THEMIS/GBO KickOff 1 UCB, June 2, 2003 Ground Based Observatories (GBO)

Slides:



Advertisements
Similar presentations
RIT Senior Design Project D3 Engineering Camera Platform Friday October 9, :30 to 1:00pm.
Advertisements

A new Network Concept for transporting and storing digital video…………
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 GROUND MAGNETOMETER GBO DESIGN.
Testing of a Cellphone-based Cosmic-ray Detector Network Steven Wright, Zach Irwin, Charlie Steingard, Max Caplow, David Olin, Jesse Silva Wildwood School,
EMI Systems Limited specializes in CCTV surveillance systems that ranges from stand-alone cameras to fully integrated security control centers and to the.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) All Sky Imager Design Stewart Harris - UCB.
Digital Photography By Mike Volker. What is Digital Photography? A form of Photography that uses digital technology to make images of subjects Replaced.
Improving Networks Worldwide. UNH InterOperability Lab Serial Advanced Technology Attachment (SATA) Use Cases.
Chapter 1: Introduction Business Data Communications, 4e.
Remote Surveillance System Presented by: Robarin Holdings Limited Telephone: Facsimile:
ⓒ 2011 Zalman Tech Co., Ltd. ZM-VE300 External HDD Case / Virtual Drive ZM-VE ⓒ 2010 Zalman Tech Co., Ltd. ZM-VE300 External HDD Case / Virtual.
 Wireless, Web-Based Monitoring System  Alarm/Event Notifications by Text Message and or  VPN Connection for Fast Response to Alarms and Events.
1 ECE Department Thermal Mapping Drone Team 17 Jamyang Tenzin Stefan Totino Dylan Fallon Jason Fellow Advisor: Joseph Bardin.
THEMIS/GBO Engineering Peer Review CTR - 1 UCB, Oct 17, 2003 GBO/EPO Magnetometers: Overview C. T. Russell.
UNH InterOperability Lab Serial Advanced Technology Attachment (SATA) Use Cases.
ⓒ 2012 Zalman Tech Co., Ltd. ZM-VE400 Virtual Drive + External HDD Case Sales Guide.
H x Outdoor Speed Dome IP Camera
SG-VoIP Page 1 / 14 PLANET Pan / Tilt Internet Camera Internet Surveillance Solution.
Net-960CE-X Windows CE Mobile Data Terminal
THEMIS/GBO CDR Peer Review 1 Univ. of Calgary, Apr , 2004 Ground Magnetometer David Pierce UCLA.
System Elements HighPoint Broadband Delivery System Sector 1 Sector 3
SCIENTIST WORK STATIONS Advanced display tools will build on current software to allow for integrated displays of data from onboard instrumentation (e.g.,
Internet Camera Winco (Pacific) Limited Excellent Surveillance Solution.
[1] Reference: QCam API reference manual document version Charge Coupled Device (CCD)
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Observatory System Design Stewart Harris - UCB.
Fick Observatory - Boone, IA. Observatory Automation ongo02e March 26, 2002 Faculty advisor: Dr. John P. Basart Client: Joe Eitter ISU Physics Department.
THEMIS/GBO CDR Peer Review 1 Univ.of Calgary, Apr , 2004 Ground Based Observatories (GBO) CDR Peer Review S. B. Mende University of California -
Need to enhance your network?
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Observatory System Design Stewart Harris - UCB.
THEMIS/GBO CDR Peer Review 1 Univ.of Calgary, Apr , 2004 GBO Deployment Plans and Status Canada Sites Mike Greffen THEMIS Canada Site Operations.
PCDVR NH5000/6000 Pro Series MODELNH-5004NH-5008NH-5016NH-6008NH-6016 VIDEO Video Input4 ch8 ch16 ch8 ch16 ch Loop Output (Option)4 ch8 ch16 ch8 ch16 ch.
Copyright © PLANET Technology Corporation. All rights reserved. H meter IR Internet Camera ICA-H312.
Digital Camera Overview IT 130 Web Graphics and Multimedia.
WebCCTV 1 Quadrox WebCCTV Network Video Recording Reseller Training Quadrox January 2006.
THEMIS/GBO CDR 1 UC Berkeley, June 17, 2004 Ground Based Observatories (GBO) CDR S. B. Mende University of California - Berkeley.
1 TRADITIONAL CONFIGURATION (external GSM modem) Requirements: RS232 serial communication port available on the device (built-in or added by installing.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Program Schedule and Status Stewart Harris.
SAY CHEESE! The Digital Camera By Jean Waldrop ETEC 562 Spring 2004.
1 Weblite Product Introduction. 2 Control Equipment via the Internet 8 Universal Inputs 8 Universal Outputs software selectable as analog or digital signals.
THEMI GBO meeting 1 UCB 06/02/2003 THEMIS Ground Based Observatories S. B. Mende.
THEMIS/GBO CDR Peer Review 1 Univ. of Calgary, Apr , 2004 Alaska Ground Based Observatories (with E/PO involvement) GBO Peer Review April 27, 2004.
THEMIS Workshop 1 UC Berkeley, 18 December 2004 Data Products and Access Tim Quinn UC Berkeley.
THEMIS PROJECT NAS UCB, June 2003 Science Operations Tim Quinn 4 June 2003.
UNIT I. EMBEDDED SYSTEM It is an electrical/electro-mechanical system designed to perform a specific function. It is a combination of hardware and software.
Digital Imaging, Photography, Videography. Photography Writing with light.
THEMIS/GBO 1 Banff, March 29, 2006 Agenda – GBO Review.
THEMIS/GBO CDR Peer Review 1 Univ. of Calgary, Apr , 2004 Ground Based Observatories (GBO) MCDR Stewart Harris.
Principles of Information Technology Module 4 Test Review Peripheral Devices.
Hardware Introduction – Standard vs Q.i
THEMIS/GBO Review 1 Banff, March 29, 2006 Ground Based Observatories (GBO) System Design Overview Operational Status Lessons Learned S. E. Harris University.
THEMIS/GBO CDR 1 UC Berkeley, June 17, 2004 Ground Based Observatories (GBO) CDR S. B. Mende University of California - Berkeley.
THEMIS/GBO Site Tour 1 January 2006 Ground Based Observatories (GBO) Tour of Current Sites (Jan ‘06) Stewart Harris.
Jonathan Harvey Webcams. What is a webcam? A webcam is basically a video camera that has a connection with your computer. Hook it up, turn it on, and.
Ground Based Observatories (GBO) All Sky Imager Design Stewart Harris - UCB _101220_ATHA.
Colorado State University Paul Scholz, Tyler Faucett, Abby Wilbourn, Michael Somers June
THEMIS Prototype Imager [ initial field testing ].
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Engineering Peer Review Oct. 17, 2003 Field Site Deployment/Operations.
Product Overview Presentation Issue 1.0 9/4/07 External distribution MKT-SD-P-001E.
Internet Camera 2/11 InternetSecurityCameraInfoModule.
Telescope Design Matt Watwood Phys Purpose To have the capability of photographing nebula and other deep space objects To be portable and compact.
Digital-watchdog.com DWC-MF10M36TIR DWC-MF10M8TIR DWC-MF10M28T Presenter’s Name Title | Rev : 04/15 Product Overview 720P Network.
Internet Camera 2/11 SecurView Software Windows PC based management software Complimentary software is included with each SecurView camera Manage up to.
Welcome To Digibroadcast Company Limited
Canadian Magnetometry for THEMIS: CANOPUS Magnetometer Array Update Ian R. Mann, D.K. Milling, A. Kale, I.J. Rae, T.M. Loto’aniu Dept. of Physics, University.
Night Sky Video Observation Equipments  Video cameraVideo camera  LensLens  A/D converterA/D converter  PC for UFOCapturePC for UFOCapture  Housing/MountHousing/Mount.
April / 2010 UFOCapture 1 UFOCaptureV2 Time-Shift-Motion-Detect-Video-Recording software for complete records of un-expected events.
CCTV - Security Cameras
UFOCaptureV2 Time-Shift-Motion-Detect-Video-Recording software for complete records of un-expected events April / 2010 UFOCapture.
SMCWIPCFN-G2 Wireless IP Camera Key Features and Benefits
UCLA Support for THEMIS
Presentation transcript:

THEMIS/GBO KickOff 1 UCB, June 2, 2003 Ground Based Observatories (GBO)

THEMIS/GBO KickOff 2 UCB, June 2, 2003 Ground Based Observatories Observatory elements Environmental enclosure All Sky Imager (ASI) Ground Magnetometer (GMAG) GPS receiver for time sync Method for unattended Data Collection Stream 1 compressed data daily transmission Stream 2 high res. data periodic collection

THEMIS/GBO KickOff 3 UCB, June 2, 2003 GBO Site Requirements All Sky viewing Minimal local light contamination Clear of magnetic interference Power (120V, 60Hz, TBD Amps) Telephone line

THEMIS/GBO KickOff 4 UCB, June 2, 2003 Observatory Enclosure Req’s. Operate in external temperature range of -60° to +50°C (TBR) Maintain appropriate internal temperature (~ 20°) Compatible with ASI dome, provide heated air flow Provide controlled internal airflow to prevent overheating. Suitably rugged, stable mounting, shock protection

THEMIS/GBO KickOff 5 UCB, June 2, 2003 All Sky Imager All Sky Lens AGO heritage “Starlight-Xpress” MX716 Cooled CCD 16-bit pixel data 752 x 580 format

THEMIS/GBO KickOff 6 UCB, June 2, 2003 ASI Camera

THEMIS/GBO KickOff 7 UCB, June 2, 2003 GBO Computer Candidate DataLux DataBrick III Pentium III Compact size Low power (18 W) Rugged, shock mounted internal HDD Operating Temp: 0º to 50º C Storage Temp: -20º to 65º C Built-in Thermal Management OS: Win98/2000/XP, or Linux

THEMIS/GBO KickOff 8 UCB, June 2, 2003 GBO Computer DataLux DataBrick III Dimensions: 264 x 140mm

THEMIS/GBO KickOff 9 UCB, June 2, 2003 Computer I/O Serial USB 10/100Base-T PCMCIA Ports Available All Sky Imager Ground Magnetometer GPS VSAT Phone Line Modem Swappable HDD 2212      

THEMIS/GBO KickOff 10 UCB, June 2, 2003 Site Software Functional Req. Instrument Control ASI Exposure/Rep Rate GPS Setup GMAG? Synoptic Data Recording ASI –Full resolution –Stream 1 compression GMAG GPS time sync Data Transfer Stream 1 –VSAT –Phone Line –IRIDIUM Stream 2 –Swappable HDD Management Operates on Time Line Remote Control Capable

THEMIS/GBO KickOff 11 UCB, June 2, 2003 Data Archival Stream 1 Capture 39 Mbit/day per station (20 stations) Stream 2 Capture 63 Gbyte/season

THEMIS/GBO KickOff 12 UCB, June 2, 2003 Schedule

THEMIS/GBO KickOff 13 UCB, June 2, 2003 Communication THEMIS ftp site ftp://apollo.ssl.berkeley.edu/pub/THEMIS/

THEMIS/GBO KickOff 14 UCB, June 2, 2003 Communication list server, visit web site and suscribe: