ALICE Computing Model A pictorial guide. ALICE Computing Model External T1 CERN T0 During pp run i (7 months): P2: data taking T0: first reconstruction.

Slides:



Advertisements
Similar presentations
Status GridKa & ALICE T2 in Germany Kilian Schwarz GSI Darmstadt.
Advertisements

T1 at LBL/NERSC/OAK RIDGE General principles. RAW data flow T0 disk buffer DAQ & HLT CERN Tape AliEn FC Raw data Condition & Calibration & data DB disk.
CHEP04 - Interlaken - Sep. 27th - Oct. 1st 2004T. M. Steinbeck for the Alice Collaboration1/20 New Experiences with the ALICE High Level Trigger Data Transport.
December Pre-GDB meeting1 CCRC08-1 ATLAS’ plans and intentions Kors Bos NIKHEF, Amsterdam.
CERN/IT/DB Multi-PB Distributed Databases Jamie Shiers IT Division, DB Group, CERN, Geneva, Switzerland February 2001.
WLCG/8 July 2010/MCSawley WAN area transfers and networking: a predictive model for CMS WLCG Workshop, July 7-9, 2010 Marie-Christine Sawley, ETH Zurich.
ALICE DATA ACCESS MODEL Outline ALICE data access model - PtP Network Workshop 2  ALICE data model  Some figures.
BESIII computing 王贻芳. Peak Data volume/year Peak data rate at 3000 Hz Events/year: 1*10 10 Total data of BESIII is about 2*640 TB Event size(KB)Data volume(TB)
Tom Dietel University of Cape Town for the ALICE Collaboration Computing for ALICE at the LHC.
ALICE data access WLCG data WG revival 4 October 2013.
G.Rahal LHC Computing Grid: CCIN2P3 role and Contribution KISTI-CCIN2P3 Workshop Ghita Rahal KISTI, December 1st, 2008.
ALICE Roadmap for 2009/2010 Patricia Méndez Lorenzo (IT/GS) Patricia Méndez Lorenzo (IT/GS) On behalf of the ALICE Offline team Slides prepared by Latchezar.
Data Import Data Export Mass Storage & Disk Servers Database Servers Tapes Network from CERN Network from Tier 2 and simulation centers Physics Software.
Belle II Data Management System Junghyun Kim, Sunil Ahn and Kihyeon Cho * (on behalf of the Belle II Computing Group) *Presenter High Energy Physics Team.
LCG Plans for Chrsitmas Shutdown John Gordon, STFC-RAL GDB December 10 th, 2008.
ALICE Upgrade for Run3: Computing HL-LHC Trigger, Online and Offline Computing Working Group Topical Workshop Sep 5 th 2014.
ICHEP06, 29 July 2006, Moscow RDIG The Russian Grid for LHC physics analysis V.A. Ilyin, SINP MSU V.V. Korenkov, JINR A.A. Soldatov, RRC KI LCG.
Status of the production and news about Nagios ALICE TF Meeting 22/07/2010.
Predrag Buncic CERN ALICE Status Report LHCC Referee Meeting September 22, 2015.
What is expected from ALICE during CCRC’08 in February.
Production status Preparation for HI running ALICE TF+AF November 14, 2010.
DPS/ LCG Review Nov 2003 Working towards the Computing Model for CMS David Stickland CMS Core Software and Computing.
CERN IT Department CH-1211 Genève 23 Switzerland t Frédéric Hemmer IT Department Head - CERN 23 rd August 2010 Status of LHC Computing from.
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
Planning and status of the Full Dress Rehearsal Latchezar Betev ALICE Offline week, Oct.12, 2007.
Marco Cattaneo LHCb computing status for LHCC referees meeting 14 th June
Report to Worldwide Analysis Review Panel J. Harvey 23 March 2000 Slide 1 LHCb Processing requirements Focus on the first year of data-taking Report to.
2012 RESOURCES UTILIZATION REPORT AND COMPUTING RESOURCES REQUIREMENTS September 24, 2012.
CBM Computing Model First Thoughts CBM Collaboration Meeting, Trogir, 9 October 2009 Volker Friese.
Predrag Buncic Future IT challenges for ALICE Technical Workshop November 6, 2015.
NA62 computing resources update 1 Paolo Valente – INFN Roma Liverpool, Aug. 2013NA62 collaboration meeting.
20 Dec Peter Clarke Computing production issues 1.Disk Space – update from high-mu workshop 2.Disk planning 3.Use of T2s NCB meeting 20-Dec-2010.
Large scale data flow in local and GRID environment Viktor Kolosov (ITEP Moscow) Ivan Korolko (ITEP Moscow)
Materials for Report about Computing Jiří Chudoba x.y.2006 Institute of Physics, Prague.
LCG-LHCC mini-review ALICE Latchezar Betev Latchezar Betev for the ALICE collaboration.
CMS Computing Model summary UKI Monthly Operations Meeting Olivier van der Aa.
David Stickland CMS Core Software and Computing
GridKa Summer 2010 T. Kress, G.Quast, A. Scheurer Migration of data from old to new dCache instance finished on Nov. 23 rd almost 500'000 files (600.
Predrag Buncic ALICE Status Report LHCC Referee Meeting CERN
ATLAS Distributed Computing perspectives for Run-2 Simone Campana CERN-IT/SDC on behalf of ADC.
Predrag Buncic CERN ALICE Status Report LHCC Referee Meeting 01/12/2015.
Ian Bird WLCG Networking workshop CERN, 10 th February February 2014
Victoria, Sept WLCG Collaboration Workshop1 ATLAS Dress Rehersals Kors Bos NIKHEF, Amsterdam.
ALICE experiences with CASTOR2 Latchezar Betev ALICE.
Ian Bird, CERN WLCG LHCC Referee Meeting 1 st December 2015 LHCC; 1st Dec 2015 Ian Bird; CERN1.
LHCb Current Understanding of Italian Tier-n Centres Domenico Galli, Umberto Marconi Roma, January 23, 2001.
Computing Model José M. Hernández CIEMAT, Madrid On behalf of the CMS Collaboration XV International Conference on Computing in High Energy and Nuclear.
16 September 2014 Ian Bird; SPC1. General ALICE and LHCb detector upgrades during LS2  Plans for changing computing strategies more advanced CMS and.
Status of GSDC, KISTI Sang-Un Ahn, for the GSDC Tier-1 Team
1 June 11/Ian Fisk CMS Model and the Network Ian Fisk.
Domenico Elia1 ALICE computing: status and perspectives Domenico Elia, INFN Bari Workshop CCR INFN / LNS Catania, Workshop Commissione Calcolo.
WLCG November Plan for shutdown and 2009 data-taking Kors Bos.
May 23, 2007ALICE DOE Review - Computing1 ALICE-USA Computing Overview of Hard and Soft Computing Resources Needed to Achieve Research Goals 1.Calibration.
ATLAS Computing: Experience from first data processing and analysis Workshop TYL’10.
Predrag Buncic CERN Plans for Run2 and the ALICE upgrade in Run3 ALICE Tier-1/Tier-2 Workshop February 2015.
LHCb Computing 2015 Q3 Report Stefan Roiser LHCC Referees Meeting 1 December 2015.
Predrag Buncic CERN ALICE Status Report LHCC Referee Meeting 24/05/2015.
ATLAS – statements of interest (1) A degree of hierarchy between the different computing facilities, with distinct roles at each level –Event filter Online.
Ian Bird WLCG Workshop San Francisco, 8th October 2016
Predrag Buncic ALICE Status Report LHCC Referee Meeting CERN
Workshop Computing Models status and perspectives
LHC experiments Requirements and Concepts ALICE
ATLAS activities in the IT cloud in April 2008
Bernd Panzer-Steindel, CERN/IT
Offline data taking and processing
The Data Lifetime model
ALICE Computing Model in Run3
ALICE Computing Upgrade Predrag Buncic
Near Real Time Reconstruction of PHENIX Run7 Minimum Bias Data From RHIC Project Goals Reconstruct 10% of PHENIX min bias data from the RHIC Run7 (Spring.
The ATLAS Computing Model
Presentation transcript:

ALICE Computing Model A pictorial guide

ALICE Computing Model External T1 CERN T0 During pp run i (7 months): P2: data taking T0: first reconstruction T1: additional reconstructions & analysis T2: MC & analysis DAQ farm HLT farm Disk buffer 50 TB P2 T0/PAF farm Disk buffer 200 TB T1 farm MSS 4 RAW: 100 MB/s MSS 1.3 PB RAW: 0.8 Gb/s Export RAW + ESD : 0.5 Gb/s 1 st reconstruction i: RAW -> ESD Disk 4 N th reconstruction i-1: RAW -> ESD Import RAW + ESD : 4 Average re-processing =3 External T2s T2 farm Disk Export 0.1 Gb/s Import 0.03 Gb/s Export 0.1 Gb/s Import 0.3 Gb/s

ALICE Computing Model CERN Computing Center PAF Disk buffer 240 TB Disk MSS 2.3 TB DAQ farm HLT farm Disk buffer 50 TB P2 RAW: 1.25 GB/s RAW: 10 Gb/s External T1s T1 farm MSS 4 Export RAW : 0.5 Gb/s Disk 4 N th reconstruction i-1: RAW -> ESD Import RAW + ESD : 4 Average re-processing =3 External T2s T2 farm Disk Export 0.1 Gb/s Import 0.03 Gb/s Export 0.1 Gb/s Import 0.3 Gb/s During AA run i (1 months): P2: data taking T0: Fast analysis with PAF T1: additional reconstructions & analysis T2: MC & analysis

ALICE Computing Model External T1 CERN T0 T0 farm T1 farm MSS 4 MSS 1.3 PB Export RAW + ESD : 0.5 Gb/s 1 st reconstruction AA i: RAW -> ESD Disk 4 N th reconstruction i-1: RAW -> ESD Import RAW + ESD : 4 Average re-processing =3 External T2s T2 farm Disk Export 0.1 Gb/s Import 0.03 Gb/s Export 0.1 Gb/s Import 0.3 Gb/s During Shutdown (4 months): T0: First AA reconstruction T1: additional reconstructions & analysis T2: MC & analysis