K-Band Focal Plane Array Steven White Program Manager.

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
NRAO Receivers Richard Prestage
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Integrated Receivers.
Shilpa Bollineni, Glen Langston, John Ford, Randy McCullough and Paul Demorest DATA ACQUISITION ON THE 43M TELESCOPE.
The Green Bank Telescope a powerful instrument for enhancing ALMA science Unblocked Aperture Low sidelobes gives high dynamic range Resistance to Interference.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
Receiver Systems Suzy Jackson – based on previous talks by Alex Dunning & Graeme Carrad.
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
PAF Status Meeting June 2015 B. Shillue. February Slide Phased Array Feeds The Jan 2015 GBT test was successful, demonstrating: – Seven low-noise beams.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Spectrometer PDR John.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Central Development Laboratory (Adapted from John Webber’s Viewgraphs, April 2002 Presented tonight by Skip Thacker) IEEE Tour April 2003.
CDL Band 2 Design Study Kickoff Meeting Goals of this meeting – Finish in one hour – Everyone upon leaving knows their role and responsibility and how.
1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 1 EddiCam: The Eddington Photometric Camera Preliminary design.
GBT K-band Focal Plane Array Monitor and Control Interface, Cryogenic LNA Bias System February 27, 2008.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Status Report #2 Automatic Child Safety Gate: Corry Winslow Roger Battles Philip So Description: A telescoping gate with sensor technology through the.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Glen Langston: OSU 08 1 Improved Tools for Astrochemistry Glen Langston Methods for detection of families of molecules Example: HC 7 N collaboration with.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
K band History Science workshop determined efficiency improvements necessary for K Band: weather, observing requests, mapping programs. Only enough funds.
1 Jennifer Takaki CfAO Akamai Observatory Internship Program Project Supervisor: Lucio Ramos Subaru Telescope, NAOJ Home Institution: Hawaii Community.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April EVLA Front-End CDR EVLA Front-End Schedule.
Response to ASAC Report of May 2004 Response to ASAC The Atacama Large Millimeter Array Tom Wilson and Al Wootten Science IPT.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array FPGA Spectrometer.
GBT Focal Plane Array Development Program Steven White Program Manager.
1 W-band Module Production and Other Fermilab Contributions Proposed Significant Partnership in QUIET-II to the Fermilab PAC in November 2009 Modest Fermilab.
An Integrated Program for GBT Focal Plane Array Development Steven White Based on discussions with: Rick Fisher, John Ford, Matt Morgan, Roger Norrod,
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Phased Array Feed Development.
1 KFPA Critical Design Review – Fri., Jan. 30, 2009 KFPA Data Pipeline Bob Garwood- NRAO-CV.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
A Modular K-Band Focal Plane Array for the Green Bank Telescope Matt Morgan National Radio Astronomy Observatory 9/28/2007.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
K-Band Focal Plane Array: Integrated Downconverter Module #1 Matt Morgan and Tod Boyd National Radio Astronomy Observatory 8/7/2008.
Centimeter Receiver Design Considerations with a look to the future Steven White National Radio Astronomy Observatory Green Bank, WV.
Australia Telescope Users Committee Technologies Report - Oct 2008.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
FourStar Status Eric Persson (OCIW) Presented By.
Extended Detector Cutoff Considerations WFIRST Project Office May
K-Band Focal Plane Array Project Engineering Overview Matt Morgan National Radio Astronomy Observatory 2/27/2008.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Homestake DUSEL Project Management and Systems Engineering Richard DiGennaro LBNL April 20, 2007.
LBT Q Engineering and Software Review ENGG Engineering General.
Brent WilloughbyEVLA Front-End CDR – WVR Option 24 April EVLA Front-End CDR Water Vapor Radiometer Option.
GBT Focal Plane Array K band 7 Pixel Steven White Program Manager.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Engineering Opportunities.
Focal Plane Arrays and Focal Plane Electronics for Large Scientific Telescopes The HAWAII-2RG (H2RG) is the leading IR focal plane array (FPA) in ground-
Camera PDR/CD1 Planning 19 September 2008
Matt Morgan National Radio Astronomy Observatory
LSST Commissioning: FY18 Planning
Jesper Schou Instrument Scientist
Budget, Schedule, Contingency
EVLA M/C Software PDR, 14 May 2002
05/08/09.
EVLA Advisory Committee Meeting System Status
Mark McKinnon EVLA Project Manager
Introduction and Overview
Instrument Overview Larry Springer HMI Program Manager
KFPA CDR R. Norrod Feb 27, 2008.
System Specifications Lab Tests
Molecular Imager: Focal Plane Array
Molecular Imager: Focal Plane Array
Presentation transcript:

K-Band Focal Plane Array Steven White Program Manager

Jay Lockman, Project Scientist Glen Langston, Scientist Steve White, Project Manager Matt Morgan, Project Engineer Roger Norrod, System Specifications Sivasankaran Srikanth, EM component Bob Simon, Mechanical Design Eric Bryerton, Noise Calibration Gary Anderson, Lo Design Bob Garwood and Amy Shelton, Data Pipeline Software Mark Whitehead, Software Dennis Egan, Component Construction John Ford and Galen Watts, M&C Hardware Design Patrick Brandt, M&C Software Design Personnel

 Science workshop determined efficiency improvements necessary for K Band: weather, observing requests, mapping programs.  Only enough funds for the receiver only, so the project was de-scoped to seven pixels that meets science objectives as specified in the science case. $1.2 M Total $0.19 M Parts $0.2 M Contingency $0.83 M Labor  The K band seven pixel focal plane array is the path finder instrument: a necessary first step and feasible considering time frame.  Production use by November,  Seven pixel array construction complete December, 2009 K-Band History

Purpose of Review  Given the K-band Focal Plane Array system specifications are derived for a specific scientific case, did the single K-band pixel demonstrate satisfactory performance as the prototype for the seven pixel instrument?  Is the final design of each component in compliance with the system specification? Is there any component that may compromise the instrument’s scientific objectives?  Are the compromises for expansion and decisions to simplify the design justified given the schedule and GBT turret constraints?  Is the schedule achievable, budget and spending reasonable, and are there any obvious critical path items that will compromise the program?  As defined by the observing-mode document, is the pipeline development and data analysis reasonable in its approach? Are there any other modes to be considered?

 Frontend Cryogenic Package Seven Dual Circular Polarization K-Band Pixels Modular Noise Calibration for each Pixel Modular Downconverter for each Channel (14 total) Monitor and Control Electronics LO Distribution and X2 Multiplier for LO1A  Software Package for Engineering M&C Observing Software Manager Data Analysis Pipeline  Cost per Pixel not including NRE. $46 K Parts (Dewar, EM, Isolator, HEMT Amp, WG, Noise Mod, IDM) $8.8K Labor for Construction and Test (Engineer and Technician)  NRE (3 Years). $ 295 K Software Manager and Data Pipeline $ 250 K Engineering $ 127 K Science Deliverables

 02/28/08 Conceptual Design Review.  08/13/08 M&C Hardware Module with support software complete.  08/22/08 Single Pixel Construction Complete.  08/31/08 Initial cool down and measurement.  12/31/08 GBT and Laboratory Tests Complete Milestones

 1/31/09 Critical Design Review  04/01/09 EM Parts Fabrication Complete.  08/04/09 Dewar Assembly Complete.  12/07/09 Hardware Construction w Manager Complete.  01/01/10 System Integration and Lab Tests Complete  02/02/10 Telescope Testing complete.  11/08/10 Commissioning complete. Milestones for Completion

 GBT Observation Results  System Specification and Laboratory Tests  EM Component Results  Noise Module  Integrated Down Converter  Mechanical Design  LO Design  Monitor and Control Hardware  Monitor and Control Software  Data Pipeline CDR Topics

Budget and Expenses All Big Ticket Items Thru 2009

 Smaller Dewar Reduced Cryogenic Loads Smaller Reliable Refrigerator Shared Compressor Weight Reduction  Mechanical Design Individual Thermal Transitions Individual Waveguide Transitions  During expansion seven pixel stays intact Compromises

 Significantly enhanced spectrometer with this new array and existing IF system.  New digital I.F. distribution system. (Spectrometer and technology dependent).  Expanded K-Band Instrument. (Spectrometer and technology dependent).  W-Band Focal Plane Array (Recent 9% surface improvement) FPA Wish List