PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.

Slides:



Advertisements
Similar presentations
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Advertisements

PACS IQR Kick-off ESTEC, 13 Jan 2005 PACS Management, …1 PACS Management, Funding and Schedule Otto H. Bauer MPE Garching.
1 Schedule Risk Assessment (SRA) Overview July 2013 NAVY CEVM.
Twinning Project RO2006/IB/EN/09 1 Saxony-Anhalt State Environmental Protection Agency Wolfgang GarcheBukarest Wolfgang Garche Saxony-Anhalt.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
PACS IBDR 27/28 Feb 2002 Herschel PACS SPU - IAC1 Herschel PACS - IBDR SIGNAL PROCESSING UNIT - SPU - HW Unit, Start-up SW and Low-level SW Drivers José.
Chapter 5 IT Processes Presented by Dr. Mohamed Sammouda.
Managing the Information Technology Resource Jerry N. Luftman
PACS IIDR 01/02 Mar 2001 Herschel PACS SPU - IAC1 Herschel PACS - IIDR SIGNAL PROCESSING UNIT (SPU) HW Unit, Start-up SW and Low-level SW Drivers José.
1 Tell10 Guido Haefeli, Lausanne Electronics upgrade meeting 10.February 2011.
Library Automation: Planning and Implementation
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
PACS IBDR 27/28 Feb 2002 SPU High Level Software1 H. Bischof, A.N. Belbachir (TUVIE) F. Kerschbaum, R. Ottensamer, P. Reegen, C. Reimers (UVIE)
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
Foundations of Technology.  To familiarize students with the function, applications, and requirements of construction management.
PACS IBDR 27/28 Feb 2002 PA/QA Status1 PA/QA STATUS MPE /PACS/IGL.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
PACS IQR 13 Jan 2005 PACS OBSW1/33 PACS On-board Software & User Manual A. Belbachir (UVIE/TUVIE, SPU) H. Feuchtgruber (MPE, SE) A. Mazy (CSL, DMC) S.
VIRGO Control System Upgrade: Multi-DSP Board Alberto Gennai INFN Pisa LIGO-G Z.
PACS IQR 13 Jan 2005 IHDR Close-out1 Close-out of IHDR: Concerns / Recommendations A. Poglitsch.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
4W DC/DC converter Specifications TECHNICAL FEATURES : –Power : 4 W –Input Voltage : 22V to 37V –Output Voltage : One Adjustable Output above 3 adjustable.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
PACS IQR 13 Jan 2005 First Assessment1 The PI’s Self-Assessment A. Poglitsch.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.
SP04 Production Lev Uvarov RICE Muon Trigger Meeting August 27, 2004.
PACS IBDR 27/28 Feb 2002 Digital Processing Unit1/16 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
PentiumPro 450GX Chipset Synthesis Steen Larsen Presentation 1 for ECE572 Nov
PACS IBDR 27/28 Feb 2002 OBSW Simulation1 PACS OBSW Simulation/Test A.Mazy (CSL), S.Pezzuto (IFSI), A.N.Belbachir (TUVIE), H. Feuchtgruber (MPE)
Reliability Applied to KM3NET
CPU/BIOS/BUS CES Industries, Inc. Lesson 8.  Brain of the computer  It is a “Logical Child, that is brain dead”  It can only run programs, and follow.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
THE MICROPROCESSOR A microprocessor is a single chip of silicon that performs all of the essential functions of a computer central processor unit (CPU)
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
PACS 12/13 November 2003 PACS PA/QA IHDR1 PACS PA / QA STATUS Documentation overview Cooperation with PA/QA responsibles -outlook- NCR Status System documents.
February Monthly Status Review (MSR) Note: No presentation this month
PACS SVR22/23 June 2006 Warm Electronics1 Warm Electronics: Components/Subsystems Test Results B. Voss PACS SVR.
PACS IBDR 27/28 Feb 2002 PACS ICC1 ICC (EGSE, IA/QLA, HCSS) Otto H. Bauer MPE Garching.
Project Management Processes for a Project
3 He Fridge SPIRE WE Review Dec. 6-7, IFSI 1 3 He Sorption Fridge “Cooler” WE Preliminary Design Presented by: L. Rodriguez / CEA/SAp. Subsystem.
PACS IHDR12/13 Nov 2003 Warm Electronics1 Warm Electronics: Overview, Interfaces, Grounding and EMC Martin von Berg PACS IHDR.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PA/QA Status1 O.H. Bauer MPE Garching PA/QA Status.
MobiDick4 progress report Carlos Solans. Introduction MobiDICK is a complete test bench for super-drawers Will be used during the maintenance in the long.
Double Star Progress Meeting #3 Beijing 2 July, 2002.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Exploitation of ISS Scientific data - sustainability
Experience with an IT Asset Management System
Operating Systems Chapter 5: Input/Output Management
Single-Phase Qualification of Microcircuits in ESCC 9000
Overview 1. Inside a PC 2. The Motherboard 3. RAM the 'brains' 4. ROM
Failover mechanisms if available
PSS0 Configuration Management,
Presentation transcript:

PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI

PACS IHDR 12/13 Nov 2003 Digital Processing Unit2/15 FUNDING AND DELIVERY CRITICALITY FACT: IFSI has got no funds from ASI after 2001, that has prevented attendance at meetings, reviews, support during integrations…… FACT: the ASI-Carlo Gavazzi Space contract has been extended up to 31/01/2004 PREDICTION: from now up to 31/01/2004 a new contract/addendum will be issued taking into account the PD#4 items (e.g. the SW reset of the IEEE-1355 chip); the new contract/addendum will expire at the end of 2004 FACT: the lack of funds, the stop of CGS activities (waiting for the PD#4 ASI approval) and the present HW problems have driven a very critical DPU/ICU Herschel schedule

PACS IHDR 12/13 Nov 2003 Digital Processing Unit3/15 Design status (1/2) -During the AVM tests a random loss of the 1355 links has been detected and investigations are in progress to identify the source of the problem -At present the IFSI unit is at CGS to carry out the investigation -The analysis (thanks also to CSL, IAC and MPE for their help!) has shown that consecutive addressing of the STD-1553 Dual Port RAM and of the IEEE-1355 Dual Port RAM causes the loss of the 1355 links. The HW is now suspect. -The design of the HW boards (contracted to Carlo Gavazzi Space) will be corrected in EQM and FM to include the necessary modifications resulting from the fixing of the above problem

PACS IHDR 12/13 Nov 2003 Digital Processing Unit4/15 DESIGN STATUS (2/2) AVM SW nearly completed; missing items: new OBCP and autonomy function (to be implemented when available) patching uploading of OBCP implemented but not tested other types of patching not addressed Burst mode implemented but not thoroughly tested upgrading of the VIRTUOSO O.S.: waiting for an offer from WIND RIVER New OBS image uploadable with the BOOT SW

PACS IHDR 12/13 Nov 2003 Digital Processing Unit5/15 SW DOCUMENTATION SSD: is in progress, issue 1 should be available by the end of November (SW requirements inserted, logical model and architecture design revised) DDD: a new issue will be ready after the SW is stabilized SVVP: a new issue was circulated according to S. Thurey’s comments. Some comments require a new document layout and a new release will be issued asap in line with IFSI manpower

PACS IHDR 12/13 Nov 2003 Digital Processing Unit6/15 BUDGETS FOR FM (1/2) (ACTUAL MASS INFERRED FROM AVM BOARDS) Box weight (mechanics):3037 g CPU Boards (2 of): 960 g I/F Boards (2 of): 640 g DC/DC Boards (2 of) (E):1000 g Motherboard: 520 g Screws etc.: 100 g Cabling (E): 300 g Conformal coating (E): 420 g TOTAL (E) 6977 g (+-200 g)

PACS IHDR 12/13 Nov 2003 Digital Processing Unit7/15 BOX INTERFACE CONTROL DRAWING

PACS IHDR 12/13 Nov 2003 Digital Processing Unit8/15 BUDGETS FOR FM (2/2) TOTAL ESTIMATED POWER (DC/DC CONVERTER EFFICIENCY = 70%): 14.6 W

PACS IHDR 12/13 Nov 2003 Digital Processing Unit9/15 CPU BOARD DSP RAM FPGA EPROM 20 MHz IEEE-1355 MEZZANINE JTAG

PACS IHDR 12/13 Nov 2003 Digital Processing Unit10/15 I/F BOARD FIFOS S/S I/FsA/D Conv. 16 MHz 1553B ( S/C I/F) Long Stub Trafos “A” and “B” FPGA NOT FOR PACS

PACS IHDR 12/13 Nov 2003 Digital Processing Unit11/15 DPU

PACS IHDR 12/13 Nov 2003 Digital Processing Unit12/15 AIV FLOW

PACS IHDR 12/13 Nov 2003 Digital Processing Unit13/15 EQM SCHEDULE (TENTATIVE)

PACS IHDR 12/13 Nov 2003 Digital Processing Unit14/15 FM SCHEDULE (TENTATIVE)

PACS IHDR 12/13 Nov 2003 Digital Processing Unit15/15 PA/QA ACTIVITIES ALL COMPONENTS ARE BOUGHT THROUGH THE CO-ORDINATED PARTS PROCUREMENT AGENCY FOR INDUCTORS AND TRANSFORMERS RELEVANT RFAs AND PADs ISSUED NO RE-FLOW SOLDERING IS FORESEEN: ALL HAND MADE SOLDERS (INCLUDING SMD) BY ESA QUALIFIED PERSONNEL ENVIRONMENTAL QUALIFICATION TESTS ARE SCHEDULED FOR QM UNITS (A REDUCTION SET OF TESTS, ON THE GROUNDS OF SIMILARITY, IS UNDER EVALUATION) ENVIRONMENTAL ACCEPTANCE TESTS ARE SCHEDULED FOR FM UNITS (A REDUCTION SET OF TESTS, ON THE GROUNDS OF SIMILARITY, IS UNDER EVALUATION)