03-02-18C.Bohm, K.Jon-And Digitizer Status Tilecal Institute Meeting 03-02-18.

Slides:



Advertisements
Similar presentations
BTEC First Engineering
Advertisements

1 Integration Testing CS 4311 I. Burnstein. Practical Software Testing, Springer-Verlag, 2003.
The MAD chip: 4 channel preamplifier + discriminator.
BTEC First Engineering
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ Proposal of the ECAL CW base modification + Anatoli, Michail ( Michail Soldatov.
This presentation is intended only for the individual or entity to which it is addressed and may contain information that is the Confidential and/or Proprietary.
Status of the Optical Multiplexer Board 9U Prototype This poster presents the architecture and the status of the Optical Multiplexer Board (OMB) 9U for.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Uli Schäfer 1 JEM1: Status and plans JEM1.1 Status Plans.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
ELECTRONIC/COMPUTER AGE. Electronic/Computer Age  Electronics –Electrical signals can carry information quickly over wires or through the air by radio.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Overview Test Interface (TIU PCB‘s) are extremely expensive.
Low Cost TDC Using FPGA Logic Cell Delay Jinyuan Wu, Z. Shi For CKM Collaboration Jan
The printed circuit board (PCB) design
Applied Technology High School ATE 1012 Grade 10 Eng. Rose Hasan.
We make hot joints.. 2 Who we are. Originally part of a leading international handheld repair and rapid prototyping company, Repair point was formed *
Various Topics Related to FEB Liang Han, Ge Jin University of Science and Technology of China Dec.21,2013.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Evaluation of the Optical Link Card for the Phase II Upgrade of TileCal Detector F. Carrió 1, V. Castillo 2, A. Ferrer 2, V. González 1, E. Higón 2, C.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
TTCrx Issues M.Matveev Rice University December 17, 2009.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
CHAPTER 8 Developing Hard Macros The topics are: Overview Hard macro design issues Hard macro design process Physical design for hard macros Block integration.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
Status of NA62 straw electronics Webs Covers Services Readout.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
1 Integration Testing CS 4311 I. Burnstein. Practical Software Testing, Springer-Verlag, 2003.
Troubleshooting Equipment Containing Integrated Circuits Jimmie Fouts Houston County Career Academy.
Implementing a 10 Gb/s VCSEL Driven Transmitter for Short Range Applications Irfan N. Ali Michael C. Clowers David S. Fink Sean K. Garrison Jeff A. Magee.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
1 Calorimeter electronics Upgrade Outcome of the meeting that took place at LAL on March 9th, 2009 Calorimeter Upgrade Meeting Barcelona March 10th-11st,
The InGaAs IR Array of Chunghwa Telecom Laboratory Chueh-Jen Lin and Shiang-Yu Wang, Optics and Infrared Laboratory In 2006, Advanced Technology Laboratory.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
M.N Minard Trigger Validation Board Status Cyril Drancourt, Pierre-Yves David,Victor Coco, M.N Minard - Production status - TVB tests on Cryo side.
Control voltage 0 to 8 V driver supply voltage 3.3 to 5 V 3.3 to 5 V control pulse rising edge (there is a 49.9 Ω term. resistor hidden under here!) 100.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – December TOTFED – TOTEM Front End Driver VME64x Host Board OptoRX Firmware.
Straw readout status Status and plans in Prague compared with situation now Choke and error Conclusions and plans.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
1 CERN - 19/03/2016 Claudio Bortolin CLAUDIO BORTOLIN INFN – PD / CERN.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
Need for Quality Management Jim Stewart Dune Collaboration meeting UT Arlington January 13 th 2016.
발표자 : 이재신 발표 일시 : Chapter 2 Hardware Fundamentals for the Software Engineer The embedded-systems software engineer must often understand.
Week 22: Schematic Week 23-Week 27: Routing Gerber files have been available since 9th July 1st prototype: – PCB manufacturer: supervised by KIT – Cabling:
M.N Minard Trigger Validation Board Tests and Implantation Cyril Drancourt, Pierre-Yves David,Victor Coco, Thomas Chouvion,M.N Minard - Production status.
A Different Soldering Class “Surface Mount Soldering”
Development of T3Maps adapter boards
Pre-Processing electronics Maintenance Hardware - Firmware
Status of NA62 straw readout
LKr status R. Fantechi.
TileCal upgrade EVO meeting Demonstrator tesks
COVER Full production should arrive today
DT Infrastructure: LV, HV, Gas
FEE Electronics progress
VELO readout On detector electronics Off detector electronics to DAQ
University of California Los Angeles
Preliminary CSC Trigger Results from September Testbeam
Integration Testing CS 4311
Computers Chapter 17 Lesson 4.
Step by Step Process of BGA Reballing
Presentation transcript:

C.Bohm, K.Jon-And Digitizer Status Tilecal Institute Meeting

C.Bohm, K.Jon-And Outline The TTCrx grounding problem The BCID readout problem Production time schedule

C.Bohm, K.Jon-And The TTC grounding problem Some missing ground connections on the TTC-rx gave rise to intermittent errors. Problem not discovered in Stockholm due to low read out rate of test bench. After grounding the open inputs the faults disappear. Action: 4 open inputs must be grounded on all boards A new Stockholm test bench is being built to discover these kind of errors

C.Bohm, K.Jon-And Action plan: Fix 700 not mounted boards. Print a modified pattern onto already manufactured boards using thick film techniques, then mount the boards as usual. Procedure should be verified within a week. Fix 1400 already mounted boards. A more difficult problem. Done partly at our institute in parallel with testing above 700 boards, partly by a vendor:

C.Bohm, K.Jon-And Repair plan of mounted boards 1. Desolder TTCrx from the boards. Done in our institute. Rather easy, 2 minutes per board (in total about 50 hours). 2.Remove solder. Done in our institute. More difficult, 6 minutes per TTCrx (in total about 140 hours). 3.Print grounding pattern on bottom of TTCrx. 30 seconds per board. Done by us at M A Kapslingsteknik. 4.Harden the conductive paste in a nitrogen oven. At Ericsson once per day. Done by M A Kapslingsteknik. 5.Reballing the TTCrx. 9 at a time into the oven. Done by M A Kapslingsteknik. 6.Remounting the TTCrx. Perhaps 10 minutes per board. Done by us in collaboration with SMD production, our mounting vendor (in total about 240 hours). Two persons at our institute work half time about 11 weeks.

C.Bohm, K.Jon-And BCID read out problems At the recent TileCal expert week it was found that the BCID readings were unreliable.  This was found to be due to set-up and hold time violations which occurred since the output timing of the TTCrx chip was changed between different batches.  In the electronics meeting 4 different remedies were suggested:  Change of a clock driver to a faster component (“driver solution”)  Resistor delay clk_des_1 (not preferred)  Capacitor delay clk_des_1 (not preferred)  Replace clk_des_1 with clk (“clock solution”)

C.Bohm, K.Jon-And Comparison of ”driver” and ”clock” solution ”Driver”-solution Recent tests indicate time budget is safe. Time margin in worst case w.r.t. TTCrx clock is 1.3 ns. Some more tests are needed, e.g. with LV and temperature variations. Clean easy ”patch” (change a component). New components have to be burnt-in and radiation tested. ”Clock”-solution Safe timing solution. Patch not as clean as for driver. Incompatible with Sthlm link interface used in Sthlm. Takes 1 month to change interface.

C.Bohm, K.Jon-And Tentative time schedules 3/3Decision of BCID solution ”Driver”-solution 14/3: 20 boards QC and sent to ”expert week”. 21/3: 20 boards to C-F if OK. 24/3: 20 ”printed” boards to C-F 14/4: 50 boards to C-F 21/4: 50 boards to C-F 28/4 … 100 boards per week. ”Clock”-solution” 7/3: 20 boards to ”expert week” before QC 11/4: 20 QC boards to C-F. 14/4: 20 ”printed” boards to C-F 5/5: 50 boards to C-F 11/5: 50 boards to C-F 18/5 … 100 boards per week. N.B. These are AGRESSIVE time schedules.