July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.

Slides:



Advertisements
Similar presentations
Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Advertisements

23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
1 Liverpool Production Status Week of 02 March 2007.
Silicon Detector and Micromodule Production: Present Status.
D-Cal production preparations in Japan Dec. 16, 2009, D-Cal meeting at CERN Tatsuya Chujo (Univ. of Tsukuba) for the D-Cal Project 1.
Electrical and thermal testing at Glasgow and Liverpool.
LHCC Comprehensive Review 26/6/06 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps LHCC Comprehensive Review, June 2006 D Cockerill EE  EE large.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
EMB PAR, 23 nov P. Perrodo, LAPP, Annecy1 ATLAS EMB SERIE MODULE CABLING Experience started with three successive prototype modules (module 0) in.
ATLAS Module building at Glasgow
Silicon Preshower for the CMS: BARC Participation
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
EMCAL: project update - Italy - LNF - Frascati Fixture production Module assembly (proto) WLS fibers processing Lead procurement (proto) CT- Catania APD.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 7 July 2003 Sam Burke UCSB HEP Group.
1 November 18, 2014 DOE SC-OPA Review of 12 GeV ENC vs. preamp load FSSR2 by FNAL Single chip on a PCB Load from capacitors SVT module testing.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
RWA, 8/12/2006 Present Preliminary Production Plan All still preliminary, as we are re-establishing production. January 9 th,2007: –Delivery of 2 ring.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
MTest Pixel Telescope – Status Update David Christian September 11, 2007.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
India-CMS Collaboration Meeting Chandigarh, 7-8 Oct 2004 Report to the Collaboration A. Gurtu.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
1 Pixel Detector General –July Evidence of galvanic corrosion in EU barrel cooling tubes. Recovery plan implemented, this problem now solved but…..
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
Status of NA62 straw electronics Webs Covers Services Readout.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
Strasbourg status Ring 7 pilot run François Didierjean.
1 SVT Status Update Yuri Gotra CLAS12 Silicon Vertex Tracker TCB Meeting March 13, 2015.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
The DAMPE STK G. Ambrosi INFN Perugia. The DAMPE Detector Mass: 1480 Kg Power: 600 W Data: 16 Gbyte/day Liftime: 5 years 2.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
Production Database Apollo Go, NCU Taiwan Preshower Silicon PRR July 5, 2001.
ALICE SSD 20 May Yalta G-J Nooren ALICE SSD status.
Dec
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
L. Greiner1IPHC-LBNL Phone Conference 07/10/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps ECAL Plenary, 27 Feb 2007 D Cockerill  VPTs  Electronics and Integration.
Procurement Readiness Review : Detector Fabrication, Qualification & Assembly at India M D Ghodgaonkar Electronics Division, BARC, India.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
July 19, 2012 Anna Peisert1 CERN/Taiwan/Helsinki production center Work share Institutes/people Status of preparations.
2 Oct C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop.
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
10/month is the present production rate 2 FTE + sporadic contributions
Preparations for test of
アトラスシリコン半導体飛跡検出器:ATLAS Silicon-strip Tracking Detector
PROGRESS on EE VPTs, Dees D Cockerill
Presentation transcript:

July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC

July 20, 2007Anita Topkar, BARC Strip detector production for fabricating 1000 micromodules has been completed Assembly of micromodules was launched in September, 2006 in the presence of Dr Anna Peisert, CERN Production of 1000 modules has been completed 870 modules have been shipped to CERN 130 modules are ready for dispatch

July 20, 2007Anita Topkar, BARC The first lot of 120 Nos of modules was shipped to CERN from BARC in Dec, 2007 The second lot of 300 and 450 modules has been shipped in March, 2007 from BEL The third lot of 130 Nos will be shipped in August, 2007

July 20, 2007Anita Topkar, BARC Reception tests were carried out on 120 modules (first lot) during CERN visit in Jan- Feb, 07 All detectors were tested for temperature cycling tests ( C) Bonding tests were carried out on all detectors for checking quality of film and optimization of bonding parameters for ‘Indian Sensors’ The data of all tests carried out during assembly has been entered into the CRISTAL data base

July 20, 2007Anita Topkar, BARC Additional 100 detectors are to be supplied to CERN without assembly. The production of these detectors is underway at BEL

July 20, 2007Anita Topkar, BARC Micromodule Assembly Detector stability test and visual inspection Gluing on ceramic tiles Visual inspection, total current and stability test at ceramic level Gluing on Al tiles Visual inspection, total current and stability test at Al tile level

July 20, 2007Anita Topkar, BARC

July 20, 2007Anita Topkar, BARC Gluing of the detectors on jigs Gluing on the CeramicGluing on the Al Tile

July 20, 2007Anita Topkar, BARC Gluing on the Ceramics (Ten detectors at a time)

July 20, 2007Anita Topkar, BARC Gluing on the Al tiles (Ten detectors at a time)

July 20, 2007Anita Topkar, BARC Total leakage current of detectors after gluing on ceramic & Al tiles (First fifty modules - The sensors were fabricated in 2003)

July 20, 2007Anita Topkar, BARC First lot of mico modules made under the supervision of Dr Anna Peisert

July 20, 2007Anita Topkar, BARC Preshower Assembly: Schedule

July 20, 2007Anita Topkar, BARC Activities involved Front end PCBs, hybrid mounting Bare  module production Full  module production & testing – hybrid reception tests, wire bonding, pull test, functional testing Ladder production and testing – Ladder assembly,system mother board, functional testing, temp cycling Cosmic ray testing – Ladder for ES+ - Dee1 plane1, ES+ Dee1 plane2, ES+ Dee2 plane1, ES+ Dee2 plane2 Ladder for ES Cabling

July 20, 2007Anita Topkar, BARC Dee construction – Gluing Pb/Al/cooling screens,etc, Ladder mounting on Dees - ES+ - Dee1 plane1, ES+ Dee1 plane2, ES+ Dee2 plane1, ES+ Dee2 plane2 ES Mount each ladder on absorber plate Test each ladder using temporary cables Test full control ring of ladders Repeat till all ladders are mounted Final Dee construction Test full ES (cold) – ES+ and ES- Installation of ES+ Installation of ES-