Wire and Cathode Planes - Current Concept (work in progress) PPD Internal Review – 2 nd Part April 19 th, 2005 Rafael Silva FLARE Fermilab Liquid Argon.

Slides:



Advertisements
Similar presentations
Structural Steel Construction
Advertisements

Basic Refrigeration Cycle
SPL Intercavity support Conceptual design review 04/11/ A. Vande Craen TE/MSC-CMI.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
Pipe Supports and Restraints
Equilibrium Equilibrium refers to a condition in which an object is at rest originally at rest (static equilibrium) or has a constant velocity if originaly.
Bridge Design Project Using SolidWorks and SolidWorks Simulation to design, test and build structures.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Senior Design: Validation of Design December 15, 2008.
ENGR 220 Section 13.1~13.2.
Overview of Phobos Magnet Designed by Harald Enge Built by Danfysik Technical summary: –“Double dipole” design –15.5 cm air gap –Max. 2 Tesla field –378.
General idea of a couple of check rod system and adjustments
REINFORCED CONCRETE Reinforced concrete is a composite material which utilizes the concrete in resisting compression forces, and steel bars and/or.
Strength of Material Shear Strain Dr. Attaullah Shah.
Process and Product Engineering Markets: Liquid Food Industry Pharma and Medical Industry Scientific Research Aerospace Industry CATI-A Design Pro/E Design.
Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 1 GERDA Detector Mounting The Detector Holders Detector.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Physics 111 Practice Problem Statements 12 Static Equilibrium SJ 8th Ed.: Chap 12.1 – 12.3 Contents 13-5, 13-7, 13-17*, 13-19*, 13-20, 13-23, 13-25, 13-28*,
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
Structural option for the Jinping neutrino central detector Contributor : Yuanqing Wang, Zongyi Wang Speaker : Zongyi Wang Department of civil engineering,
STRENGTHS Chapter Intro Dealing with relationship between the external loads applied to an elastic body and the intensity of the internal forces.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
FLARE Constructing the detector First FLARE Workshop November 4-6, 2004 Rafael Silva Fermilab / PPD / MD Fermilab Liquid Argon Experiments.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
TPC Design Concept: From MicroBooNE to LAr20
Copyright © 2009 Pearson Education, Inc. An object with forces acting on it, but with zero net force, is said to be in equilibrium. The Conditions for.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Inner Triplet Review Q1, Q2, and Q3 Mechanics T. Nicol April 24-25, 2007.
DIFFUSER HARDWARE REPORT V. Blackmore J. Cobb, M. Dawson, J. Tacon, M. Tacon.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
David Finley, Fermilab / October 3, 2005 on LArTPC Slide 1 LArTPC: Large Liquid Argon TPC for the NuMI Off-axis Beam First Point: Try to recognize intellectually,
CLAS12 Drift Chamber Review Mechanical Engineering Presented by David Kashy – Hall B Lead Engineer.
LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype.
CLAS12 Drift Chamber Prototyping
February 2010Hans Jostlein1 Cellular Design for a Large Liquid Argon TPC Detector - Design goal -Cellular Design -Additional Possibility: -Light Detection.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
LARP Collaboration Meeting Racetrack Coil Fabrication
Large Wire Chambers Or “To boldly go where nobody has gone before” –Frame chambers (say up to 5x5 meters) usually made on winding machines –Cylindrical.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Concept Design for LBNF Far detector (LAr single phase)
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Structures What things do I need to find out in order to predict if what I design will stand up to the use I intend to put it through?
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
G-10 CPA March 2016 Bill Sands. Design Criteria Structure must support the CPA panels and Field Cage Differential contractions must be identified and.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
RuggedPOD Proto 1 bugs SDS team Wolfe Engineering.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
Recent Changes to the FD TPC Design Bo Yu Oct. 20, 2015.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
PRESSURE VESSEL. 1.Determine the bursting steam pressure of a steel shell with diameter of 10 inches and made of ¼ in thick steel plate. The joint efficiency.
Installation of the T600 at Fermilab
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
INSTALLATION SEQUENCE
Cedric Garion, TE-VSC-DLM, WP12
Pressure vs height (solid CPA plane)
Far Detector Activities Late 2017 – Early 2018
First of all we will remind some numbers:
TPC Support and Constraint TPC Support
Design of Distribution Feedbox at LHC P7
SiD Engineering Status Report
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Introduction of fuel feed system
as a prototype for Super c-tau factory
Presentation transcript:

Wire and Cathode Planes - Current Concept (work in progress) PPD Internal Review – 2 nd Part April 19 th, 2005 Rafael Silva FLARE Fermilab Liquid Argon Experiments

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 2Overview (Model by Chuck Grimm) 6 Wire Sectors, each containing 6 Wire Planes 7 Cathode Planes Trusses (schematic) Inner Tank Active volume Diameter: 40m Height: 30m

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 3

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 4

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 5 Detector 6 signal wire sectors, each containing 6 wire planes 6 signal wire sectors, each containing 6 wire planes 7 cathode planes, and 7 cathode planes, and field shaping tubes in between them. field shaping tubes in between them.

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 6 Wire plane sectors 6 wire planes in each sector: +30°  induction ½ chamber -30°  induction vertical  collection ½ chamber -30°  induction +30°  induction { {

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 7 Read out wires Units: meters

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 8 Some wire sector numbers: Wire diameter = 150  m Wire diameter = 150  m Spacing between wires = 5 mm (  ) Spacing between wires = 5 mm (  ) Spacing between planes = 5 mm Spacing between planes = 5 mm Maximum wire length = 38 m Maximum wire length = 38 m Total amount of wires = 302,000 Total amount of wires = 302,000 Read-out wires = 223,000 Read-out wires = 223,000 Total amount of wire= 6,800 km Total amount of wire= 6,800 km

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 9 General wire plane requirements:  Robust, long life system, minimizing wire rupture possibility and consequences  Wire position variations should occur smoothly and uniformly  Laid out to provide short read-out cables  Unobtrusive size and packaging  Safe and time/cost efficient assembly  Withstand tensioning and cooldown, including effects from the tank

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 10 “Effects from the tank” Roof truss max. vertical deflection:  With own weight: - 2 cm  At max. capacity (900 kg/m):-16 cm  Add internal pressure (10 kPa):+ 8 cm At Liquid Ar temperature (in equilibrium):  No change in truss vertical deflection  Radial contraction of tank: 5 cm

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 11 Some wire numbers: Tensioning weight = 1.3 kg Tensioning weight = 1.3 kg Max. elongation = 14 cm Max. elongation = 14 cm Max. thermal contraction = 14 cm Max. thermal contraction = 14 cm Max. stereo wire sag = 2 cm Max. stereo wire sag = 2 cm

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 12

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 13 Wire Tensioning Top end is connected to a G-10 board and the other end is connected to a weight Top end is connected to a G-10 board and the other end is connected to a weight Pulleys are staggered and pre- assembled in groups to panels to be located by rails attached to the tank Pulleys are staggered and pre- assembled in groups to panels to be located by rails attached to the tank Prototype required Prototype required

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 14 Pulleys on side wall Model by Chuck Grimm Wire by Petros Rapidis!

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 15 Wire spacers  Placed every 3 m or less, prevent broken wires from touching cathode planes  Make wire spacing uniform  Relax requirements on wire tension uniformity  Stabilize wires electrically  Reduce areas affected by shorts in case of breakages

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 16 Wire Material Same kind as used by Icarus Same kind as used by Icarus Good candidate: vacuum re-melted (for internal defects) austenitic (304, 302) stainless steel, C.W. to 2 GPa tensile strength, 100% eddy-current tested (for external defects) Good candidate: vacuum re-melted (for internal defects) austenitic (304, 302) stainless steel, C.W. to 2 GPa tensile strength, 100% eddy-current tested (for external defects) Load tested, including after installation Load tested, including after installation Cost is relatively low (~ 100 k$ total) Cost is relatively low (~ 100 k$ total)

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 17 Wire holding method Wires have looped ends, in the same fashion utilized by Icarus: wrapping the wire around itself. Wires have looped ends, in the same fashion utilized by Icarus: wrapping the wire around itself.

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 18 Does this work? Good indications: Icarus has 50,000 wires installed in this fashion Icarus has 50,000 wires installed in this fashion They had no breakage or unwinding so far They had no breakage or unwinding so far Good results in preliminary testing Good results in preliminary testing More testing required More testing required

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 19 G-10 Board holding mechanism: Requirements:  Prevent dropping of parts  Minimize assembly mistakes  Allow alignment  Distribute load evenly  Inexpensive

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 20 Board holding mechanism concept

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 21 Field shaping cage (Model by Bartoszek Engineering) Field shaping cage (Model by Bartoszek Engineering)

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 22 Assembly: preliminary thoughts It can be done sequentially, from one end to another or from the center out It can be done sequentially, from one end to another or from the center out Welding should be done prior to wire installation as much as possible Welding should be done prior to wire installation as much as possible Cleanliness is essential Cleanliness is essential Wires can be attached to G-10 boards and spooled into drums prior to assembly Wires can be attached to G-10 boards and spooled into drums prior to assembly Platforms built into the trusses maybe used for mounting the boards Platforms built into the trusses maybe used for mounting the boards

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 23 Issues  No “show stopper” has been identified: much fewer uncertainties than CDF/COT had, for instance (mainly due to stringent wire positioning requirements)  Cost is very sensitive to manufacturing processes due to high number of components  Likewise, high number of components also makes a successful time schedule is very sensitive to adequacy of planning  Prototyping and testing of individual components is the natural course of action for a project like this

Fermilab Liquid Argon Experiments

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 25

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 26 Wire: preliminary tests

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 27 Test results: 2 wraps around the pin and 4 wraps around itself were enough to prevent unwinding. 2 wraps around the pin and 4 wraps around itself were enough to prevent unwinding. Pulleys are a reliable and simple way to guide the wires - better than bare rods. Pulleys are a reliable and simple way to guide the wires - better than bare rods.

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 28 Pulleys mounted to the side Drawing by Chuck Grimm

04/19/05FLARE - Wire and Cathode Planes Rafael Silva 29 Wire board holding mechanism