Tiziana Paccagnella COSMO General Meeting 2006 - Bucharest Report from the Scientific Project Manager 7th COSMO GENERAL MEETING.

Slides:



Advertisements
Similar presentations
CASDA Project Management A presentation to the CASDA Preliminary Design Review IM&T / CASS Dan Miller | CASDA Project Manager 11 March 2014.
Advertisements

1 October 26, th COPS Workshop, Cambridge, UK COPS (Convective and Orographically-induced Precipitation Study) Goal: Advance the quality of forecasts.
COSMO-SREPS COSMO Priority Project C. Marsigli, A. Montani and T. Paccagnella ARPA-SIM, Bologna, Italy.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss The Latent Heat Nudging Scheme of COSMO EWGLAM/SRNWP Meeting,
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
Short-Range NWP Programme 13th SRNWP Meeting 11 October 2006 Zurich (Switzerland)
Expert Team on System Aspects and Interoperability Programme Glenn Greed, UKMO, Project Manager Interoperability Ulrich Schättler, DWD, Chairman of the.
13 ° COSMO General Meeting Rome VERSUS2 Priority Project Report and Plan Adriano Raspanti.
GOVST-V Meeting, Beijing, China, 13 – 17 October 2014 GODAE OceanView V Strategic Plan Introduction and Outlook on Related Discussions for the Week Andreas.
The Preparatory Phase Proposal a first draft to be discussed.
Interoperability between the European NWP modelling systems Ulrich Schättler, François Bouttier, Xiaohua Yang, Radmila Brozkova, Alan Radford A Report.
Numerical Weather Prediction at DWD COSMO-EU Grid spacing: 7 km Layers: 40 Forecast range: 78 h at 00 and 12 UTC 48 h at 06 and 18 UTC 1 grid element:
12° COSMO General Meeting – Moscow Sept 2010 VERSUS2 Priority Project Report Adriano Raspanti.
Science Plan and SPM report COSMO General Meeting, 9 September 2010.
“Initiate the reorganisation and strengthening of the SRNWP Programme” EMN/C27/Doc12 C27 took place the 4-6 April 2006 in Toulouse 13th SRNWP Meeting 12th.
COSMO Annual Meeting September 2005 Zurich (Switzerland) Short-Range Numerical Weather Prediction Programme.
10° COSMO GENERAL MEETING Plans and State of Art at USAM/CNMCA Massimo Ferri.
12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich 6TH COSMO GENERAL MEETING 20 – 23 September 2005 Zurich Report from the Scientific.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Work package 7 Dissemination and Concertation EuropeanaConnect Plenary Meeting Berlin, May 2010 Monika Segbert, Eremo srl.
COSMO-SREPS Priority Project C. Marsigli ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy.
Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Cloud Computing in TTC Kazunori MATSUO, TTC Cloud Computing Advisory Group Document No: GSC16-PLEN-17.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich 6TH COSMO GENERAL MEETING 20 – 23 September 2005 Zurich Suggested Projects for the.
A. Montani. - COSMO-LEPS for Sochi 2014 Development of a LAM-EPS system for Sochi Winter Olympics Andrea Montani C. Marsigli, T. Paccagnella ARPA-SIMC.
9th COSMO General Meeting September 2007 Athens (Greece) Programme Short-Range NWP Report of the Programme Manager.
Overview on the Work of WG 6 Reference Version and Implementation WG Coordinator: Ulrich Schättler.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss SPM report / Science Plan COSMO General Meeting, 10 September.
VERSUS2 – A new priority project for verification Pj Leader – Angela Celozzi.
Overview on the Work of WG 6 Reference Version and Implementation WG Coordinator: Ulrich Schättler.
WG 6 and Support Activities Overview Status Report Reference Version and Implementation WG Coordinator and Project Leader: Ulrich Schättler.
WG 6 and Support Activities Plans for the next Year.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG 3: Overview status report COSMO General Meeting, 19.
COSMO – 09/2007 STC Report and Presentation by Cosmo Partners DWD, MCH, USAM / ARPA SIM, HNMS, IMGW, NMA, HMC.
Status of the COSMO web Cosmin Barbu, Rodica Dumitrache, Bogdan Maco National Meteorological Administration of Romania.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Science Plan, PPs, PTs, and more … COSMO General Meeting,
WP5 – SEE Cluster Policy Learning Mechanisms 3° Steering Committee Meeting Thessaloniki,
WG 6 and Support Activities Overview Status Report Reference Version and Implementation WG Coordinator and Project Leader: Ulrich Schättler.
Overview of WG5 future activities Adriano Raspanti Zurich, September 2005.
Review and outlook COSMO General Meeting, 8 September 2011.
PP CONSENS Merging COSMO-LEPS and COSMO- SREPS for the short-range Chiara Marsigli, Tiziana Paccagnella, Andrea Montani ARPA-SIMC, Bologna, Italy.
Status of the NWP-System & based on COSMO managed by ARPA-SIM COSMO I77 kmBCs from IFSNudgingCINECA COSMO I22.8 kmBCs from COSMO I7 Interpolated from COSMO.
WG4 Oct 2006 – Sep 2007 plans COSMO General Meeting, 21 September 2006 Pierre Eckert.
WG 3: plans for next year COSMO General Meeting 23 September 2005 Marco Arpagaus.
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
WP2 Development and Updating of the Strategic Research Agenda WP leaders: ZonMw and THL Martijntje Bakker, Marja Vaarama & ZonMw-THL-teams.
HIC Meeting, 02/25/2010 NWS Hydrologic Forecast Verification Team: Status and Discussion Julie Demargne OHD/HSMB Hydrologic Ensemble Prediction (HEP) group.
New task within PT Support Activities “Support of COSMO licensees”
Report from the Scientific Project Manager
Responsible member: Hungarian Meteorological Service Period:
New COSMO Procedure COSMO General Meeting, Zürich September 2005.
THORPEX-Europe Meeting Summary Dale Barker
WP1 Vidyo Meeting 16 October 2018
CBP Biennial Strategy Review System
Report of the Scientific Project Manager 6th COSMO General Meeting
Preliminary test for the development of a 2.8km ensemble over Italy
NWP Strategy of DWD after 2006 GF XY DWD Feb-19.
COSMO Projects th COSMO GENERAL MEETING
Ulrich Schättler Source Code Administrator
Selected Priority Projects
Strategy for the coming years
The COSMO Coding Standards Some Highlights
Guidelines for future developments Tiziana Paccagnella, ARPA-SIM
COSMO General Meeting Zurich 2005
Overview of WG3a activities Upper air physical aspects
Activities of WG7 Chiara Marsigli.
Support Activities and WG 6 Overview Status Report
Presentation transcript:

Tiziana Paccagnella COSMO General Meeting Bucharest Report from the Scientific Project Manager 7th COSMO GENERAL MEETING 18 – 21 September 2006 Bucharest Tiziana Paccagnella ARPA-SIM

Tiziana Paccagnella COSMO General Meeting Bucharest Report from the Scientific Project Manager Scientific activities will be presented by WP coordinators and by our colleagues. I will report only general comments about our activities during the past year

Tiziana Paccagnella COSMO General Meeting Bucharest Boundary Conditions for activities planning in COSMO Perspectives in European Numerical Forecasting  GCM  10 km horiz. resolution  LAM  ~1 km horiz. Resolution  Assimilation of frequent/high density data  New developments are required in the new generation of models  Direct model output attractive for users (hydrology, air quality)!!!  New evaluation/verification procedures  Model adaptation/probabilistic interpretation  Increasing development of Ensemble Prediction Systems both as a complement of deterministic forecasting and for assimilation systems

Tiziana Paccagnella COSMO General Meeting Bucharest COSMO Longer-term perspectives (3-5 years) 1. Develop and improve ensemble prediction systems based on LM (including cloud resolving scale) 2. Assimilation of ‘all’ available observations sfc / profiles / radar / satellites… high resolution also slowly-changing information (soil moisture, vegetation state, etc) 3. LM performance known, critically discussed and improved Need for more collaboration with other Consortia Mathias Rotach Talk

Tiziana Paccagnella COSMO General Meeting Bucharest Priority Projects  To better concentrate joint COSMO efforts  To optimize the use of COSMO human resources  To facilitate management related to goals which are Considered to be prioritary Priority Projects introduced in 2005 Problems related to many activities and lack of resources

Tiziana Paccagnella COSMO General Meeting Bucharest The present scientific organization of COSMO WG1WG2WG3WG4WG5WG6 Scientific Working Groups COSMO Priority Projects TACKLE DEFICIENCES IN QPF RK LM_Z 1DVAR FOR SATELLITE DATA SIR SUPPORT ACTIVITIES – WG6 UTCS INTERPRETATION SREPS COMMON VERIFICATION – CONDITIONAL VERIFICATION

Tiziana Paccagnella COSMO General Meeting Bucharest  16th Meeting of the COSMO STC Zürich, December 1 and 2, 2005  12th Meeting of the COSMO SAC DWD - Offenbach, 3-4 May 2006  13th Meeting of the COSMO SAC ARPA-SIM - Bologna, 7-8 Sept  17th Meeting of the COSMO STC Bucharest, General Meeting 2006 & WGs and Projects meetings & Reporting

Tiziana Paccagnella COSMO General Meeting Bucharest 12th Meeting of the Scientific Advisory Committee DWD, Offenbach, 3-4 May th Meeting of the Scientific Advisory Committee ARPA-SIM, Bologna, 7-8 September 2006  Some of the Projects are still suffering for lack of human resources. For some projects we had tasks without FTE committed and other tasks too crowded.  We still have quite relevant problems about communications. Reports are not delivered on time and, in several cases, not delivered at all. : our COSMO spirit should increase!!!

Tiziana Paccagnella COSMO General Meeting Bucharest Necessity to speed-up the procedure to define activities and projects  May 2005  SAC (WP Coordinators + SPM) defines a preliminary list of projects fitting COSMO strategy  General Meeting parallel sessions: collection of proposals and fine- tuning of projects  SAC defines a priority list to be submitted to the decisions of STC  STC selects a limited (one-digit) numbers of “top priority projects”  WP coordinators identify Project Leaders  Project Leaders prepare a detailed Project description and a clear project plan (project activities, human resources, milestones)  STC gives the final approval of the projects  STC members assigns human resources to the projects  Final allocation of FTEs after several iterations  Mid of January 2006  May 2006  The Projects years will be redefined from October to September to be synchronized with the COSMO year.  Projects should be drafted (almost ready) for the SAC meeting of September.  Project drafts will be available on the WEB after the SAC meeting of September.  Projects will be finalized after the contributions coming from the GM discussions  Projects approval by STC will be done at the end of the general meeting.    Feedback by STC to project leaders before October the 15th  The project leaders will interact directly with STC members as regards the allocation of FTEs on the different project  Commitments to PL‘s: Nov 15  Mid November 2006

Tiziana Paccagnella COSMO General Meeting Bucharest 12th Meeting of the Scientific Advisory Committee DWD, Offenbach, 3-4 May th Meeting of the Scientific Advisory Committee ARPA-SIM, Bologna, 7-8 September 2006  The paucity of scientific publications is one of the criticality within COSMO. Scientific papers can be included in the list of deliverables of COSMO projects.  It is important to have on the WEB an updated list of publications related to COSMO and also of presentations at meetings.

Tiziana Paccagnella COSMO General Meeting Bucharest 12th Meeting of the Scientific Advisory Committee DWD, Offenbach, 3-4 May th Meeting of the Scientific Advisory Committee ARPA-SIM, Bologna, 7-8 September 2006  The COSMO WEB: the management of the web is now working but the content must be revised and updated regularly.  It is necessary to have a common name for our model. Different names associated to the different national applications induce confusion in the people outside COSMO.

Tiziana Paccagnella COSMO General Meeting Bucharest 12th Meeting of the Scientific Advisory Committee DWD, Offenbach, 3-4 May th Meeting of the Scientific Advisory Committee ARPA-SIM, Bologna, 7-8 September 2006  Evaluation of the FTE actually devoted to the Projects by the COSMO Partners: the computation has been performed and discussed.  Results will be presented at the STC during the general meeting.

Tiziana Paccagnella COSMO General Meeting Bucharest 12th Meeting of the Scientific Advisory Committee DWD, Offenbach, 3-4 May th Meeting of the Scientific Advisory Committee ARPA-SIM, Bologna, 7-8 September 2006 SRNWP/EWGLAM meeting 2006: COSMO delegation As decided during the 2005 EWGLAM/SRNWP meeting held in Slovenia, each Consortium will have 15 minutes for the presentation by the SPM and 2 hours to give scientific presentations in the following thematic areas:  Assimilation  Numerics and coupling numerics/physics  Physics  Predictability and EPS

Tiziana Paccagnella COSMO General Meeting Bucharest 12th Meeting of the Scientific Advisory Committee DWD, Offenbach, 3-4 May th Meeting of the Scientific Advisory Committee ARPA-SIM, Bologna, 7-8 September 2006 SRNWP/EWGLAM meeting 2006: COSMO delegation  Assimilation C.Schraff : Overview and strategy on data assimilation. The 1DVAR projects to assimilate satellite data. D.Leun: The LHN scheme of COSMO  Numerics and coupling numerics/physics J.Steppeler: Overview and strategy on Numerics. The LMZ including coupling Num. &Phys., D.Cesari: The Semi-Implicit Semi-Lagrangian version of LM_Z  Physics M.Arpagaus: Overview and strategy on LM Physics. D.Mironov: The UTCS project  Predictability and EPS P.Eckert: COSMO ensemble systems C. Marsigli:the COSMO SREPS project

Tiziana Paccagnella COSMO General Meeting Bucharest COSMO Longer-term perspectives (3-5 years) 1. Develop and improve ensemble prediction systems based on LM (including cloud resolving scale) 2. Assimilation of ‘all’ available observations sfc / profiles / radar / satellites… high resolution also slowly-changing information (soil moisture, vegetation state, etc) 3. LM performance known, critically discussed and improved Need for more collaboration with other Consortia Mathias Rotach Talk

Supporting slides