Non-EC R&D KEK Junji Urakawa 2011.7.7 at INFN. Discussing issues : 1. Experimental confirmation for the threshold of Fast ion instability Need clear data.

Slides:



Advertisements
Similar presentations
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
Advertisements

Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
1 Experience at ATF To get a low emittance beam Junji Urakawa KEK Circumference: m Arc Cell Type: FOBO Number of Arc Cells: 36 Energy: GeV.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Fast Ion Instability Studies in ILC Damping Ring Guoxing Xia DESY ILCDR07 meeting, Frascati, Mar. 5~7, 2007.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ATF DR Overview Introduction Low emittance history Present status S.Kuroda ( KEK ) GDE Review 3rd Apr.2013.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
Damping Ring S. Guiducci AAP Review Tsukuba 20 April 2009.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
Status of ATF Fast Kicker Experiment
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF Fast Ion Study Plan N.Terunuma (KEK) Results in 2007, 2008 Vertical emittance studies at ATF Plan.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
2016/3/31 Fast kicker Experiment at ATF ATF2 - 40nm beam production, measurement Extraction kicker The difficulty of the beam extraction is that the kick.
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
ILC Damping Ring Test Facilities Status Report Mark Palmer Cornell University May 9, 2009 ILC PAC Review, Vancouver.
Damping Ring Session Summary S. Guiducci TILC09 Tsukuba 21 April 2009.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Emittance reduction by a SC wiggler in the ATF-DR September 16 th, 2009 Yannis PAPAPHILIPPOU and Rogelio TOMAS ATF2 weekly meeting.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
Accumulator & Compressor Rings with Flexible Momentum Compaction arccells MAP 2014 Spring Meeting, Fermilab, May 27-31, 2014 Y. Alexahin (FNAL APC)
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
ATF2 Status N.Terunuma, KEK
Expected hardware status and Priority of the commissioning task
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Status of Fast Ion Instability Studies
CLIC Damping ring beam transfer systems
Coupling Correction at the Australian Synchrotron
Fast Ion Experiments at ATF
Junji Urakawa (KEK) for ATF International Collaboration
Strip-line Kicker R&D at KEK-ATF
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
Junji Urakawa ( for collaborators ) March KEK at LNF
Feed forward orbit corrections for the CLIC RTML
Instability measurement plans at ATF
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Status of CTC activities for the Damping rings
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
Evaluation of 1GHz vs 2GHz RF frequency in the damping rings
Presentation transcript:

Non-EC R&D KEK Junji Urakawa at INFN

Discussing issues : 1. Experimental confirmation for the threshold of Fast ion instability Need clear data sets to benchmark the programs. 2. Fast kicker development Need long term reliability check of fast kicker pulsers 3. Impedance measurement of fast kicker strip-line Planning to do it at ATF2 beam line 4. Tuning method confirmation for 2pm vertical emittance realization in the ring. 5. Beam instrumentation development Miscellaneous Circumference correction by chicanes in the ring Wiggler effect Multi-bunch instability precise study

3 Study on the fast ion instability at ATF ATF 2004 Distinguish the two ion effects: beam size blow-up and dipole instability. Quantify the beam instability growth time, tune shift and bunch train gap effect Provide detailed data to benchmark simulations with experiment. In this June, we measured ~30pm vertical emittance by X-SR and have to confirm this value by laser wire. When we will get the stable beam with low emittance less than 10pm, We will do the fast ion study again.

Measured in DR, 2003 Single bunch ATF achieved about 4pm vertical emittance but we could not reproduce it from 2006 and the measured vertical emittance is about 20pm usually. We checked the damping ring to find the reason and will realign all magnets of DR in this summer shutdown precisely. Necessary works - optics retuning - beam based realignment - BPM re-positioning Emittance tuning at ATF long time ago

ATF vertical emittance

Devices for FII study One Path One Path & multi-turn Superposition of multi-turn

BPM signals are memorized into Oscilloscope (DPO7254, 0.1ns time resolution) during turns and we can observe beam oscillation. Measurement of beam position bunch by bunch Horizontal pos. (w/o kick) Horizontal pos. (with kick) 1st bunch 2nd bunch 3rd bunch When we gave the dipole oscillation to second bunch, we observed no oscillation on 1 st and 3 rd bunches. Three bunch signals from button electrode with 2.8ns bunch spacing.

FII study on 2007/3/ mA/20bunches10mA/20bunches20mA/20bunches We measured emittance of each bunch in a 20-bunch beam in the DR with a laser- wire monitor. No clear emittance blow-up along a train was observed up to 20mA/train. One of the reason may be the bigger vertical emittance compared with the data taken in pm 0 20 pm

2008 Fast Ion Work at ATF 20pm 2007 Studies will continue with ongoing improvements: lower emittance, controlled pressure bump, etc. New laser wire will be installed by the end of pm 0.1nTorr is OK or not. Hope several 0.1nT OK.

FII at ATF P=1nTorr P=5nTorr P=10nTorr

Fast Kicker R&D Right: Kicker pulse measured from bunch timing scan. Deflection amplitude is as expected from pulsers providing approximately  10 kV. 0.44mrad kick by 30cm strip-line. Pulser: FID FPG KN Maximum output voltage10 kV Rise time, 10 – 90%< 1 ns Rise time, 5 – 95%< 1.2 ns Pulse duration at 90% peak amplitude0.2 – 0.3 ns Pulse duration at 50% peak amplitude1.5 – 2.0 ns Output pulse amplitude stability< 0.7% Maximum pulse repetition frequency6.5 MHz Number of pulses per burst110 (max) Burst repetition frequency5 Hz

12 This results are typical one. Now, fast pulse PS is improved, see next slid.

13 After tuning of th circuit,

14

Output Waveform: No Post-pulse SLAC DR Kicker Modulator Update for ILC2010 Active clamping to eliminate post-pulse Opening Switch Program –Functionally similar to DSRD systems marketed by FID GmbH –“Open source” design –2-ns prototype demonstrated (FY08) –Developing 4-ns modulator for ATF2 C. Burkhart, A. Krasnykh, & T. Tang 5 ns

The time response of the kick field is strongly depends on the waveform of the drive pulse and the length of the strip- line electrode. FID pulser have 1.5ns rise time, 5kV peak voltage, 3MHz and 3000 burst pulse. The time response was tested when the drive pulse was applied to the 30 cm long strip-line electrode. The time response of the strip-line kicker was measured by measuring the betatron amplitude in ATF-DR. The measured rise time was 3ns, which meets the ILC requirement. Single unit test (To confirm 3ns of the rise time of the strip-line kicker) Waveform of FID pulser 5kv peak, 1.5ns rise time

Beam extraction test Extraction kicker The beam extraction test was proposed to confirm the performance of the strip- line kicker. The pulsed magnet kicker was replaced to two units of 60cm long strip-line kicker. To help the lack of the kick angle, a local bump orbit and an auxiliary septum is used. ATF2 Extraction line Damping Ring Kicker pulse Kicker field

Beam extraction test The time sequence is that, 1.10 bunches with 5.6ns bunch spacing beam is injected to the DR three times, 30 bunches total. 2.The local bump orbit is excited gradually after all of beam is damped. 3.The beam is kicked out bunch-by- bunch by the strip-line kicker. 4.The local bump orbit is return to zero.

Beam Extraction succeeded from DR to ATF Oct. 22. Firs Beam extraction was confirmed 2009/Oct/22 by the screen monitor at 2m downstream of the extraction septum. Beam profile at MS1X Single bunch extraction

Jitter 1.05e-6/3e-3=3.5e-4 Jitter 2.24e-6/3e-3=7.4e-4 Distribution of fitted angle at EXT entrance (single bunch) K.Kubo Kick angle measurement

The observed beam profile at the extraction line was same as the extracted beam by the pulsed magnet. The vertical beam profile of the extracted beam was measured by the MS1IP wire scanner, which is located just downstream of the focus point of the the ATF2 beam line. The measured vertical size was 1.4um, which is limited by the wire size. It means that the extracted beam has no deterioration for the vertical beam size. Beam profile of the extracted beam

Plot shows the beam position at MQM16FF BPM. The flattop of the kick field is only 400ps and the jitter increased at the both side of the flat top. The timing of the four pulses needs to careful adjustment. Kick field profile 400ps

DR bunches(3train, 10bunches, 5.6ns bunch spacing) Extracted bunches(308ns bunch spacing, 30 bunches) Multi-bunch extraction Single train (expanded)

Need long term reliability check of fast kicker pulsers We stopped fast kicker beam extraction study because narrow aperture of strip line disturbs high current operation but use fast pulsers for orbit feedback and beam dynamics study. We think the long term reliability study is important but we do not have the resource for this. Impedance measurement of fast kicker strip-line Planning to de it at ATF2 beam line We can use the space in ATF2 beam line for INFN fast kicker Prototype impedance measurement because we can set the appropriate optics and use very precise beam position monitors for the impedance measurement. Strip ceramic supports Tapered stripline Elliptical cross section

Tuning method confirmation for 2pm vertical emittance realization in the ring. Many tuning methods were developed and partial tested. Simulation indicated 2pm or less vertical emittance is possible with precise realignment and beam based alignment in the ring. Beam instrumentation development Improvement of BPM system was done with FNAL at ATF-DR Also, necessary beam instrumentation techniques almost confirmed.

26 Upgrade of Beam Instruments DR BPM readout (FNAL digitizer) EXT Strip-line BPM readout (SLAC-LCLS digitizer) Multi-OTR monitors R&D EXT Laser Wire 4-mirror optical cavity installation Single- and Multi-bunch instability Upgrade of Beam Instruments DR BPM readout (FNAL digitizer) EXT Strip-line BPM readout (SLAC-LCLS digitizer) Multi-OTR monitors R&D EXT Laser Wire 4-mirror optical cavity installation Single- and Multi-bunch instability BPM Circuit upgrade (FNAL) Laser wire monitor JAI(RHUL,Oxford) / KEK

Zone plate image of 1ms exposure SR X-ray beam line XSR beam-size monitor ( Tokyo Univ., KEK ) Real time beam monitor for ATF DR beam tuning  x = 48.2 ± 0.5 [  m]  y = 6.4 ± 0.1 [  m] X-Ray Telescope using Zone Plate at 3.2keV magnification : 20 –Non destructive measurement –High resolution (< 1  m) –2D direct imaging of the electron beam –Real time monitoring (< 1ms)

Laser wire chamber at ATF, Oxford and RHUL Laser wires Goal: non-destructive diagnostics for ILC Studies in ATF extraction line Aim to measure 1  m spot beam Aim at 150ns intra-train scan Presently achieved resolution ~3.0  m (limit by laser quality)

Optics retuning is necessary to recover ultra-low emittance. Beam Optics deformation was checked. Error of Beam Optics Change of alignment West arc section Change of magnets alignment without realignment during long period. Especially, west arc alignment was destroyed by ATF2 floor refurbishment. Also big earthquake requests us precise realignment precisely.

Big difference more than 100  m between BPM center and quad center makes impossible to retune ultra-low emittance. Effect of BPM alignment ( simulated by K.Kubo ) QF1RQF2R SF1R SD1R BH1R Magnet configuration of ATF DR normal cell emittance growth due to the displacement between field center and BPM position BPMs SD1R + I - I /2 BBA ( Beam Based Alignment ) Using trim Coil of sexta, displacement between BPM position and the field center of sexta was measured. BPM misalignment was measured with accuracy of about 30  m and we found big alignment error of about 500  m.

Miscellaneous Circumference correction by chicanes in the ring skip! Circumference correction is very important because of large ring, low momentum compaction, damping wigglers etc. We think this study is not necessary since necessary optics design is not challenging and the control of necessary magnets is not difficult. Wiggler effect done! (many 3 rd PF rings give us data.) Multi-bunch instability precise study Need!

CERN 16 October 08 ATF with wigglers Four wigglers (L=2m, =0.4 m, B=1.4 T) The IBS growth effects after damping are observed at the horizontal beam size, the bunch length and the energy spread. Reduction of damping time and of IBS effect observed with wiggler on

CY ATF long term plan (tentative) Gamma-gamma laser system R&D High Field Physics Nano beam orbit control (FONT extension) Hardware development(2 nmBPM, Fast FB) 2nm stabilization R&D Beam tuning Nano beam orbit control Beam tuning & correction Ultra small beam ~ 20 nm (ATF3)Small beam 37nm realization Hardware development for 4-mirror optical cavity (LAL/KEK) Gamma- gamma collider R&D General Accel. R&D Ex) for KEKB; CSR, RF gun, Instrument develop., Low emittance,… Test beamline for detector? After the big earthquake (recovering the small beam) Application Next KEK load mapGDE