Sufficiently Complex Connection Involving Pipeline Construction and/or System Reinforcement Project Sequence.

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Mod 373 “Governance of NTS Connection Processes”
Review Group 0166 Review of Necessary Reform of NTS Offtake Arrangements 20 th September 2007 Beverley Grubb SGN.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
What is Design?. Engineering design is the communication of a set of rational decisions obtained with creative problem solving for accomplishing certain.
Mod 0273: 1 st Development Group Workshop 4 th February 2010.
Flowchart TA. Maram Al-Khayyal.
Chapter 3 Project Initiation
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
Frequency Co-ordination -for what? The Agreement Frequency Co-ordination -Advantages Frequency Co-ordination -Disadvantages The Procedure Administrative.
Designing a Product Product design is usually a problem that requires a creative Design and/or manufacturing solution.
ABET 1 SAYS - Your Senior Design Course Should Include Engineering design is the process of devising a system, component, or process to meet desired needs.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Project planning. Software project management Informal definition of management – The art of getting work done through other people Software project management.
Water Services Trust Fund The Urban Projects Concept (UPC) Implementation Workshop for WSPs and the Field Monitors Training Workshop Engineering Options.
6-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 6 Estimating Project,
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
I n t e g r a t I n g C S S Practitioner Module 4 1 Module 4: CSS in Corridor and Sub-area Planning.
Prof. A. Taleb-Bendiab Room 605 A. Taleb-Bendiab, Module: Research Methods,
Warm-Up Rules of Engagement Office hours are in the afternoons, unless you have made other arrangements. If the door is open, I’m in the area come look.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Capital Project Process
Sunday, 04 October 2015 UNC Mod Action WG0505: Provide for discussion/development the potential categories of connection offer and associated timescales.
Geotechnical & Civil Engineering Studies Future Circular Colliders (FCC)
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Quote + SP Energy Networks are keen to improve the service we provide to our Customers. Quote + has been developed to provide our Customers with a higher.
Software Project Management By Deepika Chaudhary.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 4 Project Scope Management.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
FOOD ENGINEERING DESIGN AND ECONOMICS
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Topic 5 Initiating a project
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
Mod 0273: Governance of Feasibility Study Requests to Support Changes to Network Exit Agreements – National Grid NTS Response.
AT FPS Bridge Planning Expectations 1 Bridge Planning Seminar 2008.
Lecture(3) Sequence of Studies for a Single Major – Infrastructure Projects 1 A preliminary (or reconnaissance) report. 2 A feasibility report.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Ofgem Review Group on Energy Market Issues for Biomethane Projects (EMIB) Update on Issues REA Biogas Group the voice of the UK Biogas industry since 2004.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Costs and Cash Flows Estimation. Engineering Economic Analysis - Seven Steps 1. Recognition and formulation of the problem. 2. Development of the feasible.
PARCA Demonstration Data Information Flow Diagram Footnote:- No set timescales – timescales will be agreed by the Project Team Phase 0 Phase 1 Phase 2.
Transcarpathian Regional Council Zahony Development Company Beregovo District Administration Municipal government of village Diyda ENPI Cross-border Cooperation.
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Contract management 1. Acquiring software from external supplier This could be: a bespoke system - created specially for the customer off-the-shelf -
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Chapter 33 Estimation for Software Projects
Chapter 6: Database Project Management
An alternative approach…..
NWA Suitability Criteria
Initiating systems development
Software Engineering: A Practitioner’s Approach, 6/e Chapter 23 Estimation for Software Projects copyright © 1996, 2001, 2005 R.S. Pressman & Associates,
UNC Modification Proposal 0373
Unit 4 Project Design, implementation and evaluation
Chapter 33 Estimation for Software Projects
Software Engineering: A Practitioner’s Approach, 6/e Chapter 23 Estimation for Software Projects copyright © 1996, 2001, 2005 R.S. Pressman & Associates,
Exit Capacity Substitution and Revision
Mod 0621 Amendments to Gas Transmission Charging Regime
Review Group /09/2007.
Proposed Transitional Gas Exit Arrangements
Chapter 26 Estimation for Software Projects.
Intent for use of capability replaces Service-Resource and unifies network and virtual network (stimulated by discussion on TAPI Virtual Network) Nigel.
Presentation transcript:

Sufficiently Complex Connection Involving Pipeline Construction and/or System Reinforcement Project Sequence

Project Elements Initial Enquiry Feasibility Study Conceptual Design Construction Detail Design

Initial Enquiry Enquiry is sufficiently complex as detailed by the DN’s Statement of Principles and Methods for Determining Connections Charges – Licence Ref. 4B. Generally at this stage (depending on the specific enquirer’s request) NGN will normally issue the following: A desktop assessment of the availability of supply. A quotation for a Feasibility Study and associated timescales. If possible a “ballpark estimate” of costs – This is usually based on pipeline cost curves and other costs from previous projects.

Feasibility Study Detailed network analysis. Establish design alternatives. Establish pipeline route corridors. Develop principles from desktop study information to reach informed cost effective decisions based on engineering and environmental constraints. Formulate a cost estimate (usually base cost + 30%) to allow high level decisions).

Conceptual Design Investigate design alternatives further. Reduce risk and increase cost estimate accuracy. Develop/refine solutions and options. Define the essential elements and options for detailed design. Formulate a cost estimate (usually base cost + 15%) to allow high level decisions.

Detailed Design Confirm pipeline route. Initiate easement negotiations. Confirm pipeline and/or reinforcement (e.g. offtake upgrades) design parameters. Detailed routing study to fine tune pipeline routes. Detailed design drawings for pipeline, special crossings, pressure reduction equipment etc.. Detailed project programme. Materials identified and maybe ordered.

Possible Variations For a small simple connection a feasibility, conceptual and detailed design studies may be one or the same thing. Easement negotiations can be problematical. Environmental surveys can be seasonal dependant.

Points to Note DN transmission connections/enquiries are: Small in number Bespoke Dealt with by one or two people and so receive personal attention with continual dialogue Flexible to meet customers needs Have agreed timescales and milestones