2016 [not yet in work packages] LHC Experimental VacuumLHCC Nov'10- R.Veness

2012 Shutdown: ATLAS o 4 new vacuum chambers o No change in envelope (beam aperture) o Replace stainless with aluminium for reasons of: o Access and ALARA during interventions o Detector background o Requires detector opening and removal of 6 vacuum chambers LHC Experimental VacuumLHCC Nov'10- R.Veness Half-length of the ATLAS beam vacuum sector

2012 Shutdown: LHCb o Install 1 new chamber and 2 new support systems o Install a replacement UX85/3 conical beryllium chamber o Required due to varnished leaks in the existing chamber o No change to layout or material o Install and position new ‘spider’ supports for the UX85/2 and UX85/3 chambers o Re-optimised for lower-Z with material changed from aluminium to beryllium o Requires removal of 3 vacuum chambers and their supports LHC Experimental VacuumLHCC Nov'10- R.Veness Cross-section of LHCb experiment View inside magnet showing chambers and spider supports

2016 Shutdown: ATLAS and CMS o ATLAS and CMS consolidate PIXEL detectors o Add another layer of pixel o IBL project in ATLAS and 4-layer PIXEL in CMS o Make room for the detector by reducing the central beampipe diameter from 58 to (50mm) o Beam aperture for current and Phase-I upgrade optics (as per 2009) were studied o Implications for CERN TE-VSC o Design and production of 2 new beryllium chambers and supports o Full opening of both experiments and removal of all vacuum chambers (16 in total) o Complex retro-fit procedure inside existing ATLAS detector o Full procedures for interventions in a radioactive detector LHC Experimental VacuumLHCC Nov'10- R.Veness Installation of CMS beryllium ATLAS beryllium pipe in the PIXEL

Renewed Discussions on Central Beampipe Diameters o Situation upto summer 2010 o Working towards a reduction from 58mm to 50mm diameter for ATLAS and CMS in 2014 o Aperture and machine protection were check OK by machine experts o We were awaiting final layouts in ‘Z’ to verify vacuum, impedance and collimation o Request to study sub-40mm chamber for ALICE in 2018 o ALICE had stated that a 50mm chamber would not give enough space for a useful PIXEL upgrade o Situation as of Autumn 2010 o Request for sub-40mm diameter chamber for ALICE for 2016 o Working towards a decision on an acceptable diameter for the end of 2011 o Request for sub-50mm diameter chamber for CMS for 2016 o Request for sub-50mm diameter chamber for ATLAS for 2012 shutdown o ATLAS would like an ‘urgent’ spare chamber compatible with the IBL LHC Experimental VacuumLHCC Nov'10- R.Veness

New Information on Beampipe Alignment LHC Experimental VacuumLHCC Nov'10- R.Veness M.Nessi (ATLAS) in LEB meeting of 4/11/10W.Riegler (ALICE) in LEB meeting of 4/11/10 Data collected during the 2010 run has given new insight into the actual position of the beampipe on the interaction plane with respect to beam and detectors

Open Issues o ‘Tomography’ data from ALICE, ATLAS and CMS show good correlation with the originally installed positions of the chambers, however there are still open questions: o High-β optics may not be compatible with 50mm or less diameter o ATLAS and CMS confirm they do not see the need for high-β after 2016 o Is this an issue for an ATLAS ‘spare’ for the 2012 shutdown? o Does the beampipe move relative to the beam over a longer period? o Data still being collected by ATLAS et al. o Has there been any movement of central beampipes away from the interaction plane? o eg. tomography would not show ‘rotation’ of the chambers o Other issues: Vacuum (stability, pressures), impedance and heating, collimation check require the length of the smaller diameter section o Formal approval via Engineering Change Request and presentation to LHC Machine Committee will be required LHC Experimental VacuumLHCC Nov'10- R.Veness

Conclusions o Consolidation and upgrade project o Project is approved, personnel have been recruited and is now in progress o Work is progressing as planned for the 2012 shutdown changes o Recent changes to the LHC schedule and new requests from the experiments mean that the work packages and associated resources must be revised o Diameters of upgrade chambers for ALICE, ATLAS and CMS o Reduction of beampipe diameter to 50 mm has been verified for post-2016 operation for aperture, machine protection, mechanics and survey o Missing longitudinal layouts for verification of vacuum, impedance and collimation o Data from the experiments collected during the 2010 physics run are starting to give useful feedback as to the relative positions of beam, beampipe and detectors o This may yield some additional margin for reducing beampipe diameters o Spare beryllium chamber for ATLAS o The request for a sub-50mm spare beryllium chamber to be ready in time for a 2012 LHC shutdown is extremely challenging, from both technical and logistical points of view LHC Experimental VacuumLHCC Nov'10- R.Veness