Terra group DESIGN & ENGINEERING DESIGN & ENGINEERING FOR THE ELECTRO-MECHANICAL AND CONTROL SYSTEMS OF TUNNELS.

Slides:



Advertisements
Similar presentations
Installation Department of Turkish State Railways UIC 11th ERTMS World Conference, İstanbul, 2014 ERTMS/ETCS Implementations in Turkey Fatih Sarıkoç Ph.D.
Advertisements

1 Objective  Extend NEWater transmission mains to Jurong Island to meet increasing NEWater demand by industries Scope  6 Contracts km of 2.2m,
If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia.
National Highways Authority of India (Ministry of Road Transport & Highways) Government of India BID DOCUMENT PART – I INSTRUCTIONS TO BIDDERS UPGRADATION.
Regional Transport Projects, Improving the Business Climate by Investing in Modern Transport. Role of the Governments and Opportunities for PPPs Southeast.
Mobility Initiatives in Metro Manila Department of Transportation and Communications 12 March 2014.
BRIEF COMPANY INTRODUCTION
Research Opportunities Workshop 23 September 2011 Tamer KARAKURT/ Savronik Inc. Electrical & Electronics Engineer
Douglas R. Failing, P.E. Executive Director, Highway Program LA Metro’s Highway Program LA Metro’s Highway Program May 10, 2013 Construction Management.
King Fahd University of Petroleum and Minerals Department of Construction Engineering and Management CEM Instructor: Dr. Soliman Al-Mohawis Important.
Urban Development and Infrastructure Policy in Shanghai Ms. Li Xiaonian Faculty of Law, Shanghai Academy of Social Sciences Presented.
© Nintendo Game Document Game Development - Spring
OICA HCV industry input to ACSF informal Group #1 Meeting & 30 in Bonn Informal Document ACSF
The New Epicentre of Growth ONE ENGINE Powering the Growth of the Nation.
1 TURKISH EXPERIENCE IN PUBLIC-PRIVATE PARTNERSHIPS.
 Istanbul Metropolitan Municipality (IMM) holds a very important place in local administration organization of Istanbul.  IMM has 27 municipal enterprises,
Imagine the result European Infrastructure Friedrich Schneider, Executive Board Member August 4, 2010.
Continuing education for highway building specialists Author:Julius Christauskas Vilnius Gediminas Technical University.
/ Nygård Magnus Traffic management in a DBFM project - CASE E18 Muurla-Lohja Finland.
WORKING WITH ASIAN DEVLOPMENT BANK  BOARD OF TRADE OF METROPOLITAN MONTREAL September 22 nd 2015.
1/68 november 2005 The TAV experience: the relationship between awarding authority and General Contractor Antonio Savini Nicci Managing Director of TAV.
ITA Croatia TÜLİN SOLAK Temelsu International Engineering Services Inc. Congress centre “Lacroma”, Dubrovnik April, 7-9, 2011 ITA Croatia “TUNNELING ACTIVITIES.
Bentley Civil - What Users Say “Track design for a stretch of 8 Km which used to take more than 6 months, was completed in less than 3 months with solutions.
UNITY IN DIVERSITY LEKOA VAAL ROAD BUILDING UNIT DEVELOPMENT PROGRAMME.
Scottish Experience in Procurement and EIA of Roads EIA and Early Market Involvement IAIA 2007.
PROJECTED NEED For those looking for a career in mechanical engineering, we have good news! Jobs are in excess in today's job market.
Y.A. Khulief 1 MECHANICS OF MACHINES ME-309 Yehia A. Khulief, PhD, PE Professor Mechanical Engineering, KFUPM Room , Tel: 2327.
Procurement Authority Representative Roles and Responsibilities Amanda Price, Program Development Coordinator, Planning and Programming, Transportation.
LA Metro’s Highway Program May 29, 2014
赴国际水稻所访学情况汇报 长江大学农学院 邢丹英 2010 年 6 月. 学习目的 学习时间、地点 学习内容 学习收获 几点体会 汇报提纲.
Project schedule and status R. Guida, F. Ravotti, D. Pfeiffer November 14th, 2012 GIF++ users meeting.
ETC in Japan Wide Variety of Tolling Application KUNIAKI NAKAMURA Chief Engineer Maintenance and Traffic Department Nihon Doro Kodan (Japan Highway Public.
GREENFIELD FOR INDUSTRIAL AND LOGISTIC DEVELOPMENT.
Providing Services to the Energy Industry Presentation By EPCM Consultants Pty Ltd EPCM Consultants Pty Ltd Comdain Group.
/ Laura SundellNational guidelines, Finland 1 Laura Sundell, Mikko Karhunen Finnish Road Administration
Egnatia Odos S.A. Operation & Maintenance Division BSRH Joint Permanent Technical Secretariat EGNATIA ODOS Operation & Maintenance Athanasios Matthaiou.
A Case Study of Promoting Metropolitan Freight Collaboration: The Twin Cities Experience Overview Minnesota Department of Transportation Metropolitan Council.
CI1697-R: Bridge Modeling Approaches Dave Simeone – Senior Product Manager, AutoCAD Civil 3D Edmundo Herrera – Autodesk Technical Specialist, Transportation.
Dr. T.N.Singh Professor Rock Mechanics, Natural disaster, Climate change, Mining Research, Surface Mining.
1 ROAD PAVEMENTS FORUM FEEDBACK ON REVISION / AMENDMENTS OF STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE WORKS FOR STATE ROAD AUTHORITIES (COLTO) By: JC.
/ Reijo Prokkola Procurement of real-time travel times in Finnra.
MECHANICS OF TRANSPORT Maria Christodoulou ENG160 01/02/2010.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Bridge Maintenance and Inspection Responsibilities Technical.
南水北调东线第一期工程山东段 情况简介. 主要汇报内容 二、南水北调山东段工程总体布置 三、山东段工程项目划分及工程主 要建设内容 一、南水北调东线工程概况 四、前期工作及工程建设进展情况 五、工程总投资.
Mini-Competition Process. Process Outline  Write work package brief  Decide on pricing mechanism (Option A, C, E or G)  Decide quality/price ratio.
Banihal Tunnel (Banihal-Qazigund)- Jammu & Kashmir Project :Independent Engineer Services for Four laning of Quazigund to Banihal section from Km
English for Engineering Management ( 1 ) Detail 1-1 Fill out the missing words on the drawing (5 are missing) Where is the detail located on the building?
Minimum Set of Requirements for Suppliers
OUR COUNTRY : TURKEY.
Minimum Set of Requirements for Suppliers
University of Calgary Continuing Education
Project Model – Ongoing Operations
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
this file is formatted in size 70x100 cm
Asset Management Policy
ارگونومی کار با کامپیوتر
Team 1 Design Team 4 Inc Team 3 LLC Team 7 Global Team 11 Design
Signal Conditioning.
Strategic Road Projects
Dr. N. S. Harding Chemical Engineering 477 March 8, 2018
5th Review Committee October 4th, 2004 Facilities and Schedule C
Engine Part ID Part 1.
Engine Part ID Part 2.
Engine Part ID Part 2.
Buildings Entrance Tunnel. 5th Review Committee October 4th, 2004 Buildings, Facilities and Schedule C. Sanelli.
For More Details:
The Players OWNER/CLIENT Construction Manager (CM)
Outputs Estimated Tendering Process Timeline (16 – 31 weeks)
WUL Monolith Inner & Outer Shielding
Presentation transcript:

terra group DESIGN & ENGINEERING DESIGN & ENGINEERING FOR THE ELECTRO-MECHANICAL AND CONTROL SYSTEMS OF TUNNELS

T E R R A G R O U P L o c a t e d i n I s t a n b u l T o t a l 3 5 P e o p l e C o n s u l t i n g a n d E n g i n e e r i n g

E L E C T R O – M E C H A N I C A L D E S I G N P R O J E C T & C O N T R A C T M A N A G E M E N T C O N S T R U C T I O N M A N A G E M E N T E X P E R T I S E

A C T I V I T Y F I E L D S I N D U S T R I A L C O N S T R U C T I O N H O S P I T A L S B U I L D I N G S T U N N E L S

F e a s i b i l i t y S t u d y D e s i g n P r e p a r a t i o n o f T e n d e r D o c u m e n t s

R E F E R E N C E T U N N E L P R O J E C T S K A V A C I K C I T Y T U N N E L S, I S T A N B U L, T U R K E Y A N T A L Y A – A L A N Y A M O T O R W A Y T U N N E L S, A N T A L YA, T U R K E Y K A D I K O Y – K A R T A L M E T R O P R O J E C T S, I S T A N B U L, T U R K E Y B L A C K S E A M O T O R W A Y T U N N E L S, C A M B U R N U, T U R K E Y I G D I R H I G H W A Y T U N N E L S, B U R S A, T U R K E Y M E K E C E T U N N E L, B İ L E C İ K, T U R K E Y P O Z A N T I T U N N E L S, K A Y S E R İ, T U R K E Y D U B A I M E T R O T U N N E L S, D U B A I

K A V A C I K C I T Y T U N N E L S / I S T A N B U L, T U R K E Y Project : 1,5 km road tunnel Owner: Turkish Road Authorities Scope : detail design of the of work electro mechanical works Period:

A N T A L Y A – A L A N Y A M O T O R W A Y TU N N E L S, A N T A L Y A, T U R K E Y Project : 6,1 km road tunnel Owner: Turkish Road Authorities Scope of: Preperation of tender Work documents Period: 2007

Project: 6,1 km Metro Tunnel Owner: Istanbul Metropolitan Municapility Scope: Design Works of of work Electro-Mechanical Systems period: ongoing K A R T A L–K A D I K Ö Y M E T R O P R O J E C T, I S T A N B U L, T U R K E Y

Project: 590 m road tunnel Owner: Turkish road authorities Scope : Detail design of Work works J.V-Partner: convex period: Ç A M B U R N U T U N N E L, B L A C K S E A, T U R K E Y

Project: 1,1 km Road Tunnel Owner: Turkish highway authorities Scope : preperation of of Work tender documents J.V.-Partner: convex Period: 2005 I G D I R T U N N E L S, B U R S A, T U R K E Y

Project: 6,1 km raod tunnel owner: Turkish road authorities J.V.-Partner: convex Scope : preperation of of work tender documents period: 2007 M E K E C E T U N N E L S, B İ L E C İ K, T U R K E Y

Project: 9,6 km raod tunnel owner: Turkish road authorities Scope : Design and engineering of work of electro-mechanical systems period: 2007 P O Z A N T I T U N N E L S, A D A N A T U R K E Y

Project: 69,4 km Owner: Dubai State Scope of work: preperation of tender documents period: 2005-on going D U B A I M E T R O P R O J E C T, D U B A I