Final Project I need your proposal about the final project! It should include –Title –Group members –Objective –Short description –Methodology –Expected.

Slides:



Advertisements
Similar presentations
Chapter 3. HVAC Delivery Systems
Advertisements

Heating, Ventilating, and Air-Conditioning
Objectives Control Terminology Types of controllers –Differences Controls in the real world –Problems –Response time vs. stability.
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
Components of HVAC System
HVAC: heating, ventilating, and air conditioning this is a thermostat: it sends signals to the heating/cooling system.
VAV DESIGN FOR IMPROVED INDOOR AIR QUALITY. “Air conditioning is the control of the humidity of air by either increasing or decreasing its moisture content.
HVAC Systems Overview HVAC Overview - # 1 Tom Lawrence
Announcement Course Exam October 6 th (Thursday) In class: 90 minutes long Examples are posted on the course website.
Lecture Objectives: Model processes in AHU –Use eQUEST predefined models –Use detail modeling Define your topics for your final project.
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Lecture Objectives: Finish wit introduction of HVAC Systems Introduce major ES software.
Lecture Objectives: Model HVAC Systems –HW3 Asignemnet Learn about eQUEST software –How to conduct parametric analysis of building envelope.
Lecture Objectives: Final discussion about HW3 Introduce more final project topics Continue with HVAC Systems.
Lecture Objectives: Learn about automatic control Use life-cycle cost analysis integrated in eQUEST.
Lecture Objectives: Model processes in AHU –Use eQUEST predefined models –Use detail modeling Define your topics for your final project.
Equation solvers Matlab Free versions / open source codes: –Scilab MathCad: Mathematica:
Important variables Water: Air: Conversion:
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Lecture Objectives: Finish with software intro HVAC Systems
Lecture Objectives: -Discuss the final project presentations -Energy simulation result evaluation -Review the course topics.
Project group members and presentation time Thursday Chris Holcomb Cristian Wolleter Michelle Noriega Mei Baumann, Zahid Alibhai, Ellie Azolaty Randy Maddox.
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
Objectives Discuss final project deliverables Control Terminology
Announcements 1) Thursday 02/09 In class Midterm Exam - I will be in the classroom at 9:20 AM - Example and solution are posted on the course website 2)
Lecture Objectives: -Discus Final Project -Learn about Solar Systems -HW3 (final HW assignment) -HVAC system.
Energy Plus & Open Studio Class
Objectives Finish DOAS Control Terminology Types of controllers
Lecture Objectives: -Define the midterm project -Lean about eQUEST -Review exam problems.
Announcement Course Exam November 3rd In class: 90 minutes long Examples will be posted on the course website.
Announcement Course Exam November 3rd In class: 90 minutes long Examples will be posted on the course website.
Development of a new Building Energy Model in TEB Bruno Bueno Grégoire Pigeon.
Announcement Course Exam October 6 th (Thursday) In class: 90 minutes long Examples are posted on the course website.
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
Lecture Objectives: Differences in Conduction Calculation in Various Energy Simulation Programs Modeling of HVAC Systems.
Lecture Objectives: Define the final project Deliverables and Grading policy Analyze factors that influence accuracy of our modeling study Learn about.
Announcement Course Exam: Next class: November 3rd In class: 90 minutes long Examples are posted on the course website.
Final Project Format and Deliverables Examples
Lecture Objectives: Answer question related to HW 4 Learn about Life Cycle Cost Analysis (LLC) tools in eQUEST Learn about specifics related to modeling.
Lecture Objectives: Accuracy of the Modeling Software.
Lecture Objectives: Learn about detailed vs. empirical modeling Discuss accuracy of energy modeling Introduce life-cycle cost analysis –integrated in eQUEST.
Chapter 14 Heating, Ventilation & Air conditioning (hvac)
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Lecture Objectives: Discuss Final Project
Objectives Finish analysis of most common HVAC Systems
We need to decide about the time for the final project presentation
Lecture Announcement Developing Concrete with a Structural and Thermal Insulation Performance and Homogenous and Stratified Approach Dr. Mauricio Lopez.
Heating, Ventilating, and Air Conditioning
Lecture Objectives: Discus Final Project Learn about Solar Systems
Lecture Objectives: Answer questions related to HW 4
Announcement No project presentations !
Lecture Objectives: Finish with HVAC systems
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Lecture Objectives: Answer questions related to HW 4
Heating, Ventilating, and Air-Conditioning
VAV DESIGN FOR IMPROVED INDOOR AIR QUALITY
Objectives Discuss Project 1 (eQUEST) Learn about HVAC Systems
October 31st In class test!
Lecture Objectives: Discus Final Project Learn about Solar Systems
Lecture Objectives: Discuss HW4 parts
Make up: Project presentation class at the end of the semester
Announcement No project presentations !
FBE03: Building Construction & Science
Lecture Objectives: Show example of life-cycle cost analysis
Announcements Exam 1 Next Class (Thursday, March 14th):
Objective Revie the Cooling Cycle Learn about air distribution systems
Chapter 11: DESCRIPTION OF HVAC SYSTEMS
Presentation transcript:

Final Project I need your proposal about the final project! It should include –Title –Group members –Objective –Short description –Methodology –Expected outcome 1 to 2 page long.

Lecture Objectives: Building-System-Plant connection –HVAC Systems Accuracy of the Modeling Software

eQUEST HVAC Models Predefined configuration (no change) Divided according to the cooling and heating sources Details in e quest help file: For example: DX CoilsNo Heating –Packaged Single Zone DX (no heating) Packaged single zone air conditioner with no heating capacity, typically with ductwork. –Split System Single Zone DX (no heating) Central single zone air conditioner with no heating, typically with ductwork. System has indoor fan and cooling coil and remote compressor/condensing unit. –Packaged Terminal AC (no heating) Packaged terminal air conditioning unit with no heating and no ductwork. Unit may be window or through-wall mounted. –Packaged VAV (no heating) DX CoilsFurnace Packaged direct expansion cooling system with no heating capacity. System includes a variable volume, single duct fan/distribution system serving multiple zones each with it's own thermostatic control. –Packaged Single Zone DX with Furnace Central packaged single zone air conditioner with combustion furnace, typically with ductwork. –Split System Single Zone DX with Furnace Central single zone air conditioner with combustion furnace, typically with ductwork. System has indoor fan and cooling coil and remote compressor/condensing unit. –Packaged Multizone with Furnace Packaged direct expansion cooling system with combustion furnace. System includes a constant volume fan/distribution system serving multiple zones, each with its own thermostat. Warm and cold air are mixed for each zone to meet thermostat control requirements.

Air-conditioning in Air Handling Unit (AHU) Compressor and Condenser Roof top AHU Gas/Electric Heater to building Fan air from building fresh air Evaporator filter mixing hot water cool water Return fan Supply fan flow control dampers AHU Fresh air AHU schematic Outdoor air To room ExhaustFrom room

Processes in AHU presented in Psychrometric in psychrometric OA Case for Summer in Austin IA MA SA

Refrigeration Cycle T outdoor air T cooled water Cooling energy (evaporator) Released energy (condenser) - What is COP? - How the outdoor air temperature affects chiller performance?

Integration of HVAC and building physics models Building Heating/Cooling System Plant Building Heating/Cooling System Plant Load System Plant model Integrated models Q buiolding Q including Ventilation and Dehumidification

Example of System Models: Schematic of simple air handling unit (AHU) m - mass flow rate [kg/s], T – temperature [C], w [kg moist /kg dry air ], r - recirculation rate [-], Q energy/time [W] Mixing box

Energy and mass balance equations for Air handling unit model – steady state case m S is the supply air mass flow rate c p - specific capacity for air, T R is the room temperature, T S is the supply air temperature. w R and w S are room and supply humidity ratio - energy for phase change of water into vapor The energy balance for the room is given as: The air-humidity balance for room is given as: The energy balance for the mixing box is: ‘r’ is the re-circulated air portion, T O is the outdoor air temperature, T M is the temperature of the air after the mixing box. The air-humidity balance for the mixing box is: w O is the outdoor air humidity ratio and w M is the humidity ratio after the mixing box The energy balance for the heating coil is given as: The energy balance for the cooling coil is given as:

Cooling coil model To enable coupling of air handling unit model with the chiller model We need cooling coil model: Models gives a relationship between the supply temperature (T ref_in ) and return temperature (T ref_out ) of the circulating fluid for a given mass flow rate (m ref ) of this fluid thorough the cooling coil E = f(T air_in,w air_in,T r_in, m air,m ref ) Also, it depends on the cooling coil geometry and type of circulating fluid (water or refrigerant) The cooling coil effectiveness (E) describes this relationship: Air Cooling coil m air m ref T r_in T r_out T air_in w air_in T air_out w air_out

Non-air system Radiant panel heat transfer model

The total cooling/heating load in the room The energy extracted/added by air system The energy extracted/added by the radiant panel: T he radiant panel energy is: The energy extracted/added by the radiant panel is the sum of the radiative and convective parts:

Integration of HVAC and building physics models Building Heating/Cooling System Plant Load-System-Plant model does not work in cases when HVAC components radiate to other surfaces We have to use Integrated models: T w_out m w, T w_in External weather parameters T surrounding surfaces T surrounding surfaces Q rad_plant Solve simultaneously system of equation or use iterative procedure.

Accuracy of Building Energy Simulation Tool Large number of: –Analytical –Numerical –Empirical models for energy and mass transfer calculation in building envelope and building systems

Modeling steps Define the domain Analyze the most important phenomena and define the most important elements Discretize the elements and define the connection Write the energy and mass balance equations Solve the equations (use numeric methods or solver) Present the result

Accuracy of energy simulation There are many different factors for inaccuracy of energy simulation results …..... …….

Accuracy of energy simulation Depends on 2 Assumptions - simplification which you introduced to solve the problem - level of details in your analytical and numerical models 1 Input data –geometry –material properties –weather data –operation schedule 3 Numerical methods - used to solve equations from analytical and numerical models Find the balance ! Always think what you want to achieve (what kind of analysis you want to provide)

How to check the accuracy of numerical model? Comparison wit existing analytical solutions

How to check the validity of the larger simulation models? Building room: large number of analytical and Numerical equations (sub-models) Energy balance

How to evaluate the whole building simulation tools Two options: 1)Comparison with the experimental data - monitoring - very expensive - feasible only for smaller buildings 2) Comparison with other energy simulation programs - for the same input data - system of numerical experiments - BESTEST

BESTEST Building Energy Simulation TEST System of tests (~ 40 cases) - Each test emphasizes certain phenomena like external (internal) convection, radiation, ground contact -Simple geometry -Mountain climate COMPARE THE RESULTS

Example of best test comparison

What are the reasons for the energy simulation Design (sizing of different systems) Economic benefits Impact on environed Budget planning

Basic purpose of HVAC control Daily, weekly, and seasonal swings make HVAC control challenging Highly unsteady-state environment Provide balance of reasonable comfort at minimum cost and energy Two distinct actions: 1) Switching/Enabling: Manage availability of plant according to schedule using timers. 2) Regulation: Match plant capacity to demand